{"id":438750,"date":"2026-08-20T22:16:07","date_gmt":"2026-08-20T22:16:07","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/438750\/"},"modified":"2026-08-20T22:16:07","modified_gmt":"2026-08-20T22:16:07","slug":"high-speed-rail-ceo-in-fresno-5-things-to-know","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/438750\/","title":{"rendered":"High-speed rail CEO in Fresno: 5 things to know"},"content":{"rendered":"\n<p>\t\t\t\t\t\t<img width=\"1140\" height=\"474\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/08\/ian-choudri-hsr-rotary-081726.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"man speaks at podium\" decoding=\"async\" fetchpriority=\"high\"  \/>\t\t\t\t\t\t<\/p>\n<p class=\"attach_desc\">California High-Speed Rail Authority CEO Ian Choudri addresses the Fresno Rotary Club on Monday, Aug. 17, 2026. Photo by Gabriel Dillard<\/p>\n<p dir=\"ltr\">California High-Speed Rail Authority CEO Ian Choudri brought his pitch for the nation\u2019s first true high-speed rail system to the Fresno Rotary Club on Monday, laying out a timeline for track installation, testing and eventual service while acknowledging a multibillion-dollar funding gap that could send the Authority back to state lawmakers.<\/p>\n<p dir=\"ltr\">Here are five things to know from his remarks.<\/p>\n<p>1. Track installation is set to begin this year<\/p>\n<p dir=\"ltr\">Choudri said the Authority plans to begin laying track toward the end of this year along the 119-mile stretch under active construction in the Central Valley. Overhead wires to power the trains will be installed alongside the track, he said. A consortium of Kiewit, Stacy and Witbeck and Herzog will handle the 25-kilovolt AC track and systems installation, and the first materials are expected to arrive by rail at a staging facility in Wasco in November.<\/p>\n<p dir=\"ltr\">Choudri reports that 61 major structures are now complete across the first 119 miles, at 71% completion.<\/p>\n<p>2. Trains could start testing by 2029 and carry passengers by the early 2030s<\/p>\n<p dir=\"ltr\">Choudri said train testing is planned for 2029 to 2030, with passenger service targeted for 2032 to 2033. Siemens and Alstom are providing the rolling stock, he said. The trains are designed for a top speed of 220 mph, faster than the 180-to-200-mph top speeds Choudri said are common in Europe, though he noted a train needs roughly 11 to 12 miles to reach full speed and another 12 to slow down, so actual speeds will depend on the distance between stops.<\/p>\n<p dir=\"ltr\">That timeline is more optimistic than a recent assessment from the Authority\u2019s inspector general. An Aug. 11 review by Inspector General Ben Belnap found the project\u2019s schedule could slip to as late as September 2034 and warned the Authority could exhaust its funding by December 2027 without new financing. The same reporting found the Authority recently cut its initial trainset order from six to three.<\/p>\n<p>3. Fresno has the edge for a major maintenance hub<\/p>\n<p dir=\"ltr\">The Authority is weighing two sites \u2014 one in Fresno and one in Kings County near Hanford \u2014 for its proposed <a href=\"https:\/\/thebusinessjournal.com\/high-speed-rail-maintenance-facility-fresno-hanford\/\" target=\"_blank\" rel=\"noopener nofollow\">Central Valley Heavy Maintenance Facility,<\/a> which would service the train fleet and, at full buildout, employ an estimated 1,700 to 2,100 workers. Choudri signaled where the Authority may lean.<\/p>\n<p dir=\"ltr\">\u201cFresno is more favorable for a lot of reasons,\u201d he said.<\/p>\n<p dir=\"ltr\">A public comment period on the site runs through Sept. 14, with public meetings scheduled in Fresno, Hanford and online.<\/p>\n<p>4. The Authority is courting private money \u2014 and facing a shortfall<\/p>\n<p dir=\"ltr\">Choudri said the Authority is turning to private development groups to invest and build alongside the project, drawing interest from three or four major developers and signing a deal with one so far. In June, the Authority executed a co-development agreement with Momentum Alliance Partners, a global consortium that Choudri said represents pension funds from around the world.<\/p>\n<p dir=\"ltr\">The Authority is also expected to select a partner this month under its CalClean initiative to invest in green energy, with an agreement execution targeted for September, Choudri said. The partner has not been named.<\/p>\n<p dir=\"ltr\">Even so, Choudri acknowledged a shortfall of nearly $10 billion and said the Authority might have to return to the Legislature and the administration for more money.\u00a0<\/p>\n<p>5. Choudri says the scope and speed make it one of a kind<\/p>\n<p dir=\"ltr\">Choudri framed the project as unlike anything attempted in the country, citing its scale and 220-mph design speed.<\/p>\n<p dir=\"ltr\">\u201cThis is a true high-speed rail system that has never been within the U.S.,\u201d he said.<\/p>\n<p dir=\"ltr\">He put the full cost at roughly $130 billion, above the Authority\u2019s own $126.1 billion estimate in its 2026 business plan, and said ticket prices would be standardized, similar to high-speed systems elsewhere in the world. To help cover costs, the Authority\u2019s co-development partner could pursue ancillary revenue including fiber-optic and broadband leasing along the corridor and development on state-owned property.<\/p>\n<p>\t\t\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"California High-Speed Rail Authority CEO Ian Choudri addresses the Fresno Rotary Club on Monday, Aug. 17, 2026. Photo&hellip;\n","protected":false},"author":2,"featured_media":438751,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31],"tags":[25432,512,112,114,113,174049,26969,34569,8076,1967],"class_list":["post-438750","post","type-post","status-publish","format-standard","has-post-thumbnail","category-fresno","tag-california-high-speed-rail-authority","tag-central-valley","tag-fresno","tag-fresno-headlines","tag-fresno-news","tag-heavy-maintenance-facility","tag-high-speed-rail","tag-ian-choudri","tag-infrastructure","tag-transportation"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/438750","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=438750"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/438750\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/438751"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=438750"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=438750"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=438750"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}