{"id":464921,"date":"2026-09-15T22:42:18","date_gmt":"2026-09-15T22:42:18","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/464921\/"},"modified":"2026-09-15T22:42:18","modified_gmt":"2026-09-15T22:42:18","slug":"l-a-city-bikeway-mileage-tanked-in-fiscal-year-25-26","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/464921\/","title":{"rendered":"L.A. City Bikeway Mileage Tanked in Fiscal Year 25-26"},"content":{"rendered":"<p class=\"wp-block-paragraph\">This is Streetsblog L.A.\u2019s annual review of the past year of L.A. City bikeway implementation \u2013 the good, the bad, and the meh. In Fiscal Year 2025-26, the city\u2019s output was 16.2 lane-miles of new or improved bike facilities. This is less than half of the <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2025\/11\/18\/l-a-city-fiscal-year-24-25-bikeway-mileage-buoyed-by-completed-paths\">35.6 miles completed last fiscal year<\/a>, and is just over half of the city\u2019s ~30 miles\/year average for the past decade. It is the lowest annual total since FY 2018-19.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"1085\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/LADOTannualbikewaychart2026.png\" alt=\"\" class=\"wp-image-228640\"  \/>Annual L.A. City bikeway implementation \u2013 graph by Michael MacDonald<\/p>\n<p class=\"wp-block-paragraph\">Bikeway mileage data is from the Transportation Department\u2019s (LADOT) FY2425 bikeways list [<a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/docs.google.com\/spreadsheets\/d\/e\/2PACX-1vSuoW5-B0ZB8ZdLDqOmp75dT-t1Sa4f4Uyg5poDNd_1uEMtced0hcx32X9qBBFFzfiyRhovU7cI35Zv\/pubhtml\">page 2<\/a>], reconciled in\u00a0<a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/docs.google.com\/spreadsheets\/d\/e\/2PACX-1vSuoW5-B0ZB8ZdLDqOmp75dT-t1Sa4f4Uyg5poDNd_1uEMtced0hcx32X9qBBFFzfiyRhovU7cI35Zv\/pubhtml\">SBLA\u2019s annual spreadsheet<\/a>. This post uses LADOT\u2019s \u201clane-miles\u201d standard, which counts a two-way one-mile-long facility as totaling two lane-miles.  <\/p>\n<p class=\"wp-block-paragraph\">The FY25-26 19-mile total includes\u00a07.5 miles\u00a0of\u00a0new\u00a0bikeways, 5.3 miles of removed bikeways, and 14.1 miles\u00a0of\u00a0bikeway upgrades.<\/p>\n<p class=\"wp-block-paragraph\">You read that right, L.A. removed five miles of bike lanes. More on this below, but for the East San Fernando Valley light rail, Metro and LADOT chose to <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/07\/27\/new-terra-bella-bike-lanes-partially-replacing-van-nuys-bike-lanes\">\u201creplace\u201d existing Van Nuys Boulevard bike lanes with a shorter stretch on Terra Bella Street<\/a>.<\/p>\n<p class=\"wp-block-paragraph\">This annual SBLA post tallies higher quality projects (though bicyclists disagree on what constitutes a quality bikeway). Overall, this year\u2019s output was mostly higher quality. Not counting bike routes (generally\u00a0<a href=\"https:\/\/usa.streetsblog.org\/2016\/01\/14\/study-sharrows-dont-make-streets-safer-for-cycling\" target=\"_blank\" rel=\"noopener nofollow\">near-worthless sharrows<\/a>), this year\u2019s (quality net) output was\u00a01.1 new lane\/path lane-miles. The city managed to add only just over one new lane-mile to its bike lanes\/paths network in a full year. Significant quality upgrades\u00a0(upgrades resulting in protected bikeways) totaled\u00a09 lane-miles, much of it in Griffith Park and on MLK. These upgrades are positive and needed, but they do not further extend the city\u2019s inadequate bike network at all.<\/p>\n<p class=\"wp-block-paragraph\">The quality projects total 10.1 miles this year, compared to\u00a0<a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2025\/11\/18\/l-a-city-fiscal-year-24-25-bikeway-mileage-buoyed-by-completed-paths\">35 miles last year<\/a>. <\/p>\n<p class=\"wp-block-paragraph\">Below are some factors that influenced this year\u2019s output:<\/p>\n<p>Project Delays \u2013 L.A. is having a difficult time getting bike projects done. Delayed projects are sometimes watered down, sometimes canceled. As the timelines drag out, project supporters are subjected to multiple rounds (often years) of public input meetings and <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/bsky.app\/profile\/lintonjoe.bsky.social\/post\/3mtubft7mbk25\">car-centric surveys<\/a>. The city too often <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/laist.com\/news\/transportation\/california-active-transportation-grants\">cancels grant-funded projects, forfeiting the funding received<\/a>.<br \/>The most high profile delay example is Forest Lawn Drive bike lane improvements, initially <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2023\/08\/10\/l-a-looks-to-upgrade-forest-lawn-bike-lanes-to-protected\">announced in 2023 as expected to be installed in 2024<\/a>, then <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2024\/12\/19\/cemeteries-push-to-bury-forest-lawn-drive-safety-improvements\">delayed for several years<\/a>. In May, <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/08\/21\/deadly-forest-lawn-crash-reinforces-push-for-safety-improvements-paused-by-mayor-bass\">Mayor Karen Bass formally directed city departments to pause the safety upgrade<\/a>; now it appears that <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/08\/29\/breaking-forest-lawn-drive-safety-poison-pill-inserted-at-last-minute-in-state-bill\">state legislation could kill the project<\/a>. <br \/>Many less high profile bike projects \u2013 <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/03\/09\/bike-updates-griffith-park-chandler-blvd-terra-bella-st-and-westside-plans\">Chandler Boulevard<\/a> (now <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/07\/13\/eyes-on-the-street-progress-on-chandler-center-running-bike-lanes\">under construction<\/a>), <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/02\/09\/councilmember-yaroslavsky-calls-for-urgent-city-response-to-westwood-driver-killing-three-people\">Westwood Boulevard<\/a>, <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/09\/01\/bike-shorts-pasadena-ciclavia-map-griffith-park-imperial-hwy-and-hollywood-blvd\">Sunset Boulevard<\/a>, <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/02\/17\/this-week-in-livable-streets-485\">Marmion Way<\/a>, <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/www.redeemercp.org\/jefferson-beautiful\">Jefferson Boulevard<\/a>, the L.A. River (<a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2025\/10\/01\/metro-l-a-river-path-project-delays-and-rising-costs\">central<\/a> and <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2025\/09\/17\/metro-planning-committee-approves-85m-for-bike-ped-project-grants\">Valley<\/a> projects), <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2023\/11\/22\/how-neighboring-nimbys-fought-the-expo-bike-path-and-how-the-northvale-gap-is-finally-getting-built\">Exposition path<\/a>, etc. \u2013 have suffered significant delays.<\/p>\n<p>Street Resurfacing Changes to Resist to ADA\/HLA\u00a0\u2013 For at least the past half-dozen years, LADOT has installed many new bikeways and upgrades during Bureau of Street Services (StreetsLA) road resurfacing. This connection was largely broken over the past year, when StreetsLA changed resurfacing practices, largely to avoid installing features now required <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/02\/27\/disrespectful-and-infuriating-l-a-s-progress-on-making-streets-safe-and-accessible-for-disabled-people-stalled-for-decades\">under ADA (Americans with Disabilities Act)<\/a> and <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/03\/05\/measure-hla-at-two-years-a-timeline-of-how-l-a-city-has-resisted-safer-multimodal-streets\">Measure HLA (Healthy Streets L.A.)<\/a>. From July through much of April, <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2025\/12\/11\/whats-so-awful-about-l-a-citys-shift-to-large-asphalt-repair\">StreetsLA stopped fully resurfacing streets<\/a>, instead shifting to <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/02\/17\/updates-on-l-a-city-stopping-resurfacing-instead-doing-large-asphalt-repair\">inefficient \u201clarge asphalt repair\u201d<\/a> [<a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/www.instagram.com\/reel\/DSaNQ7TgQlI\/\">video explainer<\/a>]. Then, from late April through June, StreetsLA <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/05\/11\/l-a-street-services-is-resurfacing-some-streets-again\">resumed some resurfacing<\/a>, though <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/06\/04\/l-a-city-shifts-repaving-practice-again-now-repaving-only-streets-with-no-sidewalks\">they focused almost entirely on resurfacing streets without sidewalks<\/a> [<a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/www.instagram.com\/reel\/DcCdDTZv4om\/\">video explainer<\/a>] and avoided streets designated for bikeways. <br \/>Previously, resurfacing typically coincided with 5-15 miles of new\/upgraded bikeways. In FY25-26, no new bike bikeway coincided with resurfacing. Just two upgrade projects (Sherman Way and part of MLK) coincided with about 2.9 bikeway-lane-miles of resurfacing.<\/p>\n<p>Protected Bikeway Hardening \u2013 This year, LADOT began reporting a new category of bikeway projects: \u201chardening.\u201d The department has been adding new <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2025\/09\/04\/eyes-on-the-street-l-a-city-adds-more-concrete-barrier-requests-feedback\">concrete<\/a> and <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/bsky.app\/profile\/streetsblogla.bsky.social\/post\/3mfmf5czae22h\">rigid plastic barriers<\/a>, mainly to beef up existing plastic-bollard-protected bike lanes. This new hardening is welcome and makes cyclists safer. Streetsblog has included newly hardened mileage as bikeway upgrades.<\/p>\n<p>The Good<\/p>\n<p><a rel=\"noopener noreferrer\" target=\"_blank\" href=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/3rdSt2025Aug20_02.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"2768\" height=\"1799\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/3rdSt2025Aug20_02.jpg\" alt=\"\" class=\"wp-image-220989\"  \/><\/a>New low concrete Toronto Barrier protection on 3rd Street<\/p>\n<p class=\"wp-block-paragraph\">One of the most promising LADOT initiatives last year was the the <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2025\/08\/20\/eyes-on-the-street-new-concrete-barrier-protection-on-3rd-street-bikeway\">city\u2019s first Toronto Barriers, on 3rd Street in downtown Los Angeles<\/a>. Modular <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/www.instagram.com\/reel\/DaA5jOChiIs\/\">Toronto Barriers<\/a> are built out of concrete and stand about two feet tall, sort of like a mini-Jersey Barrier. Third Street\u2019s <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2025\/09\/04\/eyes-on-the-street-l-a-city-adds-more-concrete-barrier-requests-feedback\">overall installation<\/a> measures about 600 feet \u2013 from Main Street to Spring Street. The concrete bike lane protection says strong and permanent and safe in ways that the city\u2019s typical plastic-bollard-protection cannot.<\/p>\n<p><a rel=\"noopener noreferrer\" target=\"_blank\" href=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/MartinLutherKingJrBlvd2026Aug28_01.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"1689\" height=\"1271\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/MartinLutherKingJrBlvd2026Aug28_01.jpeg\" alt=\"\" class=\"wp-image-228579\"  \/><\/a>Recent parking-protected bike lanes on Martin Luther King Jr. Boulevard<\/p>\n<p class=\"wp-block-paragraph\">As part of a Metro grant-funded first\/last mile <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/ladotlivablestreets.org\/projects\/MLK\">project<\/a>, LADOT and StreetsLA upgraded a couple of miles of Martin Luther King Jr. Boulevard. The MLK project mainly added new parking-protection to existing unprotected bike lanes between Central Avenue and Broadway Place (plus sharrows east of Central) and sidewalk improvements. <\/p>\n<p class=\"wp-block-paragraph\">The MLK Blvd. improvements are complete, and the project is set to install protected bike lanes on two more streets (39th Street and Broadway Place) this fall.<\/p>\n<p><a rel=\"noopener noreferrer\" target=\"_blank\" href=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/ZooDrGriffithPark2026Aug18_01.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"2856\" height=\"2142\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/ZooDrGriffithPark2026Aug18_01.jpeg\" alt=\"\" class=\"wp-image-228641\"  \/><\/a>Newly protected bike lanes on Zoo Drive in Griffith Park<\/p>\n<p class=\"wp-block-paragraph\">In response to a <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/www.latimes.com\/california\/story\/2022-04-20\/man-accused-of-killing-griffith-park-cyclist-charged-with-murder\">fatal car vs. cyclist hit-and-run crash in 2022<\/a>, the city is slowly upgrading some bicycle facilities in Griffith Park. In FY25-26, the city <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/03\/09\/bike-updates-griffith-park-chandler-blvd-terra-bella-st-and-westside-plans\">added plastic bollard protection along nearly all of Zoo Drive<\/a>. Installation also got underway for protection along much of Crystal Springs Drive, too, but was <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/09\/01\/bike-shorts-pasadena-ciclavia-map-griffith-park-imperial-hwy-and-hollywood-blvd\">not completed until after July<\/a>, so it will be included in next year\u2019s totals.<\/p>\n<p><a rel=\"noopener noreferrer\" target=\"_blank\" href=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/HollywoodBlvd2026Sep11_07.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"2051\" height=\"2643\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/HollywoodBlvd2026Sep11_07.jpeg\" alt=\"\" class=\"wp-image-228642\"  \/><\/a>Recently installed hard plastic Zicla \u201cZipper\u201d modular lane dividers (sometimes called <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/bsky.app\/profile\/streetsblogla.bsky.social\/post\/3mfmf5czae22h\">armadillos<\/a>) on Hollywood Boulevard<\/p>\n<p><a rel=\"noopener noreferrer\" target=\"_blank\" href=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/HollywoodBlvd2026Sep11_05.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"1369\" height=\"1363\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/HollywoodBlvd2026Sep11_05.jpeg\" alt=\"\" class=\"wp-image-228643\"  \/><\/a>Other types of recently installed hard plastic Zicla barriers\/posts on Hollywood Boulevard (along with earlier plastic bollards)<\/p>\n<p class=\"wp-block-paragraph\">When the city <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2024\/08\/15\/soto-martinez-raman-and-ladot-celebrate-hollywood-boulevard-safety-upgrades\">opened new parking-protected bike lanes on Hollywood Boulevard in 2024<\/a>, they included plastic bollards to keep drivers out of the bikeway. Though many drivers avoid the plastic bollards, some run over them, destroying or damaging them, making the protected bikeway less effective, less safe. The city has been taking steps toward addressing this by adding new hard-plastic barriers (sometimes called <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/www.instagram.com\/reel\/DVJRShaAd6_\/\">\u201carmadillo\u201d protection<\/a>, though that is a brand name) to existing protected bike lanes, including on Hollywood Boulevard.<\/p>\n<p><a rel=\"noopener noreferrer\" target=\"_blank\" href=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/Spring2025Aug14_01.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"2477\" height=\"1611\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/Spring2025Aug14_01.jpg\" alt=\"\" class=\"wp-image-220871\"  \/><\/a>Recent armadillo-type plastic protection on Spring Street<\/p>\n<p><a rel=\"noopener noreferrer\" target=\"_blank\" href=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/Adams2025Aug14_03.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"2060\" height=\"1692\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/Adams2025Aug14_03.jpg\" alt=\"\" class=\"wp-image-220870\"  \/><\/a>Armadillo-type delineators on Adams Boulevard buffered bike lanes <\/p>\n<p class=\"wp-block-paragraph\">LADOT similarly added <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2025\/08\/14\/eyes-on-the-street-new-armadillo-type-bike-lane-delineators-on-adams\">hard plastic barriers along Spring Street<\/a> downtown, and <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2025\/08\/14\/eyes-on-the-street-new-armadillo-type-bike-lane-delineators-on-adams\">along Adams Boulevard<\/a> in South Los Angeles.<\/p>\n<p><a rel=\"noopener noreferrer\" target=\"_blank\" href=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/HobartBlvd2026Feb04_06.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"2507\" height=\"1731\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/HobartBlvd2026Feb04_06.jpeg\" alt=\"\" class=\"wp-image-223936\"  \/><\/a>Recent Hobart Boulevard bike lanes<\/p>\n<p class=\"wp-block-paragraph\">On <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/02\/04\/new-bike-lanes-on-hobart-blvd-in-hollywood\">Hobart Boulevard, the city added about a lane-mile of mostly buffered unprotected bike lanes<\/a> from Hollywood Boulevard to Fountain Avenue, plus a stretch of sharrowed bike route below Fountain.<\/p>\n<p>The Meh<\/p>\n<p class=\"wp-block-paragraph\">Some worthwhile new bikeways are just too short for Streetsblog to be excited about.<\/p>\n<p><a rel=\"noopener noreferrer\" target=\"_blank\" href=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/LaurelCynBlvd2026Feb05.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"1748\" height=\"1228\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/LaurelCynBlvd2026Feb05.jpeg\" alt=\"\" class=\"wp-image-228608\"  \/><\/a>Short new plastic-bollard-protected bike lane on Laurel Canyon Boulevard<\/p>\n<p class=\"wp-block-paragraph\">The city added one block (nearly 600 feet) of new southbound protected bike lane on Lauren Canyon Boulevard from Hamlin Street to Victory Boulevard in North Hollywood. The welcome but short facility extends <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2024\/05\/06\/san-fernando-valley-bus-bike-updates-g-line-roscoe-bus-lanes-laurel-canyon-bike-lanes\">modest bike lane improvements nearby completed in 2023<\/a>.<\/p>\n<p><a rel=\"noopener noreferrer\" target=\"_blank\" href=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/2ndSt2026Apr22_01.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"2750\" height=\"1843\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/2ndSt2026Apr22_01.jpeg\" alt=\"\" class=\"wp-image-225584\"  \/><\/a>Short new plastic-bollard-protected bike lane on 2nd Street downtown<\/p>\n<p class=\"wp-block-paragraph\">LADOT added about 250 feet of <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/04\/24\/friday-bike-updates-new-2nd-street-bike-lane-and-two-upcoming-ciclavias\">new eastbound bike lane on 2nd Street<\/a>, across from the Metro Historic Broadway Station. This nearly one block of bike lane should have been installed alongside the new station when the city required Metro construction to widen the street in 2023, but <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2023\/10\/11\/metro-responds-to-missing-downtown-connector-bikeways-agency-followed-undefined-plans-prioritized-getting-drivers-to-freeway\">at that time the city and Metro partnered to add an additional car turn lane, instead of a bicycle connection to the station<\/a>.<\/p>\n<p><a rel=\"noopener noreferrer\" target=\"_blank\" href=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/ShermanWay2026Aug09_01.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"2559\" height=\"1257\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/ShermanWay2026Aug09_01.jpeg\" alt=\"\" class=\"wp-image-228609\"  \/><\/a>New buffers along existing Sherman Way bike lanes<\/p>\n<p class=\"wp-block-paragraph\">The city took advantage of resurfacing to modestly improve a half-mile of Sherman Way bike lanes, adding a new buffer to existing lanes.<\/p>\n<p>The Bad<\/p>\n<p><a rel=\"noopener noreferrer\" target=\"_blank\" href=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/TerraBellaSt2026Jul26_01.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"1168\" height=\"863\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/TerraBellaSt2026Jul26_01.jpeg\" alt=\"\" class=\"wp-image-227531\"  \/><\/a>New bike lanes on Terra Bella Street<\/p>\n<p class=\"wp-block-paragraph\">In order to maximize on-street parking along <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/category\/agency-watch\/metro\/east-san-fernando-valley-transit\">Metro\u2019s under-construction East San Fernando Valley light rail project<\/a>, the city permanently removed existing bike lanes on Van Nuys Boulevard, \u201creplacing\u201d then with <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/07\/27\/new-terra-bella-bike-lanes-partially-replacing-van-nuys-bike-lanes\">new bike lanes on nearby Terra Bella Street<\/a>.<\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/la.streetsblog.org\/2026\/03\/09\/bike-updates-griffith-park-chandler-blvd-terra-bella-st-and-westside-plans\" target=\"_blank\" rel=\"noopener nofollow\">Streetsblog covered this project in detail<\/a>, noting that the replacement bikeway falls short on both quantity and quality. Overall Metro\/LADOT are removing ~5.3 lane-miles (0.9 protected) while adding back just ~4.9 lane-miles (all unprotected). The <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/07\/27\/new-terra-bella-bike-lanes-partially-replacing-van-nuys-bike-lanes\">premise of this swap is fundamentally anti-bike<\/a>. Instead of connecting bicyclists to light rail, the city and Metro shunted cyclists away from destination-rich Van Nuys Boulevard onto somewhat out-of-the-way, largely residential Terra Bella.<\/p>\n<p>Notes on reconciling reported mileage<\/p>\n<p class=\"wp-block-paragraph\">Each year Streetsblog reconciles LADOT reported bikeway data with on-the-ground conditions. For example, LADOT did not include the new 3rd Street Toronto Barrier in this year\u2019s bikeway list. <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/docs.google.com\/spreadsheets\/d\/1C4rwhuWuvYfThrLi_r1OVZhS7KCiLZKQBtQsQOLFvfQ\/edit?usp=sharing\">SBLA\u2019s annual bikeway mileage spreadsheet<\/a> includes both the unedited LADOT report, and SBLA\u2019s revised version.<\/p>\n<p class=\"wp-block-paragraph\">For FY25-26 LADOT reported the new Terra Bella lanes, but not the Van Nuys bike lane removal. In August <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/ladot.lacity.gov\/dotnews\/weekly-update-august-06-2026\">the DOT newsletter acknowledged the removal<\/a>, noting that Terra Bella \u201creplace[d] bike lanes on Van Nuys that were removed.\u201d<\/p>\n<p><a rel=\"noopener noreferrer\" target=\"_blank\" href=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/VanNuysBlvd2026Jul26_02.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"2279\" height=\"1708\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/09\/VanNuysBlvd2026Jul26_02.jpeg\" alt=\"\" class=\"wp-image-228644\"  \/><\/a>Van Nuys Boulevard bike lanes, partially removed, photographed in August<\/p>\n<p class=\"wp-block-paragraph\">Light rail construction is well underway on Van Nuys Boulevard, and though some parts of the bike lanes are still there, the facility is partially dismantled. Because the removal and install are both part of the same project, SBLA included both in this year\u2019s totals.<\/p>\n<p class=\"wp-block-paragraph\">Streetsblog generally uses the city\u2019s reported mileage where it is very close to Google Maps measurements, which it typically is. For what it\u2019s worth, using the city figures led to slightly different mileage reported above, compared to SBLA\u2019s <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/07\/27\/new-terra-bella-bike-lanes-partially-replacing-van-nuys-bike-lanes\">earlier Terra Bella Street coverage<\/a>.<\/p>\n<p class=\"wp-block-paragraph\">Find previous annual bikeway mileage posts from <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2025\/11\/18\/l-a-city-fiscal-year-24-25-bikeway-mileage-buoyed-by-completed-paths\">2025<\/a>, <a href=\"https:\/\/la.streetsblog.org\/2024\/10\/02\/l-a-city-new-bikeway-mileage-fell-to-five-year-low-in-fiscal-year-23-24\" target=\"_blank\" rel=\"noopener nofollow\">2024<\/a>, <a href=\"https:\/\/la.streetsblog.org\/2023\/10\/17\/too-many-disappointments-in-l-a-city-bikeway-mileage-during-fiscal-year-2022-23\" target=\"_blank\" rel=\"noopener nofollow\">2023<\/a>, <a href=\"https:\/\/la.streetsblog.org\/2022\/08\/23\/l-a-city-bikeway-implementation-decreased-in-fiscal-year-2021-22\" target=\"_blank\" rel=\"noopener nofollow\">2022<\/a>, <a href=\"https:\/\/la.streetsblog.org\/2021\/08\/19\/ladot-annual-bikeway-mileage-installation-up-in-fy20-21-buoyed-by-resurfacing\" target=\"_blank\" rel=\"noopener nofollow\">2021<\/a>, <a href=\"https:\/\/la.streetsblog.org\/2020\/09\/02\/l-a-city-bikeway-mileage-increased-in-fiscal-year-2019-20-but-network-still-lacking\" target=\"_blank\" rel=\"noopener nofollow\">2020<\/a> and <a href=\"https:\/\/la.streetsblog.org\/2019\/07\/09\/annual-ladot-bikeway-implementation-continues-dismal-trend\" target=\"_blank\" rel=\"noopener nofollow\">2019<\/a>.<\/p>\n<p>          <script async src=\"\/\/www.instagram.com\/embed.js\"><\/script><\/p>\n","protected":false},"excerpt":{"rendered":"This is Streetsblog L.A.\u2019s annual review of the past year of L.A. City bikeway implementation \u2013 the good,&hellip;\n","protected":false},"author":2,"featured_media":464922,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27],"tags":[48,52,51,47,50,49,109921],"class_list":["post-464921","post","type-post","status-publish","format-standard","has-post-thumbnail","category-los-angeles","tag-la","tag-la-headlines","tag-la-news","tag-los-angeles","tag-los-angeles-headlines","tag-los-angeles-news","tag-promoted"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/464921","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=464921"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/464921\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/464922"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=464921"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=464921"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=464921"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}