{"id":498615,"date":"2026-10-16T23:46:08","date_gmt":"2026-10-16T23:46:08","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/498615\/"},"modified":"2026-10-16T23:46:08","modified_gmt":"2026-10-16T23:46:08","slug":"long-beach-set-to-begin-dredging-project-next-week-hopes-to-stabilize-shoreline-on-peninsula-press-telegram","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/498615\/","title":{"rendered":"Long Beach set to begin dredging project next week, hopes to stabilize shoreline on Peninsula \u2013 Press Telegram"},"content":{"rendered":"<p>The Long Beach coastline has endured three major storms in the span of six weeks, which have damaged city infrastructure and several homes along the city\u2019s Peninsula.<\/p>\n<p>While the city is providing support and resources to residents who have lost their homes, officials are also continuing repair and restoration projects in the storm-impacted area. These include starting on a dredging project next week, on Tuesday, Oct. 20, to stabilize the Peninsula\u2019s shoreline ahead of future El Ni\u00f1o-related weather events.<\/p>\n<p>City crews and emergency personnel have been working to respond to immediate hazards and reduce risk wherever possible, city officials said during a Friday, Oct. 16, press conference at the 72nd Place parking lot on the Peninsula. Officials provided updates on what the city is doing to address impacts, and outlined the next steps to protect residents and the coastline.<\/p>\n<p>\u201cI want to start by acknowledging the incredible spirit that we\u2019ve seen here in our Peninsula community and here in the city of Long Beach, as we acknowledge the hardships the storm has brought to many members of our community, especially the displaced residents of the Peninsula,\u201d Mayor Rex Richardson said. \u201cWe\u2019ve all been navigating the last several days and weeks of this challenge under extremely difficult circumstances.\u201d<\/p>\n<p>The impacts of Tropical Storm Rachel on the Peninsula began on Oct. 8, with heavy wave activity, high tides and powerful surf that caused significant damage to the historic boardwalk and bulkhead. Seawater flooded the streets and got into homes, threatening the safety of residents, Richardson said.<\/p>\n<p>Prior to that, the Peninsula community took damage during Hurricane Marie over Labor Day weekend. That storm brought up many concerns from residents about what the city did to prepare for Hurricane Marie and what comes next for the beachfront community.<\/p>\n<p>City officials shared their preparations and future plans during a community meeting on Sept. 28, and have since declared a local emergency to help the city expand preparedness measures. The declaration will also allow the city to exercise emergency powers to respond to severe El Ni\u00f1o weather conditions during the winter season.<\/p>\n<p>The city mobilized crews to make emergency repairs during Tropical Storm Rachel and reinforced vulnerable sections of the bulkhead with sandbags, Richardson said. City crews also worked to pump water from flooded streets, clear storm drains, and assess damage to homes and coastal infrastructure.<\/p>\n<p>As risks increased, the city issued a mandatory evacuation order for homes along Seaside Walk from 64th to 66th places, while issuing additional evacuation warnings to other nearby homes.<\/p>\n<p>\u201cThroughout this response, protecting lives has been our number one priority,\u201d Richardson said. \u201cThanks to the efforts of our city teams and our first responders, no injuries (were) reported during this storm.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" alt=\"Councilmember Kristina Duggan speaks during a press conference updating the...\" class=\"lazyload size-article_inline\" data- src=\"https:\/\/www.presstelegram.com\/wp-content\/uploads\/2026\/10\/LPT-L-PENINSULA-UPDATE-1017-DK-06.jpg?w=620\"  bad-src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\"\/><\/p>\n<p>Councilmember Kristina Duggan speaks during a press conference updating the community on response efforts for post-tropical storm Rachel, which brought significant impacts to the Peninsula in Long Beach on Friday, October 16, 2026. (Photo by Drew A. Kelley, Press-Telegram\/SCNG)\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" alt=\"LBPW Senior Civil Engineer Stephen Figueira speaks during a press...\" class=\"lazyload size-article_inline\" data- src=\"https:\/\/www.presstelegram.com\/wp-content\/uploads\/2026\/10\/LPT-L-PENINSULA-UPDATE-1017-DK-04.jpg?w=620\"  bad-src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\"\/><\/p>\n<p>LBPW Senior Civil Engineer Stephen Figueira speaks during a press conference updating the community on response efforts for post-tropical storm Rachel, which brought significant impacts to the Peninsula in Long Beach on Friday, October 16, 2026. (Photo by Drew A. Kelley, Press-Tele\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" alt=\"City leaders update the community on preparedness, mitigation and response...\" class=\"lazyload size-article_inline\" data- src=\"https:\/\/www.presstelegram.com\/wp-content\/uploads\/2026\/10\/LPT-L-PENINSULA-UPDATE-1017-DK-05.jpg?w=620\"  bad-src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\"\/><\/p>\n<p>City leaders update the community on preparedness, mitigation and response efforts for post-tropical storm Rachel, which brought significant impacts to the Peninsula in Long Beach on Friday, October 16, 2026. (Photo by Drew A. Kelley, Press-Telegram\/SCNG)\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" alt=\"Councilmember Kristina Duggan speaks during a press conference updating the...\" class=\"lazyload size-article_inline\" data- src=\"https:\/\/www.presstelegram.com\/wp-content\/uploads\/2026\/10\/LPT-L-PENINSULA-UPDATE-1017-DK-03.jpg?w=620\"  bad-src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\"\/><\/p>\n<p>Councilmember Kristina Duggan speaks during a press conference updating the community on response efforts for post-tropical storm Rachel, which brought significant impacts to the Peninsula in Long Beach on Friday, October 16, 2026. (Photo by Drew A. Kelley, Press-Telegram\/SCNG)\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" alt=\"Mayor Rex Richardson provides an update on preparedness, mitigation and...\" class=\"lazyload size-article_inline\" data- src=\"https:\/\/www.presstelegram.com\/wp-content\/uploads\/2026\/10\/LPT-L-PENINSULA-UPDATE-1017-DK-01.jpg?w=620\"  bad-src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\"\/><\/p>\n<p>Mayor Rex Richardson provides an update on preparedness, mitigation and response efforts for post-tropical storm Rachel, which brought significant impacts to the Peninsula in Long Beach on Friday, October 16, 2026. (Photo by Drew A. Kelley, Press-Telegram\/SCNG)\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" alt=\"Community Development Department Director Christopher Koontz speaks during a press...\" class=\"lazyload size-article_inline\" data- src=\"https:\/\/www.presstelegram.com\/wp-content\/uploads\/2026\/10\/LPT-L-PENINSULA-UPDATE-1017-DK-02.jpg?w=620\"  bad-src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\"\/><\/p>\n<p>Community Development Department Director Christopher Koontz speaks during a press conference updating the community on response efforts for post-tropical storm Rachel, which brought significant impacts to the Peninsula in Long Beach on Friday, October 16, 2026. (Photo by Drew A. Kelley, Press-Telegram\/SCNG)\n<\/p>\n<p>Show Caption<\/p>\n<p>1 of 6<\/p>\n<p>Councilmember Kristina Duggan speaks during a press conference updating the community on response efforts for post-tropical storm Rachel, which brought significant impacts to the Peninsula in Long Beach on Friday, October 16, 2026. (Photo by Drew A. Kelley, Press-Telegram\/SCNG)\n<\/p>\n<p><a href=\"#\" class=\"icon-enlarge mng-gallery-fullscreen-expand\" aria-label=\"Expand fullscreen slideshow\">Expand<\/a><\/p>\n<p>Now, Long Beach begins its work for recovery, the mayor said. While Tropical Storm Rachel has passed, the city knows the impacts on its coastline are far from over. The city\u2019s focus will be to address the damage and help the shoreline recover and prepare for future storms.<\/p>\n<p>The city is moving forward with a seven-point plan to strengthen protection of the Peninsula, addressing both immediate needs and longer-term coastal resiliency. The plan includes repairing what has been damaged, while creating additional layers of protection and pursuing longer-term solutions and funding.<\/p>\n<p>The plan also includes continuing sand back-passing \u2013 which Long Beach has done for decades \u2013 taking sand from the west toward the Peninsula on the east. This costs the city about $1 million to $1.5 million annually, officials said.<\/p>\n<p>City crews also began emergency repairs to the bulkhead and boardwalk this week. This work depends heavily on the tides and safe working conditions, said Stephen Figueira, senior civil engineer for the Public Works Department. Crews will work both days and nights as needed to optimize the low-tide windows. Repairs have started at 68th Place and crews will be working west in areas where there\u2019s enough sand to construct protective berms for workers.<\/p>\n<p>The cost of these repairs, Figueira said, is currently anticipated to be upward of $3.6 million.<\/p>\n<p>The highly anticipated Alamitos Bay Entrance Channel Dredging Project will also begin next week. The $11.4 million needed for the project has already been allocated by the City Council and is supported by Tidelands and Marina Capital Funds, according to City Manager Tom Modica.<\/p>\n<p>This project is meant to place 415,000 cubic yards of beach-ready sand on the Peninsula and is expected to extend the beachfront out about 200 feet. Due to erosion from the storms, the city plans to back-pass additional sand onto the Peninsula to help build out the beach and allow the larger dredging project to be as effective as possible. This approximately $230,000 project will be funded through the Tidelands Emergency Reserve, a restricted public trust fund used to account for operations, maintenance, development and capital projects along the city\u2019s coastal and waterfront areas.<\/p>\n<p>A significant level of this work is anticipated to be completed by the end of November, Figueira said. Overnight beach operations have also been authorized under the city\u2019s local emergency to help move the placed sand and distribute it as quickly and efficiently as possible.<\/p>\n<p>During the Friday press conference, Councilmembers Kristina Duggan and Cindy Allen thanked everyone who was on the front lines of Tropical Storm Rachel\u2019s response, including the Marine Bureau, Fire Department, lifeguards, the Long Beach Conservation Corps, Emergency Management, Public Works and Community Development, as well as the Peninsula community.<\/p>\n<p>\u201cWhat hit the Peninsula was an extraordinary combination of events,\u201d said Duggan, whose district includes the Peninsula. \u201cOver the past couple of weeks, I\u2019ve talked daily with families, homeowners, tenants, all who lost their homes, and they\u2019ve lost part of their community and their neighborhood. People are trying to process what happened, where they are going to live, what can be repaired, what insurance will cover, and what comes next.\u201d<\/p>\n<p>Long Beach is also preparing for what is ahead, Duggan said. This is, after all, only the beginning of the El Ni\u00f1o and winter storm season. The city\u2019s focus will be on repairing what was damaged, identifying the next vulnerabilities, staging resources in advance, and making sure residents have the information they need to prepare.<\/p>\n<p>The Building and Safety Bureau have been working to maintain safety throughout and after the storm, said Christopher Koontz, director of Community Development. For homes that weren\u2019t compromised, power has been restored and residents have been able to go back into their homes. But some buildings were substantially damaged.<\/p>\n<p>Seven structures remain red-tagged, which means they are unsafe for entry and cannot be occupied, Koontz said. Those structures consist of four single-family homes, two duplexes and one fourplex, which displaced 12 families. Two homes also remain yellow-tagged.<\/p>\n<p>\u201cWe should all keep that in our heart,\u201d Koontz said. \u201cThink about it seriously as we work through the logistics and the safety; those are real people whose real lives have been impacted.\u201d<\/p>\n<p>Many of the heavily damaged structures have to either be partially or fully demolished, Koontz said, the extent for each building is still being evaluated by the Building and Safety team. The Community Development team is working with residents and contractors to expedite and provide instant permits where needed.<\/p>\n<p>Because there is a continued threat from some of the structures and a threat of collapse, the city will put up fencing to keep non-residents away from impacted areas, Koontz said. The city has also contracted private security to ensure safety in impacted areas as crews begin overnight construction to stabilize structures, as well as the boardwalk and bulkhead repairs, and the Alamitos Bay Dredging Project.<\/p>\n<p>\u201cTo our Peninsula residents, especially those who\u2019ve been displaced, whose homes are no longer habitable, or their homes have been damaged, we know this has been an incredible, difficult experience for you,\u201d Richardson said. \u201cWe see you, we hear you and we stand with you. We hear your concerns.<\/p>\n<p>\u201cBut Long Beach is a resilient city, and we remain committed to working with you through all of those questions that you might have on what next steps look like, how do you get back to your property, how you get to restore your home, and so there\u2019s still work ahead,\u201d the mayor added, \u201cand we\u2019ve shown time and time again that when we get to work together, there\u2019s nothing we can\u2019t accomplish and overcome, and we\u2019re committed to continue sharing updates as this work moves forward.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"The Long Beach coastline has endured three major storms in the span of six weeks, which have damaged&hellip;\n","protected":false},"author":2,"featured_media":498616,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[33],"tags":[7,179,10648,23,131,133,132,137],"class_list":["post-498615","post","type-post","status-publish","format-standard","has-post-thumbnail","category-long-beach","tag-california","tag-community","tag-el-nino","tag-local-news","tag-long-beach","tag-long-beach-headlines","tag-long-beach-news","tag-los-angeles-county"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/498615","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=498615"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/498615\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/498616"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=498615"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=498615"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=498615"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}