{"id":505947,"date":"2026-10-24T00:36:46","date_gmt":"2026-10-24T00:36:46","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/505947\/"},"modified":"2026-10-24T00:36:46","modified_gmt":"2026-10-24T00:36:46","slug":"long-beach-public-schools-advance-87-7-million-capital-improvement-plan-herald-community-newspapers","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/505947\/","title":{"rendered":"Long Beach Public Schools advance $87.7 million capital improvement plan | Herald Community Newspapers"},"content":{"rendered":"<p>When students in Long Beach returned to district buildings for the 2026-27 school year, they may have noticed some capital improvements taxpayers, in part, voted to approve in past years.<\/p>\n<p>At a board of trustees meeting on Oct. 13, Michael DeVito, the district\u2019s assistant superintendent for finance and operations,\u202fpresented an update on its $87.7 million capital improvement plan. Funding came from bonds \u2014 namely the bond voted on October 2025 \u2014 capital reserve funds and the district\u2019s general fund, depending on the project.<\/p>\n<p>Over the summer, DeVito said, crews worked to renovate playgrounds at the East, Lido, Lindell and <a href=\"https:\/\/www.liherald.com\/stories\/west-elementary-school-long-beach-new-york-100-years-2026,223235\" rel=\"nofollow noopener\" target=\"_blank\">West elementary<\/a> schools with new equipment, turf and accessible play features. The project also involved resurfacing and drainage improvements.<\/p>\n<p>He said that the wood shavings and hardtop surfaces were replaced with grass turf and a foam-based shock pad underneath to improve student safety.<\/p>\n<p>Anne Conway, vice president of the board, said the change was a positive one. Conway said when she and fellow trustee <a href=\"https:\/\/www.liherald.com\/longbeach\/stories\/long-beach-firefighters-contract-july-2026,223845\" rel=\"nofollow noopener\" target=\"_blank\">Sam Pinto<\/a> visited East and West elementary schools, they experimented with the playground.<\/p>\n<p>\u201cThe surface itself is very bouncy,\u201d she said. \u201cWhen you slide down really quick and you fall down, you don\u2019t get hurt.\u201d<\/p>\n<p>At Lindell, DeVito said acoustical panels were added due to teachers and students\u2019 inability to hear announcements and bells over the loudspeaker.<\/p>\n<p>The middle school had its walkways repaved and electrical upgrades, and a wellness room was created. At the high school, a classroom was repurposed for the new barbering program \u2014 offered in collaboration with BOCES \u2014 and gymnasium seating was refurbished to reflect \u201cL.B.H.S\u201d prominently.<\/p>\n<p>Following the fall sports season, DeVito said, the district plans to reconstruct the high school\u2019s baseball and softball fields and replace the football field\u2019s turf. In the spring, reconstruction of the high school swimming pool, including a new liner, tilework, showers, lighting, skylight and acoustical ceiling panels will take place.<\/p>\n<p>Other projects set to be completed by spring 2027 include districtwide HVAC upgrades, replacing in-window units, and electrical and plumbing infrastructure improvements at the middle school.<\/p>\n<p><a href=\"https:\/\/www.liherald.com\/longbeach\/stories\/long-beach-school-library-budget-election-2026,222454\" rel=\"nofollow noopener\" target=\"_blank\">Nora Bellsey<\/a>, board president, applauded district crews for their work.<\/p>\n<p>\u201cIt\u2019s so interesting because we don\u2019t look at the infrastructure \u2014 the plumbing and electrical work \u2014 and say \u2018ooh, ah\u2019 but we have all the other stuff to go along with it and its just magnificent,\u201d Bellsey said. \u201cThe Playgrounds look wonderful; the room updates look great. I\u2019m just so thrilled with the direction that we\u2019ve been going.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"When students in Long Beach returned to district buildings for the 2026-27 school year, they may have noticed&hellip;\n","protected":false},"author":2,"featured_media":505948,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[33],"tags":[195579,195581,131,133,67606,132,16735,195580],"class_list":["post-505947","post","type-post","status-publish","format-standard","has-post-thumbnail","category-long-beach","tag-87-7-million-capital-plan","tag-east-lido-lindell-west-elementary-schools","tag-long-beach","tag-long-beach-headlines","tag-long-beach-high-school","tag-long-beach-news","tag-long-beach-school-district","tag-long-beach-school-renovations"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/505947","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=505947"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/505947\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/505948"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=505947"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=505947"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=505947"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}