{"id":96146,"date":"2025-12-16T02:49:06","date_gmt":"2025-12-16T02:49:06","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/96146\/"},"modified":"2025-12-16T02:49:06","modified_gmt":"2025-12-16T02:49:06","slug":"construction-begins-on-roosevelt-high-schools-new-auxiliary-gym","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/96146\/","title":{"rendered":"Construction begins on Roosevelt High School&#8217;s new auxiliary gym"},"content":{"rendered":"<p class=\"EkqkG IGXmU nlgHS yuUao MvWXB TjIXL aGjvy ebVHC \">FRESNO, Calif. (KFSN) &#8212; The space between the pool and the theater at Roosevelt High will soon be under construction.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">Principal Michael Allen says an additional gym is being added to support physical education and athletics for the more than 2,000 students on campus.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">&#8220;So if it&#8217;s extremely hot or if it&#8217;s raining, then we need our students to be able to have access to indoor spaces. This will provide an additional space for that,&#8221; Allen said.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">The more than 13,000-square-foot space will make it easier for sports teams to practice simultaneously.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">Architect Jonathan McMurtry says the building will primarily have the gym, but also several added features.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">&#8220;It will have a big lobby and snack bar that serves the outside. In addition to that, it will have offices, two classrooms that serve as team rooms on weekends and miscellaneous site improvements,&#8221; McMurtry said.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">The gym&#8217;s design won&#8217;t replicate the school&#8217;s current look, but McMurtry says it will have specific features that help tie it into the campus.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">&#8220;Here&#8217;s the references to the more historical elements of the campus &#8212; the tripartite with the base, the middle and the top,&#8221; McMurtry explained.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">Principal Allen says he&#8217;s looking forward to having more space for students on campus.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">&#8220;It&#8217;s just extremely exciting because we utilize every inch of our campus, and so having a new gym in this space is going to open up many opportunities for students,&#8221; Allen said.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">Construction started during Thanksgiving break.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">The gym is expected to be completed by the Spring of 2027.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC eTIW sUzSN \">For news updates, follow Jessica Harrington on <a class=\"zZygg UbGlr iFzkS qdXbA WCDhQ DbOXS tqUtK GpWVU iJYzE \" data-testid=\"prism-linkbase\" href=\"https:\/\/www.facebook.com\/JessicaABC30\/\" rel=\"nofollow noopener\" target=\"_blank\">Facebook<\/a>, <a class=\"zZygg UbGlr iFzkS qdXbA WCDhQ DbOXS tqUtK GpWVU iJYzE \" data-testid=\"prism-linkbase\" href=\"https:\/\/twitter.com\/JessicaABC30\/\" rel=\"nofollow noopener\" target=\"_blank\">X<\/a> and <a class=\"zZygg UbGlr iFzkS qdXbA WCDhQ DbOXS tqUtK GpWVU iJYzE \" data-testid=\"prism-linkbase\" href=\"https:\/\/www.instagram.com\/jessicaharringtontv\/?hl=en\" rel=\"nofollow noopener\" target=\"_blank\">Instagram<\/a>.<\/p>\n<p>Copyright \u00a9 2025 KFSN-TV. All Rights Reserved.<\/p>\n<p><script async src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><script async src=\"\/\/www.instagram.com\/embed.js\"><\/script><\/p>\n","protected":false},"excerpt":{"rendered":"FRESNO, Calif. (KFSN) &#8212; The space between the pool and the theater at Roosevelt High will soon be&hellip;\n","protected":false},"author":2,"featured_media":96147,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31],"tags":[52781,52780,3319,112,114,113,18353,294],"class_list":["post-96146","post","type-post","status-publish","format-standard","has-post-thumbnail","category-fresno","tag-52781","tag-auxiliary-gym","tag-construction-project","tag-fresno","tag-fresno-headlines","tag-fresno-news","tag-roosevelt-high-school","tag-timely"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/96146","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=96146"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/96146\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/96147"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=96146"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=96146"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=96146"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}