The George Bush Boulevard drawbridge in Delray Beach closed at 7 a.m. for a rehabilitation project, detouring car and pedestrian access to Federal Highway, Atlantic Avenue, and Ocean Boulevard. Boats on the Intracoastal Waterway will not be affected. The bridge will remain closed 24/7 during repairs, which are expected to last until July 20. Your neighborhood: Local coverage from WPBF 25 NewsIn Fort Pierce, the city has broken ground on what it calls a “significant infrastructure investment” to resurface Avenue D from 29th Street to U.S. 1. The project will include upgraded road signs, better crosswalks, ramps, and sidewalks. Get the latest news updates with the WPBF 25 News app. You can download it here.The work is funded through a $1.5 million state grant and contributions from local agencies. Fort Pierce officials said the improvements will enhance safety and connectivity along Avenue D.

The George Bush Boulevard drawbridge in Delray Beach closed at 7 a.m. for a rehabilitation project, detouring car and pedestrian access to Federal Highway, Atlantic Avenue, and Ocean Boulevard.

Boats on the Intracoastal Waterway will not be affected. The bridge will remain closed 24/7 during repairs, which are expected to last until July 20.

Your neighborhood: Local coverage from WPBF 25 News

In Fort Pierce, the city has broken ground on what it calls a “significant infrastructure investment” to resurface Avenue D from 29th Street to U.S. 1. The project will include upgraded road signs, better crosswalks, ramps, and sidewalks.

Get the latest news updates with the WPBF 25 News app. You can download it here.

The work is funded through a $1.5 million state grant and contributions from local agencies. Fort Pierce officials said the improvements will enhance safety and connectivity along Avenue D.