TALLAHASSEE, Fla. (WCTV) – The Capital Region Transportation Planning Agency (CRTPA) is holding public meetings in two weeks to discuss a multi-use trail connecting Chattahoochee and Quincy.
The planning agency began a feasibility study on the proposed trail in July of last year and now wants public input. The US 90 multi-use 22-mile paved trail is expected to begin at the Jackson County line in Chattahoochee to State Road 12 at the Quincy Bypass/Julia Monroe Woodward Highway.
The trail is planned to be 10-12 feet wide and used for both recreation and transportation purposes, including cycling, running and walking, according to CRTPA. The agency says there aren’t any environmental concerns with constructing the trail, but elevation changes and steep grades may lead to mobility challenges.
The feasibility study also notes that this trail could help lower tension between traffic and travelers. A CRTPA existing conditions analysis conducted in Dec. 2025 reports that from 2020 to 2024, the US 90 and Julia Munroe Woodward Highway corridor saw more than 900 crashes resulting in 12 fatalities.
“Frequent and severe crashes create an environment of fear and uncertainty for those who walk, bike, or drive along the corridor, discouraging active transportation and limiting community mobility,” CRTPA said.
With more reliable transportation, CRTPA’s feasibility study says the trail could support small businesses, schools, parks and public facilities in Chattahoochee and Quincy.
More news out of the Big Bend:
The trail could also be instrumental in creating a link between CRTPA’s regional trail system and the Florida Department of Transportation’s (FDOT) Sun Trail network. This could lead to a broader connectivity of Florida’s trail networks as a whole.
Cyclists on the proposed US 90 West multi-use trail could also connect to Tallahassee’s trail network and other coastal destinations, according to CRTPA.
The US 90 West Multi-Use Trail Feasibility Study is funded by Florida’s Shared-Use Non-Motorized (SUN) Trail program, per CRTPA.
CRTPA is holding a public meeting in Chattahoochee City Hall on June 17 at 5 p.m. and at the Gadsden County Board of Commissioners building in Quincy on June 18 at 5 p.m.
According to the feasibility study’s timeline, the final feasibility report will follow the public meetings in July 2026.
To keep up with the latest news as it develops, follow WCTV on Facebook, Instagram, YouTube, Nextdoor and X (Twitter).
Have a news tip or see an error? Write to us here. Please include the article’s headline in your message.
Be the first to see all the biggest headlines by downloading the WCTV News app. Click here to get started.
Copyright 2026 WCTV. All rights reserved.