{"id":225537,"date":"2026-04-09T23:08:08","date_gmt":"2026-04-09T23:08:08","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-fl\/225537\/"},"modified":"2026-04-09T23:08:08","modified_gmt":"2026-04-09T23:08:08","slug":"usf-students-autograph-piece-of-on-campus-stadium-extremely-excited","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-fl\/225537\/","title":{"rendered":"USF students autograph piece of on-campus stadium: \u2018Extremely excited\u2019"},"content":{"rendered":"<p>\u00a0<\/p>\n<p><a href=\"https:\/\/www.usforacle.com\/wp-content\/uploads\/sites\/2\/2026\/04\/IMG_1040-scaled.jpg\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-94606 size-large\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/04\/IMG_1040-1024x683.jpg\" alt=\"\" width=\"1024\" height=\"683\"  \/><\/a>Students gathered outside the Marshall Student Center to sign a beam that will be used to build USF\u2019s on-campus stadium, which is set to open by fall 2027. ORACLE PHOTO \/ VIOLET VASQUEZ PIMENTEL<\/p>\n<p>\u00a0Students shuffled in line behind the north entrance of the Marshall Student Center on Tuesday, braving the unseasonably chilly April temperatures and sporadic rainfall.\u00a0<\/p>\n<p>But it wasn\u2019t free food or a celebrity appearance they were waiting for. It was the chance to <a href=\"https:\/\/x.com\/USouthFlorida\/status\/2041594699299868716\" rel=\"nofollow\">sign a 10,000-pound steel beam<\/a> that will be used to construct USF\u2019s on-campus stadium.\u00a0<\/p>\n<p><a href=\"https:\/\/www.usforacle.com\/2024\/11\/08\/usf-stadium-football-on-campus\/\" rel=\"nofollow noopener\" target=\"_blank\">USF\u2019s on-campus stadium<\/a>, which is being constructed on the former Sycamore Fields, is slated to open by fall 2027. It will be home to the football and women\u2019s lacrosse teams.\u00a0<\/p>\n<p>The $348.5-million stadium will have a capacity of around 35,000 and will feature an open-air concourse, an east-west design to maximize shade and a designated tailgating space.\u00a0<\/p>\n<p>The stadium construction may be conducted behind chain-link fences and security checkpoints for now. But during this year\u2019s <a href=\"https:\/\/www.usforacle.com\/2026\/04\/05\/event-lineup-dream-bullstock-performers-usf-week-edition-2026\/\" rel=\"nofollow noopener\" target=\"_blank\">USF Week<\/a>, students gained an opportunity to leave their mark on one of the most anticipated developments in university history.\u00a0<\/p>\n<p>The 43-foot beam will be placed within the student section, an 8,000-seat wing sloping above the stadium\u2019s west endzone.\u00a0<\/p>\n<p>USF staff handed out green and gold Sharpies as students scribbled their names and graduation years on the beam.\u00a0<\/p>\n<p>Aiden Poff, a senior mass communications major, signed the beam on Tuesday and said he\u2019s looking forward to the opening of the new stadium.\u00a0<\/p>\n<p>\u201cI\u2019m extremely excited,\u201d Poff said. \u201cThe only thing that strikes my mind is parking, but I\u2019m sure they will handle that.\u201d<\/p>\n<p>USF has not outlined any additional parking with the construction of the new stadium. Event day operations are currently in the \u201cplanning stages,\u201d according to <a href=\"https:\/\/www.usf.edu\/stadium\/about\/\" rel=\"nofollow noopener\" target=\"_blank\">USF\u2019s website.<\/a>\u00a0\u00a0<\/p>\n<p><a href=\"https:\/\/www.usforacle.com\/wp-content\/uploads\/sites\/2\/2026\/04\/IMG_1063-scaled.jpg\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-94607 size-large\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/04\/IMG_1063-1024x683.jpg\" alt=\"\" width=\"1024\" height=\"683\"  \/><\/a>Students signed a 43-foot, 10,000-pound steel beam that will be placed in the on-campus stadium\u2019s student section. ORACLE PHOTO \/ VIOLET VASQUEZ PIMENTEL<\/p>\n<p>Poff, who grew up around Tampa, grew up attending USF football games at Raymond James Stadium. He said he\u2019s excited about the possibility of bringing his family to the campus stadium for years to come.\u00a0<\/p>\n<p>\u201cI think it\u2019s just cool we\u2019re getting a new football stadium,\u201d Poff said, \u201cI\u2019ll be able to say down the line, \u2018I was here, look, there\u2019s my name\u2019.\u201d\u00a0<\/p>\n<p>Related: <a href=\"https:\/\/www.usforacle.com\/2025\/04\/29\/usf-stadium\/\" rel=\"nofollow noopener\" target=\"_blank\">USF approves $407 million price tag for stadium, related infrastructure<\/a><\/p>\n<p>The beam signing was slated to begin at 6 p.m. Monday, but was delayed until the following morning due to heavy rain and lightning.\u00a0<\/p>\n<p>Still, hundreds of students gathered at the MSC Atrium to kick off the beam signing.\u00a0<\/p>\n<p>USF President Moez Limayem, head football coach Brian Hartline, Athletics CEO Rob Higgins and Student Body President Sumit Jadhav commenced the event.\u00a0<\/p>\n<p>Limayem said students were \u201cmaking history\u201d by autographing a beam that will be permanently installed in the student section.\u00a0<\/p>\n<p>\u201cYou\u2019re gonna see that beautiful stadium, then come back with your kids and family and tell everybody, \u2018You know what, my signature is right there,\u2019\u201d Limayem said.\u00a0<\/p>\n<p>Higgins, who graduated from USF in 2001, was a student when the football team was in its fledgling years in the late 1990s. He said he never imagined USF football would play on its home campus.\u00a0<\/p>\n<p>\u201cTo now have our 50,000 students attend a home of their own when it comes to the USF football program, it\u2019s truly incredible and something that\u2019s been building for several years,\u201d Higgins said.\u00a0<\/p>\n<p>Related: <a href=\"https:\/\/www.usforacle.com\/2024\/11\/08\/usf-stadium-football-on-campus\/\" rel=\"nofollow noopener\" target=\"_blank\">USF breaks ground on campus stadium: \u2018Championships will be won here\u2019<\/a><\/p>\n<p>USF football has played all but one of its seasons at Raymond James Stadium since it opened in 1998. But the on-campus stadium is a project a decade in the making.\u00a0<\/p>\n<p>Former USF President Judy Genshaft first tapped The Beck Group, a Dallas-based construction company, to <a href=\"https:\/\/www.usforacle.com\/2023\/09\/13\/take-a-look-back-at-the-years-long-evolution-of-the-on-campus-stadium-plans-so-far\/\" rel=\"nofollow noopener\" target=\"_blank\">draw a concept plan<\/a> for a stadium in 2016.\u00a0<\/p>\n<p>In 2021, USF Board of Trustees Chairman Will Weatherford <a href=\"https:\/\/gousfbulls.com\/news\/2021\/9\/8\/football-i-m-here-to-tell-you-we-are-going-to-do-it-weatherford-says-of-on-campus-stadium.aspx\" rel=\"nofollow noopener\" target=\"_blank\">publicly promised<\/a> the development of an on-campus stadium.\u00a0<\/p>\n<p>The Florida Board of Governors approved the university taking on <a href=\"https:\/\/www.usforacle.com\/2023\/09\/08\/bog-approves-200-million-debt-issuance-for-on-campus-stadium\/\" rel=\"nofollow noopener\" target=\"_blank\">$200 million in<\/a> debt to finance development in September 2023.\u00a0<\/p>\n<p>Seven months later, USF selected Manhattan Construction Company, H.J. Russell &amp; Company and DuCon, LLC as the stadium\u2019s <a href=\"https:\/\/www.usforacle.com\/2024\/04\/09\/usf-selects-construction-firm-for-stadium-project\/\" rel=\"nofollow noopener\" target=\"_blank\">construction firms.\u00a0<\/a><\/p>\n<p>Despite a brief hurricane delay, USF <a href=\"https:\/\/www.usforacle.com\/2024\/11\/08\/usf-stadium-football-on-campus\/\" rel=\"nofollow noopener\" target=\"_blank\">broke ground<\/a> on the stadium during a ceremony in November 2024.\u00a0<\/p>\n<p>Fans and alumni who have not yet signed the beam <a href=\"https:\/\/x.com\/USFAthletics\/status\/2042293301638815980\" rel=\"nofollow\">will have the chance<\/a> to do so during football\u2019s spring game, which will be held at 3:30 p.m. on April 19 at Corbett Stadium.<\/p>\n<p>Higgins said he was impressed by the student body\u2019s turnout on Monday and how invested they are in the future of USF\u2019s football program.<\/p>\n<p>\u201cThat\u2019s being a part of the history of our program and our school,\u201d he said. \u201cI think it speaks volumes right now just when it comes to the student body and athletics.\u201d <\/p>\n","protected":false},"excerpt":{"rendered":"\u00a0 Students gathered outside the Marshall Student Center to sign a beam that will be used to build&hellip;\n","protected":false},"author":2,"featured_media":225538,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[135,137,136],"class_list":["post-225537","post","type-post","status-publish","format-standard","has-post-thumbnail","category-tampa","tag-tampa","tag-tampa-headlines","tag-tampa-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/225537","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/comments?post=225537"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/225537\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media\/225538"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media?parent=225537"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/categories?post=225537"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/tags?post=225537"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}