{"id":297558,"date":"2026-06-05T19:14:10","date_gmt":"2026-06-05T19:14:10","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-fl\/297558\/"},"modified":"2026-06-05T19:14:10","modified_gmt":"2026-06-05T19:14:10","slug":"1-6-billion-one-water-project-moves-forward-in-south-hillsborough","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-fl\/297558\/","title":{"rendered":"$1.6 Billion One Water Project Moves Forward In South Hillsborough"},"content":{"rendered":"<p>            <a href=\"https:\/\/i0.wp.com\/www.ospreyobserver.com\/wp-content\/uploads\/2026\/06\/One_Water_Map_ymgq3m-1.jpg?fit=744%2C821&amp;ssl=1\" data-caption=\"\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"696\" height=\"768\" class=\"entry-thumb td-modal-image\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/06\/One_Water_Map_ymgq3m-1.jpg\"   alt=\"\" title=\"One_Water_Map_ymgq3m (1)\"\/><\/a><\/p>\n<p>Hillsborough County officials officially broke ground on the One Water South Wastewater Conveyance and Treatment Project on April 24, marking a major milestone in the county\u2019s $1.6 billion One Water infrastructure initiative. <\/p>\n<p>The project centers on construction of a 200-acre Advanced Wastewater Treatment Plant near the Southeast County Landfill in Lithia. County officials said the facility is designed to support South Hillsborough\u2019s long-term wastewater and reclaimed water needs through at least 2050. <\/p>\n<p>The One Water Program serves the county\u2019s rapidly growing south-central service area, including Apollo Beach, Brandon, Gibsonton, Riverview, Ruskin, Sun City Center, Valrico and Wimauma. <\/p>\n<p>County leaders described the One Water Program as a long-range strategy focused on resiliency, sustainability and future growth. The \u2018One Water\u2019 concept treats drinking water, wastewater, reclaimed water and stormwater as one interconnected system designed to protect resources while supporting regional development. <\/p>\n<p>The wastewater conveyance and treatment project itself is estimated at approximately $1.2 billion. The project includes the advanced treatment facility, the Balm Road Super Pump Station and more than 20 miles of wastewater and reclaimed water pipelines. The broader $1.6 billion capital program also includes additional long-term drinking water and reclaimed water improvements throughout South Hillsborough County. <\/p>\n<p><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" data-attachment-id=\"101534\" data-permalink=\"https:\/\/www.ospreyobserver.com\/2026\/06\/1-6-billion-one-water-project-moves-forward-in-south-hillsborough\/onewater-6-1_900xx1942-1097-31-24-1\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.ospreyobserver.com\/wp-content\/uploads\/2026\/06\/onewater-6-1_900xx1942-1097-31-24-1.jpg?fit=900%2C508&amp;ssl=1\" data-orig-size=\"900,508\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;,&quot;alt&quot;:&quot;&quot;}\" data-image-title=\"onewater-6-1_900xx1942-1097-31-24 (1)\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/www.ospreyobserver.com\/wp-content\/uploads\/2026\/06\/onewater-6-1_900xx1942-1097-31-24-1.jpg?fit=696%2C393&amp;ssl=1\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/06\/onewater-6-1_900xx1942-1097-31-24-1.jpg\" alt=\"\" width=\"696\" height=\"393\" class=\"alignnone size-full wp-image-101534\"  \/><\/p>\n<p>By 2030, the Lithia facility is expected to process 24 million gallons of wastewater per day, with designs already in place to eventually expand capacity to 30 million gallons per day. <\/p>\n<p>\u201cWhat\u2019s going to be built is a 30 million gallon per day advanced wastewater treatment plant, some of the most advanced technology that\u2019s out there, for purposes of providing adequate treatment capacity for our growing community,\u201d said George Cassady, assistant county administrator for public utilities. <\/p>\n<p>The project also includes the Balm Road Super Pump Station, which can move up to 56 million gallons of wastewater per day to the new facility. The station features a 5-million-gallon emergency storage tank designed to improve long-term system resiliency. <\/p>\n<p>Pipeline construction is another major component of the project, including 10 miles of wastewater pipeline and 13 miles of reclaimed water pipeline ranging from 42-48 inches in diameter. Officials said reclaimed water infrastructure is critical because it reduces dependence on drinking water supplies while improving environmental sustainability and future water reliability. <\/p>\n<p>Much of the large-scale utility construction residents are currently seeing throughout South Hillsborough, including pipeline staging, trenching operations and roadway utility work, is tied to multiple major infrastructure projects happening simultaneously across the region. <\/p>\n<p><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" data-attachment-id=\"101535\" data-permalink=\"https:\/\/www.ospreyobserver.com\/2026\/06\/1-6-billion-one-water-project-moves-forward-in-south-hillsborough\/tampa-bay-water-3\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.ospreyobserver.com\/wp-content\/uploads\/2026\/06\/tampa-bay-water.webp?fit=1024%2C1024&amp;ssl=1\" data-orig-size=\"1024,1024\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;,&quot;alt&quot;:&quot;&quot;}\" data-image-title=\"tampa-bay-water\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/www.ospreyobserver.com\/wp-content\/uploads\/2026\/06\/tampa-bay-water.webp?fit=450%2C450&amp;ssl=1\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/06\/tampa-bay-water.webp\" alt=\"\" width=\"696\" height=\"696\" class=\"alignnone size-full wp-image-101535\"  \/><\/p>\n<p>While Tampa Bay Water\u2019s 26-mile South Hillsborough Pipeline project and Hillsborough County\u2019s One Water Wastewater Program are separate initiatives, the two projects are closely connected and designed to work together to support continued growth across Riverview, Brandon, Ruskin, Valrico and surrounding communities. <\/p>\n<p>The project is being delivered through a progressive design-build partnership between Garney Construction and Hazen &amp; Sawyer, along with partners Ardurra, Stantec and Wade Trim. <\/p>\n<p>\u201cWhat makes this project stand out is that it goes beyond simply adding treatment capacity,\u201d said Eric Wagner, director of southeast plant operations at Garney. \u201cAt a time when growing communities are looking for more sustainable ways to plan ahead, Hillsborough County is setting a strong example through its long-term investment in infrastructure.\u201d <\/p>\n<p>County leaders said the investment is necessary as South Hillsborough continues experiencing rapid residential and commercial expansion. <\/p>\n<p>\u201cWe are developing homes here, but we didn\u2019t have the infrastructure before,\u201d said Hillsborough County Commissioner Christine Miller. \u201cAnd so, as the people continue to push outside of the city, we have to provide the resources for them.\u201d <\/p>\n<p><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" data-attachment-id=\"101533\" data-permalink=\"https:\/\/www.ospreyobserver.com\/2026\/06\/1-6-billion-one-water-project-moves-forward-in-south-hillsborough\/onewater-groundbreaking\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.ospreyobserver.com\/wp-content\/uploads\/2026\/06\/OneWater-Groundbreaking.jpg?fit=1024%2C768&amp;ssl=1\" data-orig-size=\"1024,768\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;,&quot;alt&quot;:&quot;&quot;}\" data-image-title=\"OneWater Groundbreaking\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/www.ospreyobserver.com\/wp-content\/uploads\/2026\/06\/OneWater-Groundbreaking.jpg?fit=600%2C450&amp;ssl=1\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/06\/OneWater-Groundbreaking.jpg\" alt=\"\" width=\"696\" height=\"522\" class=\"alignnone size-full wp-image-101533\"  \/><\/p>\n<p>While pipeline work began in fall 2025, the April 2026 groundbreaking launched vertical construction for the treatment facility and pump station. Phase one is expected to be completed in 2028, with full buildout anticipated by 2030. <\/p>\n<p>Officials said existing customers should not notice interruptions to daily water or wastewater service during construction. <\/p>\n<p>\u201cThe beauty of this program is that customers will not see a change in their service,\u201d Cassady said. \u201cThis will just provide additional resilient capacity for now and in the future.\u201d <\/p>\n<p>Drivers may notice construction activity near County Road 672 and east of U.S. 301, though county officials said efforts are being made to minimize traffic disruptions during construction. <\/p>\n<p>Once complete, the One Water Program is expected to become one of the most important infrastructure systems supporting long-term growth and resiliency throughout South Hillsborough County. <\/p>\n","protected":false},"excerpt":{"rendered":"Hillsborough County officials officially broke ground on the One Water South Wastewater Conveyance and Treatment Project on April&hellip;\n","protected":false},"author":2,"featured_media":297559,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[135,137,136],"class_list":["post-297558","post","type-post","status-publish","format-standard","has-post-thumbnail","category-tampa","tag-tampa","tag-tampa-headlines","tag-tampa-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/297558","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/comments?post=297558"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/297558\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media\/297559"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media?parent=297558"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/categories?post=297558"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/tags?post=297558"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}