{"id":331939,"date":"2026-07-07T15:48:07","date_gmt":"2026-07-07T15:48:07","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-fl\/331939\/"},"modified":"2026-07-07T15:48:07","modified_gmt":"2026-07-07T15:48:07","slug":"groups-challenge-department-of-energys-illegal-orlando-area-coal-plant-extension","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-fl\/331939\/","title":{"rendered":"Groups challenge Department of Energy\u2019s illegal Orlando area coal plant extension"},"content":{"rendered":"<p>The challenge: Environmental Defense Fund, Sierra Club and Earthjustice (on behalf of Florida Rising) are challenging the Department of Energy&#8217;s emergency order that blocked the planned retirement of Orlando&#8217;s 39-year-old Stanton coal plant, arguing the order is unlawful.Cost impacts: The costs of running the coal plant, over $6 million per month, will likely be passed onto Central Florida families and businesses, increasing monthly electricity bills.The extension is unnecessary: The Orlando Utilities Commission had already planned to replace Stanton Unit 1 with natural gas and solar.<\/p>\n<p>(Orlando, FL &#8212; July 7, 2026) Public interest organizations are challenging the Department of Energy\u2019s\u00a0<a href=\"https:\/\/www.energy.gov\/articles\/energy-secretary-keeps-coal-fired-power-generation-alive-florida\" rel=\"nofollow noopener\" target=\"_blank\">illegal emergency order<\/a> extending the life of the 39-year-old Stanton coal plant in Orlando. The groups include Environmental Defense Fund, Sierra Club and Earthjustice, representing Florida Rising.<\/p>\n<p>The\u00a0<a href=\"https:\/\/library.edf.org\/AssetLink\/w4404s1j7y5m27c1g7458tj7g16ooox5.pdf\" rel=\"nofollow noopener\" target=\"_blank\">request for rehearing<\/a>\u00a0was filed\u00a0in response to DOE\u2019s June 4 order, which prevented the planned retirement of Unit 1 at the end of May 2026. DOE\u2019s order forces the plant to remain available to operate for 90 days and may be renewed, as the administration has repeatedly done with five other unlawful coal plant orders.<\/p>\n<p>Orlando Utilities Commission\u2019s financial reports reveal that coal has been its\u00a0<a href=\"https:\/\/www.ouc.com\/wp-content\/uploads\/2026\/02\/2025-Financial-Statistical-Report.pdf\" rel=\"nofollow noopener\" target=\"_blank\">highest cost fuel per megawatt hour<\/a>\u00a0in recent years, costing more than natural gas and the cost of purchasing solar power. Stanton Unit 1 costs an\u00a0<a href=\"https:\/\/utilitytransitionhub.rmi.org\/economic-dispatch-daily-operations\/\" rel=\"nofollow noopener\" target=\"_blank\">estimated $6.2 million<\/a> each month to run. According to\u00a0<a href=\"https:\/\/library.edf.org\/AssetLink\/220wvckk2kl3x0828641e7g43ntc6221.pdf\" rel=\"nofollow noopener\" target=\"_blank\">EDF analysis<\/a>, propping up this coal plant could add over $20 to monthly electricity bills, if the costs of keeping the plant open are assigned solely to OUC customers. In addition to ratepayer impacts, the plant has heavy health impacts, causing an estimated\u00a0<a href=\"https:\/\/www.sierraclub.org\/press-releases\/2026\/06\/trump-forces-costly-coal-plant-run-past-retirement-raising-costs-everyday\" rel=\"nofollow noopener\" target=\"_blank\">45 premature deaths<\/a> annually from toxic air pollution.<\/p>\n<p>OUC planned to replace Stanton 1 with natural gas and solar resources. While the Department of Energy claims that keeping Stanton online is necessary for grid reliability, OUC&#8217;s own\u00a0<a href=\"https:\/\/www.floridapsc.com\/pscfiles\/website-files\/PDF\/Utilities\/Electricgas\/TenYearSitePlans\/2025\/Orlando%20Utilities%20Commission.pdf\" rel=\"nofollow noopener\" target=\"_blank\">planning documents from last year<\/a> conclude that the utility is projected to maintain adequate power capacity through at least 2034 (page 63). The North American Electric Reliability Corporation, an organization responsible for assessing grid reliability, also rates Florida&#8217;s electric system as having the highest reliability rating for both\u00a0<a href=\"https:\/\/www.nerc.com\/globalassets\/our-work\/assessments\/2026-summer-reliability-assessment-snapshot.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Summer 2026<\/a> and\u00a0<a href=\"https:\/\/www.rtoinsider.com\/124496-nerc-warns-worsening-resource-adequacy-2035\/\" rel=\"nofollow noopener\" target=\"_blank\">long-term resource adequacy<\/a>.<\/p>\n<p>\u201cForcing this coal plant to stay open delivers a rate hike to Central Florida families and businesses, right as they are already struggling with sky-high electricity bills,\u201d said\u00a0<a href=\"https:\/\/www.edf.org\/people\/adam-kurland\" rel=\"nofollow noopener\" target=\"_blank\">Adam Kurland<\/a>, Attorney for U.S. Clean Energy at Environmental Defense Fund. \u201cCheaper, cleaner and more reliable options had rendered this coal plant obsolete and on track for retirement.\u201d<\/p>\n<p>&#8220;There is no good reason to keep this aging coal plant in operation. OUC customers could be forced to pay higher monthly bills to burn one of the utility\u2019s most expensive fuels, despite the availability of cleaner, more affordable energy resources that can already meet our electricity needs. Our communities deserve utility decisions grounded in facts, not politics,\u201d said Brooke Alexander-Goss, Organizing Manager, Sierra Club Florida<\/p>\n<p>\u201cFlorida Rising has been pushing for energy justice throughout Florida by fighting against excessive utility profits and for a just transition that puts frontline communities at the center of energy policy. We already have some of the highest electric bills in the nation due to our excess electricity generation capacity, so ordering OUC to keep this uneconomic plant online will just push OUC bills higher at a time when people are already struggling to pay their bills,\u201d said Bradley Marshall, Senior Attorney at Earthjustice which is representing Florida Rising.\u00a0\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"The challenge: Environmental Defense Fund, Sierra Club and Earthjustice (on behalf of Florida Rising) are challenging the Department&hellip;\n","protected":false},"author":2,"featured_media":331940,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[139,141,140],"class_list":["post-331939","post","type-post","status-publish","format-standard","has-post-thumbnail","category-orlando","tag-orlando","tag-orlando-headlines","tag-orlando-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/331939","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/comments?post=331939"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/331939\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media\/331940"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media?parent=331939"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/categories?post=331939"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/tags?post=331939"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}