{"id":337302,"date":"2026-07-11T23:35:15","date_gmt":"2026-07-11T23:35:15","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-fl\/337302\/"},"modified":"2026-07-11T23:35:15","modified_gmt":"2026-07-11T23:35:15","slug":"updates-i-395-bridge-coconut-grove-playhouse-ludlam-trail","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-fl\/337302\/","title":{"rendered":"Updates: I-395 bridge, Coconut Grove Playhouse, Ludlam Trail"},"content":{"rendered":"<p>            <img loading=\"lazy\" decoding=\"async\" class=\"responsive-image\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/07\/MIA_303MIASignaBridge00NEWPPP.JPG\"   width=\"1200\" height=\"674\" title=\"The arches for the Interstate 395 \u201csignature bridge\u201d over Biscayne Boulevard rise between the Arsht Center, to the right, and the Frost Science Museum, bottom left.\" alt=\"View of the ongoing construction of the arches for the I-395 signature bridge as part of the I-395\/I-95 Design-Build Project, in front of the Adrienne Arsht Center, in downtown Miami, on Thursday, March 26, 2026.\"\/><\/p>\n<p>        The arches for the Interstate 395 \u201csignature bridge\u201d over Biscayne Boulevard rise between the Arsht Center, to the right, and the Frost Science Museum, bottom left.<\/p>\n<p>                Pedro Portal<\/p>\n<p>            pportal@miamiherald.com<\/p>\n<p>From a century-old City Hall closing for repairs to a downtown bridge project well behind schedule, several major South Florida development projects are hitting key milestones this year.<\/p>\n<p>Here\u2019s a rundown of recent Miami Herald stories tracking their progress and setbacks:<\/p>\n<p>Coral Gables City Hall restoration: After 98 years, the iconic 1928 building has been vacated for a comprehensive restoration expected to take up to three years and cost as much as $30 million, with plans to reverse decades of alterations and <a target=\"_blank\" rel=\"Follow nofollow noopener\" href=\"https:\/\/www.miamiherald.com\/news\/local\/community\/miami-dade\/coral-gables\/article314928941.html\">return the building to architect Phineas Paist\u2019s original design<\/a>.I-395 downtown bridge delays: The completion date for the Miami highway reconstruction has been pushed back to late 2029 \u2014 eight years behind schedule \u2014 with costs climbing from $802 million to $866 million. <a target=\"_blank\" rel=\"Follow nofollow noopener\" href=\"https:\/\/www.miamiherald.com\/news\/local\/community\/miami-dade\/article315181611.html\">Lawsuits alleging there were design errors in the signature bridge arches<\/a> caused 18 months of delay.Ludlam Trail stalled: Miami-Dade County has spent $42 million since approving the six-mile rail-to-trail conversion in 2015, but there is still no designer under contract and no construction underway, prompting advocates to demand answers about <a target=\"_blank\" rel=\"Follow nofollow noopener\" href=\"https:\/\/www.miamiherald.com\/news\/local\/community\/miami-dade\/west-miami-dade\/article316367235.html\">why the parks department has failed to move the project forward<\/a>.Arsht Center parking garage: Twenty years after opening without dedicated parking, the performing arts center has submitted plans for a $61 million, 750-space garage with two rehearsal studios on a county-owned lot, to be <a target=\"_blank\" rel=\"Follow nofollow noopener\" href=\"https:\/\/www.miamiherald.com\/news\/local\/community\/miami-dade\/downtown-miami\/article315626456.html\">financed with $16 million from the Arsht trust and private bonds<\/a> rather than direct public money.Coconut Grove Playhouse rebuild: Miami city commissioners recently voted 5-0 to approve a $40 million plan to rebuild the historic theater with a new 300-seat auditorium and restored 1927 Mediterranean front building, <a target=\"_blank\" rel=\"Follow nofollow noopener\" href=\"https:\/\/www.miamiherald.com\/news\/local\/community\/miami-dade\/article316448584.html\">ending 13 years of legal and political battles<\/a> \u2014 though opponents are considering another appeal.<\/p>\n<p>This report was produced with the assistance of a proprietary tool powered by artificial intelligence and using our own originally reported, written and published content. It was reviewed and edited by our journalists.<\/p>\n","protected":false},"excerpt":{"rendered":"The arches for the Interstate 395 \u201csignature bridge\u201d over Biscayne Boulevard rise between the Arsht Center, to the&hellip;\n","protected":false},"author":2,"featured_media":337303,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[225,227,226],"class_list":["post-337302","post","type-post","status-publish","format-standard","has-post-thumbnail","category-hialeah","tag-hialeah","tag-hialeah-headlines","tag-hialeah-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/337302","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/comments?post=337302"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/337302\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media\/337303"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media?parent=337302"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/categories?post=337302"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/tags?post=337302"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}