{"id":337801,"date":"2026-07-12T19:18:09","date_gmt":"2026-07-12T19:18:09","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-fl\/337801\/"},"modified":"2026-07-12T19:18:09","modified_gmt":"2026-07-12T19:18:09","slug":"construction-progresses-on-bus-lane-and-category-10-bar-at-universal-citywalk-orlando","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-fl\/337801\/","title":{"rendered":"Construction Progresses on Bus Lane and Category 10 Bar at Universal CityWalk Orlando"},"content":{"rendered":"<p>Two projects are rapidly reshaping separate areas of Universal CityWalk Orlando, with a new bar and restaurant on the horizon and faster bus access for resort guests.<\/p>\n<p>Luke Combs\u2019 Category 10 Construction<a data-fslightbox=\"1\" data-type=\"image\" aria-label=\"Open fullscreen lightbox with current image\" data-caption=\"@bioreconstruct\/x\" href=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/07\/UOR-Bioreconstruct-CityWalk-Bus-Depot-Luke-Combs-Category-10-Construction-July-2026-3-scaled.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1440\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/07\/UOR-Bioreconstruct-CityWalk-Bus-Depot-Luke-Combs-Category-10-Construction-July-2026-3-scaled.jpeg\" alt=\"Two projects are rapidly reshaping separate areas of Universal CityWalk Orlando, with a new bar and restaurant on the horizon and faster bus access for resort guests.\" class=\"wp-image-1456933\"\/><\/a>@bioreconstruct\/x<\/p>\n<p>A new update from aerial photographer <a href=\"https:\/\/x.com\/bioreconstruct\" target=\"_blank\" rel=\"noopener noreferrer nofollow\" aria-describedby=\"external-link-warning\">bioreconstruct<\/a> offers one of the clearest looks yet at the future home of Luke Combs\u2019 Category 10, which is being constructed along the CityWalk waterfront.<\/p>\n<p>Most of the existing outdoor structures within the construction zone have now been removed, leaving a broad expanse of exposed soil, broken concrete, and construction debris between Margaritaville and Bigfire. Excavators and other heavy equipment are stationed throughout the site as crews continue clearing the area.<\/p>\n<p><a data-fslightbox=\"1\" data-type=\"image\" aria-label=\"Open fullscreen lightbox with current image\" data-caption=\"@bioreconstruct\/x\" href=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/07\/UOR-Bioreconstruct-CityWalk-Bus-Depot-Luke-Combs-Category-10-Construction-July-2026-1-scaled.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1440\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/07\/UOR-Bioreconstruct-CityWalk-Bus-Depot-Luke-Combs-Category-10-Construction-July-2026-1-scaled.jpeg\" alt=\"Two projects are rapidly reshaping separate areas of Universal CityWalk Orlando, with a new bar and restaurant on the horizon and faster bus access for resort guests.\" class=\"wp-image-1456931\"\/><\/a>@bioreconstruct\/x<\/p>\n<p>The former waterfront bar and surrounding guest areas are no longer recognizable. Portions of the old pavement have been demolished, while strips of concrete remain along the side closest to the active CityWalk promenade. Bundles of removed pipes, metal pieces, and other materials have been collected around the perimeter.<\/p>\n<p>Black construction walls surround the site, separating the active project from guests walking between Bigfire, Margaritaville, and the waterfront. Several palm trees remain immediately alongside the work zone. <\/p>\n<p>The photos also show that the pavement and landscaping formerly extending toward the lagoon have been largely stripped away. Temporary erosion-control barriers line the water\u2019s edge while crews prepare the property for more substantial construction.<\/p>\n<p><a data-fslightbox=\"1\" data-type=\"image\" aria-label=\"Open fullscreen lightbox with current image\" data-caption=\"@bioreconstruct\/x\" href=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/07\/UOR-Bioreconstruct-CityWalk-Bus-Depot-Luke-Combs-Category-10-Construction-July-2026-4-scaled.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1440\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/07\/UOR-Bioreconstruct-CityWalk-Bus-Depot-Luke-Combs-Category-10-Construction-July-2026-4-scaled.jpeg\" alt=\"Two projects are rapidly reshaping separate areas of Universal CityWalk Orlando, with a new bar and restaurant on the horizon and faster bus access for resort guests.\" class=\"wp-image-1456934\"\/><\/a>@bioreconstruct\/x<\/p>\n<p><a href=\"https:\/\/wdwnt.com\/2026\/02\/luke-combs-category-10-open-universal-citywalk-universal-orlando\/\" target=\"_blank\" rel=\"noopener noreferrer nofollow\" aria-describedby=\"external-link-warning\">Category 10 is scheduled to open in late 2027<\/a>. The three-story, approximately 33,000-square-foot restaurant, bar, and live entertainment venue will be inspired by Combs\u2019 music and personal interests. Its name references his hit song \u201cHurricane.\u201d<\/p>\n<p>The Orlando venue will be the third Category 10 location, following the flagship Nashville establishment and a Las Vegas location scheduled to debut in 2026. Plans call for waterfront views, live music, food, drinks, and several distinct entertainment spaces.<\/p>\n<p>Earlier work included the removal of <a href=\"https:\/\/wdwnt.com\/2026\/04\/universal-citywalk-merchandise-kiosks-removed-luke-combs-restaurant\/\" target=\"_blank\" rel=\"noopener noreferrer nofollow\" aria-describedby=\"external-link-warning\">several merchandise kiosks<\/a> and the <a href=\"https:\/\/wdwnt.com\/2026\/06\/riverfront-bar-removed-for-luke-combs-category-10-construction-at-universal-citywalk-orlando\/\" target=\"_blank\" rel=\"noopener noreferrer nofollow\" aria-describedby=\"external-link-warning\">Riverfront bar<\/a>. The latest aerial views indicate that demolition has now expanded across nearly the entire future development site.<\/p>\n<p>New CityWalk Bus Depot Entry Lane<a data-fslightbox=\"1\" data-type=\"image\" aria-label=\"Open fullscreen lightbox with current image\" data-caption=\"@bioreconstruct\/x\" href=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/07\/UOR-Bioreconstruct-CityWalk-Bus-Depot-Luke-Combs-Category-10-Construction-July-2026-2-scaled.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1440\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/07\/UOR-Bioreconstruct-CityWalk-Bus-Depot-Luke-Combs-Category-10-Construction-July-2026-2-scaled.jpeg\" alt=\"Two projects are rapidly reshaping separate areas of Universal CityWalk Orlando, with a new bar and restaurant on the horizon and faster bus access for resort guests.\" class=\"wp-image-1456932\"\/><\/a>@bioreconstruct\/x<\/p>\n<p>Elsewhere at Universal Orlando Resort, construction continues on a <a href=\"https:\/\/wdwnt.com\/2026\/06\/universal-citywalk-orlando-bus-improvements-underway-as-new-terminal-entry-lane-takes-shape\/\" target=\"_blank\" rel=\"noopener noreferrer nofollow\" aria-describedby=\"external-link-warning\">new roadway leading into the CityWalk bus depot<\/a>.<\/p>\n<p>The new aerial view shows a long, narrow lane being built between Universal Boulevard and the existing perimeter of the active bus depot. Much of the curb has been installed, clearly defining the route of the future roadway as it curves toward the depot.<\/p>\n<p>The route appears designed to create a more direct or dedicated approach for buses entering the CityWalk depot. Once complete, the reconfigured roadway could help separate and streamline bus movements from other traffic approaching the parking garages and resort transportation facilities.<\/p>\n<p>The work also fits into Universal\u2019s broader focus on transportation infrastructure. Earlier this year, the Shingle Creek Transit and Utility Community Development District <a href=\"https:\/\/www.bing.com\/ck\/a?!&amp;&amp;p=41b57ac145bd90665ea517306bcfce3e3ff9943709d16d48e20b21e19d38af4dJmltdHM9MTc4MjUxODQwMA&amp;ptn=3&amp;ver=2&amp;hsh=4&amp;fclid=114d370f-04b7-6f2c-31ed-239105c66ef3&amp;psq=site%3awdwnt.com+shingle+creek+boring+company&amp;u=a1aHR0cHM6Ly93ZHdudC5jb20vMjAyNi8wMi9lbG9uLW11c2tzLWJvcmluZy1jb21wYW55LW5vbWluYXRlZC10by1jb25uZWN0LXVuaXZlcnNhbC1vcmxhbmRvLXBhcmtzLXZpYS10dW5uZWxzLw\" target=\"_blank\" rel=\"noopener noreferrer nofollow\" aria-describedby=\"external-link-warning\">voted to begin contract negotiations with The Boring Company<\/a> for a potential future transit project, though that remains in the feasibility stage and is separate from this visible CityWalk roadway work.<\/p>\n<p>Have you visited another Category 10 bar before? Tell us about the experience on social media!<\/p>\n<p>For more Universal Studios news from around the world, follow Universal Parks News Today on <a rel=\"noreferrer noopener nofollow\" href=\"https:\/\/twitter.com\/UniNewsToday\" target=\"_blank\" aria-describedby=\"external-link-warning\">Twitter<\/a>, <a rel=\"noreferrer noopener nofollow\" href=\"https:\/\/www.facebook.com\/UniversalParksNewsToday\" target=\"_blank\" aria-describedby=\"external-link-warning\">Facebook<\/a>, and <a rel=\"noreferrer noopener nofollow\" href=\"https:\/\/www.instagram.com\/uninewstoday\/\" target=\"_blank\" aria-describedby=\"external-link-warning\">Instagram<\/a>. For Disney Parks news, visit <a href=\"https:\/\/wdwnt.com\/category\/parks-resorts\/\" target=\"_blank\" rel=\"noopener noreferrer nofollow\" aria-describedby=\"external-link-warning\">WDWNT<\/a>.<\/p>\n<p>\t\t<script async src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><script async src=\"\/\/www.instagram.com\/embed.js\"><\/script><\/p>\n","protected":false},"excerpt":{"rendered":"Two projects are rapidly reshaping separate areas of Universal CityWalk Orlando, with a new bar and restaurant on&hellip;\n","protected":false},"author":2,"featured_media":337802,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[2674,10524,55609,75962,75963,85016,139,141,140,3435,2749,85017,43180,85015],"class_list":["post-337801","post","type-post","status-publish","format-standard","has-post-thumbnail","category-orlando","tag-bus","tag-citywalk","tag-depot","tag-luke-combs","tag-luke-combs-category-10","tag-moving-walkway","tag-orlando","tag-orlando-headlines","tag-orlando-news","tag-universal","tag-universal-orlando-resort","tag-universal-orlando-resort-moving-walkway","tag-universal-orlando-resort-parking-garages","tag-universal-orlando-resort-security"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/337801","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/comments?post=337801"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/337801\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media\/337802"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media?parent=337801"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/categories?post=337801"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/tags?post=337801"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}