{"id":339039,"date":"2026-07-13T23:17:41","date_gmt":"2026-07-13T23:17:41","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-fl\/339039\/"},"modified":"2026-07-13T23:17:41","modified_gmt":"2026-07-13T23:17:41","slug":"martin-county-faces-2-1-billion-transportation-funding-gap-as-needs-outpace-available-money","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-fl\/339039\/","title":{"rendered":"Martin County faces $2.1 billion transportation funding gap as needs outpace available money"},"content":{"rendered":"<p class=\"text | article-text\">Martin County is facing a $2.1 billion transportation funding shortfall \u2014 and the gap between what the county needs and what it can afford could shape how residents get around for decades.<\/p>\n<p class=\"text | article-text\">WATCH WPTV&#8217;S COVERAGE BELOW:<\/p>\n<p class=\"text | article-text\">A powerpoint obtained through a public records request show the Martin County Metropolitan Planning Organization (MPO) estimates the county will need approximately $2.8 billion for transportation improvements over the next 20 years. But only $701 million is currently available \u2014 meaning the county can fund just about one quarter of its identified needs.<\/p>\n<p class=\"text | article-text\">&#8220;So, how are we going to make up the difference? I mean, that&#8217;s always a question that&#8217;s asked,&#8221; Beth Beltran, administrator for Martin County&#8217;s Metropolitan Planning Organization, said.<\/p>\n<p class=\"text | article-text\">The cost analysis was emailed to county and Stuart officials last August. The document outlines transportation needs across roads, transit, aviation, freight, and other infrastructure categories through 2050.<\/p>\n<p class=\"text | article-text\">Of the $701 million currently available, all but $10 million comes from state and federal funding sources.<\/p>\n<p>Roads in need, but money falls short<\/p>\n<p class=\"text | article-text\">Among the most pressing unfunded needs: nine roads the county identified as requiring widening as traffic grows. The total cost to widen those roads is approximately $213 million \u2014 money that is not currently available, leaving all nine projects out of the county&#8217;s draft Cost Feasible Plan.<\/p>\n<p class=\"text | article-text\">Those roads include:<\/p>\n<p>SW Martin Downs BoulevardSR-714\/SW Martin HighwaySW 96th StreetSW Bridge RoadCR-714\/SW Martin HighwaySW Allapattah Road\/CR-609SE Green River ParkwaySW Indiantown AvenueSE Bridge Road\/CR-708<\/p>\n<p class=\"text | article-text\">May and Maddy Brumlow travel Martin Downs Boulevard nearly every day and said the congestion is already noticeable.<\/p>\n<p class=\"text | article-text\">&#8220;There&#8217;s always traffic, it&#8217;s always backed up,&#8221; Maddy Brumlow said.<\/p>\n<p class=\"text | article-text\">When told about the scale of the funding gap, the reaction was immediate.<\/p>\n<p class=\"text | article-text\">&#8220;Is there like, an itemized bill where we could break this down?&#8221; May Brumlow asked? <\/p>\n<p>A common problem, but still a difficult one<\/p>\n<p class=\"text | article-text\">Beltran said funding shortfalls of this scale are not unusual.<\/p>\n<p class=\"text | article-text\">&#8220;I don&#8217;t think I know of one MPO in the whole country where the needs are equal to the revenue,&#8221; Beltran said.<\/p>\n<p class=\"text | article-text\">Beltran said local governments routinely identify transportation needs and then compete for limited state and federal dollars to fund them. <\/p>\n<p class=\"text | article-text\">The Martin County MPO&#8217;s draft 2050 Long Range Transportation Plan, known as &#8220;Martin Moves 2050,&#8221; reflects that reality \u2014 prioritizing projects that can be funded while acknowledging billions in unmet needs.<\/p>\n<p class=\"text | article-text\">&#8220;And really, safety for the MPO board as well as the state is the number one thing they really consider,&#8221; Beltran said.<\/p>\n<p>SR-710 a top safety priority<\/p>\n<p class=\"text | article-text\">State Road 710 is among the county&#8217;s highest priorities. The corridor has been the subject of repeated safety concerns.<\/p>\n<p class=\"text | article-text\">&#8220;Fatal crashes as well as serious injury crashes were just enormous out there,&#8221; Beltran said. &#8220;So that&#8217;s about $300 million.&#8221; <\/p>\n<p class=\"text | article-text\">The draft plan includes several SR-710 projects that are already funded or programmed, including a realignment at CR-714\/Martin Highway, widening from CR-609 to SW Van Buren Road, and additional widening segments totaling nearly 16 miles.<\/p>\n<p>What is in the draft plan<\/p>\n<p class=\"text | article-text\">The draft Cost Feasible Plan totals approximately $746 million in year-of-expenditure dollars and covers a range of transportation categories:<\/p>\n<p>Highway and roadway projects: $213.97 million, including SR-710 improvements, widening of Cove Road, SW Newfield Parkway, HighMeadow Avenue, and a new Willoughby Boulevard ExtensionTurnpike projects: $274.81 million, including a new interchange study at milepost 125, direct connect ramps, and widening north of SR-714 to north of Becker RoadTransit: $160.4 million, covering existing fixed route and paratransit service, new microtransit zones, new fixed route service along Kanner Highway and a Jensen Beach Trolley, and capital improvements including fleet replacement and bus stop upgradesTransportation System Management and Operations (TSM&amp;O): $23.9 million across 13 roadway segmentsComplete Streets and non-motorized improvements: $34.7 million for 14 miles of complete streets, 24 miles of sidewalk, 88 miles of bicycle lanes, and nearly 500 miles of shared-use paths and trailsAviation: $44.02 million for capital improvements at Witham Field AirportStrategic Intermodal System (SIS): $27.3 million, including a grade separation at the FEC Railway crossing on SR-714 and an I-95 managed lanes studyOther improvements: $10.4 million, including three park-and-ride facilities and an FEC Rail Bridge double-tracking study over the St. Lucie RiverCove Road widening among funded projects<\/p>\n<p class=\"text | article-text\">Cove Road \u2014 a route long plagued by heavy traffic \u2014 is among the projects that did make it into the cost-feasible plan. The project would widen the road from two lanes to four and add a shared-use path.<\/p>\n<p class=\"text | article-text\">Still, with billions in unfunded needs, residents said they hope quality of life remains part of the conversation.<\/p>\n<p class=\"text | article-text\">&#8220;If there&#8217;s better places for the money to go, then I guess it&#8217;s not the end of the world we&#8217;re having traffic like this,&#8221; Nick Venezia said. &#8220;The fact that we&#8217;re even at that point in money is ridiculous.&#8221;<\/p>\n<p>What comes next<\/p>\n<p class=\"text | article-text\">Residents can submit input to the Martin County MPO by contacting Principal Planner Ricardo Vazquez at <a class=\"Link\" href=\"https:\/\/www.wflx.com\/2026\/07\/13\/martin-county-faces-21-billion-transportation-funding-gap-needs-outpace-available-money\/mailto:rvazquez@martin.fl.us\" rel=\"nofollow noopener\" target=\"_blank\">rvazquez@martin.fl.us<\/a> or by calling (772) 223-7983.<\/p>\n<p class=\"text | article-text\">This story was reported on-air by a journalist and has been converted to this platform with the assistance of AI. Our editorial team verifies all reporting on all platforms for fairness and accuracy.<\/p>\n","protected":false},"excerpt":{"rendered":"Martin County is facing a $2.1 billion transportation funding shortfall \u2014 and the gap between what the county&hellip;\n","protected":false},"author":2,"featured_media":339040,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[171,173,172],"class_list":["post-339039","post","type-post","status-publish","format-standard","has-post-thumbnail","category-port-st-lucie","tag-port-st-lucie","tag-port-st-lucie-headlines","tag-port-st-lucie-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/339039","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/comments?post=339039"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/339039\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media\/339040"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media?parent=339039"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/categories?post=339039"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/tags?post=339039"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}