{"id":357795,"date":"2026-07-30T17:23:09","date_gmt":"2026-07-30T17:23:09","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-fl\/357795\/"},"modified":"2026-07-30T17:23:09","modified_gmt":"2026-07-30T17:23:09","slug":"tallahassee-advances-phase-3-of-centerville-road-electric-project-eyes-phase-4-2","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-fl\/357795\/","title":{"rendered":"Tallahassee advances phase 3 of Centerville Road electric project, eyes phase 4"},"content":{"rendered":"<p>TALLAHASSEE, Fla. &#8212; Construction is moving forward on the City of Tallahassee\u2019s electric infrastructure project along Centerville Road, with crews nearing the end of phase three and planning to begin phase four later this year.<\/p>\n<p>Jason Smith, a line crew foreman with the city, said crews are currently working on phase three, which runs between Trescott and Woodgate on Centerville Road. Smith called it \u201cprobably the most challenging phase we\u2019ve had so far\u201d because of the number of driveways, homes, roads and neighborhoods connected to that stretch.<\/p>\n<p>\u201cSo trying to work with the traffic and get everybody in and out of their houses every day and around us has been a little more of a challenge,\u201d Smith said, adding, \u201cbut we\u2019re working through it good.\u201d<\/p>\n<p>Smith said the city expects to wrap up phase three in \u201cabout another week and a half or so.\u201d After that, he said there will be a break before phase four begins, in part to avoid disrupting school bus routes once school starts back.<\/p>\n<p>\u201cWe wanted to take a little break at school buses on their normal routes, and then we\u2019re going to start back on phase four in the end of September,\u201d Smith said.<\/p>\n<p>Phase four is expected to run from Woodgate to near Capitol Circle, \u201cright in front of CHP,\u201d Smith said. He added that crews will return to nighttime work during that phase to reduce daytime impacts.<\/p>\n<p>\u201cWe\u2019ll be back to working at night, so we won\u2019t be impacting everybody through the middle of the day again on that,\u201d Smith said.<\/p>\n","protected":false},"excerpt":{"rendered":"TALLAHASSEE, Fla. &#8212; Construction is moving forward on the City of Tallahassee\u2019s electric infrastructure project along Centerville Road,&hellip;\n","protected":false},"author":2,"featured_media":357497,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[232,234,233],"class_list":["post-357795","post","type-post","status-publish","format-standard","has-post-thumbnail","category-tallahassee","tag-tallahassee","tag-tallahassee-headlines","tag-tallahassee-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/357795","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/comments?post=357795"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/357795\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media\/357497"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media?parent=357795"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/categories?post=357795"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/tags?post=357795"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}