{"id":401579,"date":"2026-09-16T15:06:22","date_gmt":"2026-09-16T15:06:22","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-fl\/401579\/"},"modified":"2026-09-16T15:06:22","modified_gmt":"2026-09-16T15:06:22","slug":"major-lane-closures-are-coming-to-north-beachs-71st-street-until-2027","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-fl\/401579\/","title":{"rendered":"Major lane closures are coming to North Beach&#8217;s 71st Street until 2027"},"content":{"rendered":"<p class=\"single__subtitle\">Overnight and midday construction will bring lane reductions, side-street closures and intersection upgrades to the North Beach corridor.<\/p>\n<p>\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/09\/zac-gudakov-Rj7sPIb4LY0-unsplash-1024x683.jpg\" class=\"wp-block-post-featured-image\" alt=\"Road closed sign\" width=\"1024\" height=\"683\"\/><\/p>\n<p class=\"wp-block-paragraph\">Heads up, North Beach drivers! If 71st Street is part of your commute, be sure to plan ahead for extra travel time. The <a href=\"https:\/\/www.fdotmiamidade.com\/project\/358\/443926-1-52\" rel=\"nofollow noopener\" target=\"_blank\" class=\"shortcode-outbound-link\" data-has-ga=\"true\" data-ga-type=\"click\" data-label=\"https:\/\/www.fdotmiamidade.com\/project\/358\/443926-1-52\" data-action=\"text_cta_0\" data-category=\"click_non_sales\">Florida Department of Transportation<\/a> has kicked off a $2.2 million roadway improvement project that impacts traffic from Bay Drive East all the way to S.R. A1A\/Collins Avenue through early 2027.<\/p>\n<p>How traffic will be impacted<\/p>\n<p class=\"wp-block-paragraph\">As crews work on the road, here\u2019s everything you need to know to avoid the worst of the gridlock:<\/p>\n<p>Eastbound: One lane closed Sunday through Thursday (6 p.m. to 7 a.m.) and Friday through Saturday (7 p.m. to 8 a.m.). Two lanes close overnight Sunday through Thursday (11 p.m. to 7 a.m.) and Friday through Saturday (12 a.m. to 8 a.m.).<\/p>\n<p>Westbound: One lane closed Sunday through Thursday (9:30 p.m. to 7:30 a.m.) and Friday through Saturday (10 p.m. to 8 a.m.).<\/p>\n<p>Both directions: One lane closed weekdays and weekends from 9 a.m. to 3:30 p.m.<\/p>\n<p>Side streets: One lane on surrounding side streets closed daily between 9 a.m. to 3:30 p.m. and 9 p.m. to 6 a.m.<\/p>\n<p>Why is work being done on 71st Street?<\/p>\n<p class=\"wp-block-paragraph\">The project is focused on making the area safer for pedestrians and extending the life of the roadway. According to FDOT, crews are working on a full repaving and restriping of the road, as well as upgraded signals and crosswalks at all intersections between Bay Drive East and Harding Avenue, a new video detection system installation, pedestrian curb ramps and signals for ADA compliance.<\/p>\n<p>Other construction projects to look out for<\/p>\n<p class=\"wp-block-paragraph\">Current construction projects spanning across Miami-Dade County include:<\/p>\n<p>Tamiami Trail (U.S. 41\/SW 8 St)<\/p>\n<p>Biscayne Blvd (S.R. 5) from NE 61 St to NE 6 Ave<\/p>\n<p>U.S. 1\/South Dixie Hwy from SW 264 St to SW 112 Ave<\/p>\n<p>SW 8 St (U.S. 41) at SW 109 Ave Pedestrian Bridge<\/p>\n<p>Collins Ave (S.R. A1A) from NE 163 St to NE 178 St<\/p>\n<p>Port Boulevard from Biscayne Blvd to PortMiami<\/p>\n<p>NW 27 Ave (S.R. 817) from Sesame St to Dunad Ave<\/p>\n<p>Coral Way from SW 22 Ave to 17 Ave and from SW 12 Ave to Brickell Ave<\/p>\n<p>NW 135 St (S.R. 916) from NW 47 Ave to NW 30 Ave<\/p>\n<p>NW\/NE 135 St (S.R. 916) from NW 2 Ave to NE 17 Ave<\/p>\n<p class=\"wp-block-paragraph\">Find them all <a href=\"https:\/\/www.fdotmiamidade.com\/projects\/construction?page=all\" rel=\"nofollow noopener\" target=\"_blank\" class=\"shortcode-outbound-link\" data-has-ga=\"true\" data-ga-type=\"click\" data-label=\"https:\/\/www.fdotmiamidade.com\/projects\/construction?page=all\" data-action=\"text_cta_1\" data-category=\"click_non_sales\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"Overnight and midday construction will bring lane reductions, side-street closures and intersection upgrades to the North Beach corridor.&hellip;\n","protected":false},"author":2,"featured_media":401580,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[123,125,124],"class_list":["post-401579","post","type-post","status-publish","format-standard","has-post-thumbnail","category-miami","tag-miami","tag-miami-headlines","tag-miami-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/401579","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/comments?post=401579"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/401579\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media\/401580"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media?parent=401579"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/categories?post=401579"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/tags?post=401579"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}