{"id":407422,"date":"2026-09-22T18:16:49","date_gmt":"2026-09-22T18:16:49","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-fl\/407422\/"},"modified":"2026-09-22T18:16:49","modified_gmt":"2026-09-22T18:16:49","slug":"usf-breaks-ground-on-500-million-uptown-landing-formerly-fletcher-district","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-fl\/407422\/","title":{"rendered":"USF breaks ground on $500 million Uptown Landing, formerly Fletcher District"},"content":{"rendered":"<p>\t\t\t\t<a href=\"https:\/\/www.usforacle.com\/wp-content\/uploads\/sites\/2\/2026\/09\/5fd0b184-3f70-4946-8d7e-8af8c62bffa3.jpeg\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-95691\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/09\/5fd0b184-3f70-4946-8d7e-8af8c62bffa3-1024x683.jpeg\" alt=\"\" width=\"1024\" height=\"683\"  \/><\/a>Uptown Landing, a $500 million mixed-use development replacing the university\u2019s former golf course, is expected to be completed by fall 2028, though some students worry about the traffic it will bring to campus. ORACLE PHOTO\/VIOLET VASQUEZ PIMENTEL<\/p>\n<p>On Sept. 8, USF held a groundbreaking ceremony for \u201cUptown Landing,\u201d the new mixed-use development that will replace the university\u2019s former 138-acre <a href=\"https:\/\/www.usf.edu\/news\/2025\/usf-moves-forward-with-plans-for-new-mixed-use-project-featuring-housing-restaurants-academic-research-facility-and-more.aspx#:~:text=138%2Dacre%20golf%20course\" rel=\"nofollow noopener\" target=\"_blank\">golf course<\/a>.<\/p>\n<p>The project is expected to cost nearly $500 million and will include student housing, restaurants, retail spaces, a hotel, conference center and a major academic research building.<\/p>\n<p>The development will be north of Fletcher Avenue and east of North 46th Street, which is within walking distance of USF\u2019s new <a href=\"https:\/\/gousfbulls.com\/news\/2026\/6\/30\/football-game-changer-stadium-built-to-be-a-home-for-every-bulls-fan\" rel=\"nofollow noopener\" target=\"_blank\">on-campus stadium<\/a>.<\/p>\n<p>The project is expected to open for fall 2028, only a year after the stadium is planned to be completed.<\/p>\n<p>During the ceremony, USF announced the project\u2019s new name \u2014 it will no longer be called \u201cFletcher District,\u201d according to <a href=\"https:\/\/www.usf.edu\/news\/2026\/uptown-landing-name-unveiled-as-construction-begins-on-transformative-mixed-use-destination-at-usf.aspx\" rel=\"nofollow noopener\" target=\"_blank\">USF<\/a>.<\/p>\n<p>USF President Moez Limayem <a href=\"https:\/\/www.usf.edu\/news\/2026\/uptown-landing-name-unveiled-as-construction-begins-on-transformative-mixed-use-destination-at-usf.aspx#:~:text=%E2%80%9CUptown%20Landing%20is%20much%20more%20than%20a%20new%20neighborhood.%20%C2%A0This%20will%20be%20a%20destination%20anchored%20by%20USF%2C%20but%20created%20for%20the%20entire%20community%2C%E2%80%9D%20USF%20President%20Moez%20Limayem%20said.\" rel=\"nofollow noopener\" target=\"_blank\">said<\/a> at the groundbreaking event that the name means much more than a neighborhood.<\/p>\n<p>\u201cUptown is a name this district has earned through decades of research, innovation, jobs and investment,\u201d the president said. \u201cWe\u2019re not creating an identity here. We\u2019re helping write its next chapter.\u201d<\/p>\n<p>Aryan Vadlamudi, a sophomore majoring in biomedical sciences, said the development is a good thing for the university.<\/p>\n<p>\u201cI think it\u2019s a good idea to expand the campus,\u201d Vadlamudi said. \u201cI feel like they can definitely make more new buildings for campus because a lot of the buildings are older.\u201d\u00a0\u00a0<\/p>\n<p>Related: <a href=\"https:\/\/www.usforacle.com\/2025\/11\/06\/usfs-fletcher-district-approved-in-board-of-governors-meeting\/\" rel=\"nofollow noopener\" target=\"_blank\">USF\u2019s Fletcher District approved in Board of Governors meeting<\/a><\/p>\n<p>The first phase is estimated to cost about $270 million to cover the public-private partnership and the other $225 million to go toward the academic research building, according to <a href=\"https:\/\/www.usf.edu\/uptown-landing\/faq\/index.aspx\" rel=\"nofollow noopener\" target=\"_blank\">USF<\/a>.<\/p>\n<p>For the public-private partnership, the <a href=\"https:\/\/www.usf.edu\/news\/2026\/uptown-landing-name-unveiled-as-construction-begins-on-transformative-mixed-use-destination-at-usf.aspx#:~:text=Uptown%20Landing%20will%20be%20developed%20through%20a%20Master%20Development%20Agreement%20with%20ACE%20Fletcher%2C%20LLC%2C%20an%20entity%20comprising%20Capstone%20Development%20Partners%2C%20Aureate%20Development%20and%20Ellison%20Development.%C2%A0\" rel=\"nofollow noopener\" target=\"_blank\">developer<\/a> is ACE Fletcher and will finance and own the student housing, affiliate housing, hotel and retail components during the term of ground leases.<\/p>\n<p>The development is designed to be a walkable area connected to campus, and the Bull Runner services are expected to provide additional access.<\/p>\n<p>Parking will also be included in different parts of the development, but the final parking plan is still being developed.<\/p>\n<p>During the project, USF is analyzing traffic patterns to reduce impacts on surrounding roads and said construction will create noise, but there are no plans for work during evening hours.<\/p>\n<p>Some students were worried about the USF Forest Preserve around the development, but USF said the site is west of the preserve and no construction will take place within it.<\/p>\n<p>Students said they are excited to have more places to eat and spend time around campus, but are concerned about how the construction will impact traffic.<\/p>\n<p>Vadlamudi said he works for USF\u2019s on-campus <a href=\"https:\/\/www.usf.edu\/student-affairs\/student-health-services\/services\/mru.aspx\" rel=\"nofollow noopener\" target=\"_blank\">ambulance services<\/a>, and is concerned about how traffic could get in the way of taking the ambulance across Fletcher Avenue.<\/p>\n<p>\u201cIt would be hard to get across Fletcher sometimes, because I know that there\u2019s always going to be a lot of traffic, and I don\u2019t know what the traffic is going to look like for the Uptown Landing on top of all of campus,\u201d Vadlamudi said.<\/p>\n<p>For the construction period, Vadlamudi said he thinks the inside of campus will not be affected.<\/p>\n<p>\u201cI don\u2019t think it\u2019ll affect the campus itself, but I know a lot of people live around that area, like with apartments, so maybe it\u2019ll affect them,\u201d Vadlamudi said.<\/p>\n<p>Even though Vadlamudi said he is excited about the project, he said he does not believe it will be completed by the expected date.<\/p>\n<p>\u201cA lot of the [time] they push things back, so I\u2019m kind of skeptical of it being done by fall 2028,\u201d Vadlamudi said.<\/p>\n<p>Related: <a href=\"https:\/\/www.usforacle.com\/2025\/08\/27\/usf-mixeddevelopment\/\" rel=\"nofollow noopener\" target=\"_blank\">USF reveals vision for housing, retail on former golf course site<\/a><\/p>\n<p>Opposite of Vadlamudi, Mikayla Shedrawy, a sophomore international business major, said she believes the development will be completed by fall 2028.<\/p>\n<p>\u201cMaybe if circumstances do come up, like weather and hurricanes, it might affect the construction; I feel like they\u2019re pretty accurate with their plans and to stay on track,\u201d Shedrawy said.<\/p>\n<p>Yet, Shedrawy also said she thinks the development will bring a lot more traffic to campus and its surroundings.<\/p>\n<p>\u201cSo I hope that they improve the parking and just traffic of it all. Like I think they might not be thinking too much about that,\u201d Shedrawy said.<\/p>\n<p>Despite this concern, she said she is excited about having restaurants, stores and other activities closer to campus.<\/p>\n<p>\u201cI am really excited to have a very close-by area to go to all the time,\u201d Shedrawy said. \u201cYou know, instead of having to drive 30 minutes to go downtown, it\u2019s like we have like a mini downtown right here.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"Uptown Landing, a $500 million mixed-use development replacing the university\u2019s former golf course, is expected to be completed&hellip;\n","protected":false},"author":2,"featured_media":407423,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[135,137,136],"class_list":["post-407422","post","type-post","status-publish","format-standard","has-post-thumbnail","category-tampa","tag-tampa","tag-tampa-headlines","tag-tampa-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/407422","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/comments?post=407422"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/407422\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media\/407423"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media?parent=407422"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/categories?post=407422"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/tags?post=407422"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}