{"id":410462,"date":"2026-09-25T16:22:10","date_gmt":"2026-09-25T16:22:10","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-fl\/410462\/"},"modified":"2026-09-25T16:22:10","modified_gmt":"2026-09-25T16:22:10","slug":"county-road-220-bridge-replacement-widening-project-complete-and-open-to-traffic","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-fl\/410462\/","title":{"rendered":"County Road 220 bridge replacement, widening project complete and open to traffic"},"content":{"rendered":"<p class=\"sc-dLMFU sc-fHjqPf jbiTJv kYFPaL article-text\">CLAY COUNTY, Fla. \u2013 The County Road 220 bridge replacement and four-lane widening project is complete and open to traffic.<\/p>\n<p class=\"sc-dLMFU sc-fHjqPf jbiTJv kYFPaL article-text\">The project was completed ahead of schedule, with no workplace accidents reported during construction.<\/p>\n<p class=\"sc-dLMFU sc-fHjqPf jbiTJv kYFPaL article-text\">Phase 1 began in December 2024 and included intersection improvements at Rideout Ferry Road.<\/p>\n<p class=\"sc-dLMFU sc-fHjqPf jbiTJv kYFPaL article-text\">Phase 2 began in January 2025 and included construction of a new four-lane bridge over Little Black Creek. The new bridge replaces the previous structure, which was built in 1947.<\/p>\n<p class=\"sc-dLMFU sc-fHjqPf jbiTJv kYFPaL article-text\">The improvements are expected to improve traffic flow and connectivity along the corridor.<\/p>\n<p class=\"sc-dLMFU sc-fHjqPf ilkOIf copyright\">Copyright 2026 by WJXT News4JAX &#8211; All rights reserved.<\/p>\n<p>About the AuthorJonathan Lundy headshot<img alt=\"\"  loading=\"lazy\" decoding=\"async\" role=\"presentation\"  src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/09\/1790353330_216_da005125-f71e-4e37-982c-07ed67f40296.png\"\/><a class=\"sc-bmzYkS fERtCt\" href=\"https:\/\/www.news4jax.com\/team\/JLundy\/\" title=\"View Jonathan Lundy&#039;s full profile\" itemprop=\"url\" rel=\"nofollow noopener\" target=\"_blank\">Jonathan Lundy<\/a><\/p>\n<p class=\"sc-dLMFU sc-fHjqPf ctDavV cigBRW\">Hailing from Detroit, Jonathan is excited to start his media career at News4JAX in November 2023. He is passionate about telling stories that matter to the community and he is honored to serve Jacksonville.<\/p>\n","protected":false},"excerpt":{"rendered":"CLAY COUNTY, Fla. \u2013 The County Road 220 bridge replacement and four-lane widening project is complete and open&hellip;\n","protected":false},"author":2,"featured_media":410463,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[3487,162853,116,118,117],"class_list":["post-410462","post","type-post","status-publish","format-standard","has-post-thumbnail","category-jacksonville","tag-clay-county","tag-cr-220","tag-jacksonville","tag-jacksonville-headlines","tag-jacksonville-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/410462","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/comments?post=410462"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/410462\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media\/410463"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media?parent=410462"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/categories?post=410462"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/tags?post=410462"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}