{"id":410598,"date":"2026-09-25T19:22:07","date_gmt":"2026-09-25T19:22:07","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-fl\/410598\/"},"modified":"2026-09-25T19:22:07","modified_gmt":"2026-09-25T19:22:07","slug":"council-to-consider-method-for-uep-assessment","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-fl\/410598\/","title":{"rendered":"Council to consider method for UEP assessment"},"content":{"rendered":"<p>The Cape Coral City Council is expected to vote on resolutions related to the assessment methodology for the North 3 Utility Expansion Project (UEP) on Monday.<\/p>\n<p>The next phase in the UEP will adopt assessment methodology for two components: line extension assessment, based on equivalent parcel method for water and irrigation distribution mains and wastewater collection mains; and the capital facility expansion charge, based on equivalent residential unit method for treatment and transmission.<\/p>\n<p>The city also is installing Alternative 5 for the \u201capplicable North 3 UEP major-road corridors instead of the typical major road section,\u201d the presentation states. This method differs from the standard UEP approach \u201cby allocating more space to roadway and drainage\/greenway functions, rather than treating the corridor as an ordinary residential street, while providing enhances multi-modal facilities.\u201d<\/p>\n<p>There are 6,668.7 equivalent parcels for estimated water and wastewater and 6,633.5 for estimated irrigation. The total parcels for estimated water and wastewater is 5,179 and 5,180 for estimated irrigation.<\/p>\n<p>North 3, located east of Burnt Store Road, has an estimated total of $35,264 per property and North 3, located west of Burnt Store Road, has a total of $41,029.<\/p>\n<p>The North 1 East total was $32,288, and North 1 West was $33,367.<\/p>\n<p>According to the presentation scheduled for the special meeting, the assessment can be paid in full or in annual installments on a tax bill.<\/p>\n<p>The city will finance the cost of North 3 through bonds, which will be repaid over time by the assessments and water and sewer fees.<\/p>\n<p>The North 3 UEP includes 58.8 road miles, which has an estimated project cost of $384.1 million. The construction bid is $327.8 million.<\/p>\n<p>According to the presentation, the estimated cost funding sources for North 3 are $179.3 million from SF, $142.5 million from CFEC, $35.5 million from alternative 5 road improvements, $4.5 million from transportation, $21.6 million from stormwater (debt), and $0.7 million from utility fees (fiber optics).<\/p>\n<p>The council will vote on three resolutions, 243-26, 244-26 and 245-26, all of which have public hearings. They all relate to the construction and funding of potable water improvements, while creating the North 3 Potable Water Improvement Area, as well as confirming the initial assessment resolution and establishing the maximum of annual assessment.<\/p>\n<p>According to the presentation, there are many next steps for the process, which include a homeowners informational meeting on Oct. 19; a public hearing for final assessment resolutions and assessment rolls, resolution to approve construction contracts, and resolution to approve construction engineering and inspection contract on Nov. 2; followed by a notice to proceed for construction in December.<\/p>\n<p>The special meeting will be held at 4 p.m. Monday, Sept. 28, in City Council chambers, at 1015 Cultural Park Blvd., Cape Coral.<\/p>\n<p>The meeting is open to the public.<\/p>\n<p>To reach MEGHAN BRADBURY, please email <a href=\"https:\/\/www.capecoralbreeze.com\/news\/local-news\/2026\/09\/25\/council-to-consider-method-for-uep-assessment\/mailto:mbradbury@breezenewspapers.com\" rel=\"nofollow noopener\" target=\"_blank\">mbradbury@breezenewspapers.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"The Cape Coral City Council is expected to vote on resolutions related to the assessment methodology for the&hellip;\n","protected":false},"author":2,"featured_media":410599,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[209,211,210],"class_list":["post-410598","post","type-post","status-publish","format-standard","has-post-thumbnail","category-cape-coral","tag-cape-coral","tag-cape-coral-headlines","tag-cape-coral-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/410598","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/comments?post=410598"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/410598\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media\/410599"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media?parent=410598"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/categories?post=410598"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/tags?post=410598"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}