{"id":414175,"date":"2026-09-29T23:18:12","date_gmt":"2026-09-29T23:18:12","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-fl\/414175\/"},"modified":"2026-09-29T23:18:12","modified_gmt":"2026-09-29T23:18:12","slug":"cape-coral-homeowners-face-384m-utility-expansion-bill-lee-county","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-fl\/414175\/","title":{"rendered":"Cape Coral homeowners face $384M utility expansion bill | Lee County"},"content":{"rendered":"<p>                        <img loading=\"lazy\" decoding=\"async\" src=\"data:image\/png;base64,iVBORw0KGgoAAAANSUhEUgAAAAQAAAADCAQAAAAe\/WZNAAAAEElEQVR42mM8U88ABowYDABAxQPltt5zqAAAAABJRU5ErkJggg==\" alt=\"Crowd packs Cape Coral City Hall for utility hearing\" class=\"img-responsive lazyload full blur\" width=\"1200\" height=\"676\" data- data-\/><\/p>\n<p>             <img decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/09\/6abc03344ec47.image.jpg\" alt=\"\" aria-hidden=\"true\" loading=\"lazy\" height=\"113\" width=\"200\"\/><\/p>\n<p>Residents fill Cape Coral City Council chambers Sept. 28 for a public hearing on the North 3 Utility Expansion Project. The proposed project carries an estimated total cost of $384.1 million.<\/p>\n<p>                                    Cape Coral government<\/p>\n<p>Homeownership is becoming more expensive for Cape Coral residents north of Pine Island Road who are shouldering the cost of a massive Utility Expansion Project to rid the area of individual septic systems and wells.\u00a0<\/p>\n<p style=\"text-align: left;\">The latest part of the mandatory hookup to city water, sewer and irrigation targets an area called the North 3 UEP. It includes about 5,180 parcels south of Kismet Parkway, east and west of Burnt Store Road.\u00a0<\/p>\n<p style=\"text-align: left;\">A homeowner on an average lot in North 3 would owe more than $35,000 for the hookups if paid in full \u2014 or about $3,600 per year for 30 years with interest, city staff estimates. Each homeowner would also pay up to $5,000 for a plumber to complete the initial hookup and hundreds more in fees.\u00a0<\/p>\n<p style=\"text-align: left;\">City Council voted 5-3 to move forward with the North 3 UEP after a five-hour, standing-room-only meeting Sept. 28 in which residents packed council chambers. They asked the city to delay the project until after the November elections and find other funding sources.\u00a0<\/p>\n<p style=\"text-align: left;\">It was the first of two public hearings before construction can begin on the North 3 UEP. The next step is an Oct. 19 public information meeting. A final adoption hearing for the project is set for Nov. 2.\u00a0<\/p>\n<p style=\"text-align: left;\">If the city adopts the project, construction could begin as soon as December. North 3 homeowners would see the costs added to their yearly tax assessments beginning in November 2027.\u00a0<\/p>\n<p style=\"text-align: left;\">The average estimated cost for a homeowner east of Burnt Store Road \u2014 based on a typical 10,000-square-foot lot \u2014 comes to $35,264. That\u2019s typically financed over 30 years at $3,648 per year based on a 6.25% rate.\u00a0<\/p>\n<p style=\"text-align: left;\">Each homeowner would be responsible for hiring a plumber to complete the hookup at an estimated cost of $3,000 to $5,000. Additional costs, including disposal of an old septic system, come to about $650.\u00a0<\/p>\n<p style=\"text-align: left;\">North 3 residents west of Burnt Store Road would pay more because of roadway improvements added to their part of the project. They would pay the same initial plumbing fees plus an estimated $41,029, or $4,244 each year for 30 years.\u00a0<\/p>\n<p>                        <img loading=\"lazy\" decoding=\"async\" src=\"data:image\/png;base64,iVBORw0KGgoAAAANSUhEUgAAAAQAAAADCAQAAAAe\/WZNAAAAEElEQVR42mM8U88ABowYDABAxQPltt5zqAAAAABJRU5ErkJggg==\" alt=\"Cape Coral weighs costs of North 3 utility expansion\" class=\"img-responsive lazyload full blur\" width=\"1200\" height=\"675\" data- data-\/><\/p>\n<p>             <img decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/09\/6abc03344efe7.image.jpg\" alt=\"\" aria-hidden=\"true\" loading=\"lazy\" height=\"113\" width=\"200\"\/><\/p>\n<p>Cape Coral City Council considers financing for the North 3 Utility Expansion Project as a presentation shows estimated annual payments for homeowners east of Burnt Store Road. The council voted 5-3 Sept. 28 to advance the project.<\/p>\n<p>                                    Cape Coral government<\/p>\n<p style=\"text-align: left;\">The city also is offering 20- and 25-year payment terms, along with a hardship program that offers deferred payments for people who qualify annually and grants that cover initial hookup costs for very low-income residents.\u00a0<\/p>\n<p style=\"text-align: left;\">It\u2019s the same funding method the city has applied to the UEP in other areas, including <a target=\"_blank\" href=\"https:\/\/www.gulfshorebusiness.com\/lee\/cape-coral-residents-to-shoulder-227m-utility-project\/article_f3e52917-f555-4204-a84a-e3a53f1518d9.html\" rel=\"nofollow noopener\">North 2 and North 1 West and East.\u00a0<\/a><\/p>\n<p>                        <img loading=\"lazy\" decoding=\"async\" src=\"data:image\/png;base64,iVBORw0KGgoAAAANSUhEUgAAAAQAAAADCAQAAAAe\/WZNAAAAEElEQVR42mM8U88ABowYDABAxQPltt5zqAAAAABJRU5ErkJggg==\" alt=\"Cape Coral map shows decades of utility expansion\" class=\"img-responsive lazyload full blur\" width=\"1200\" height=\"675\" data- data-\/><\/p>\n<p>             <img decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/09\/6abc0334b258f.image.jpg\" alt=\"\" aria-hidden=\"true\" loading=\"lazy\" height=\"113\" width=\"200\"\/><\/p>\n<p>A city presentation maps Cape Coral\u2019s Utility Expansion Project history and shows North 3 among the latest areas targeted for water, wastewater and irrigation infrastructure.<\/p>\n<p style=\"text-align: left;\">The North 3 estimated cost is comparable to other recent areas that have undergone construction, such as North 1 East. City officials said they <a target=\"_blank\" href=\"https:\/\/www.gulfshorebusiness.com\/lee\/cape-coral-awarded-65-million-for-utility-extension-project\/article_0085ee90-eb24-4bfc-91a4-1ccb71928ef6.html\" rel=\"nofollow noopener\">continue to apply for grants that have helped lower costs for homeowners in some areas.\u00a0<\/a><\/p>\n<p style=\"text-align: left;\">The city\u2019s total estimated cost for the North 3 UEP comes to $384.1 million, based on current bids for construction and design.\u00a0<\/p>\n<p style=\"text-align: left;\">The three primary portions of the project include potable water utility construction for about $64 million, irrigation utilities for $69.7 million and wastewater, or sewer, construction for $141.4 million, a city staff report shows.\u00a0<\/p>\n<p style=\"text-align: left;\">That covers 58.8 miles of roads in North 3, including Tropicana, Yucatan, Gulfstream, Kismet and Van Buren parkways and Old Burnt Store Road.\u00a0<\/p>\n<p style=\"text-align: left;\">The city finances the project through <a target=\"_blank\" href=\"https:\/\/www.gulfshorebusiness.com\/lee\/city-council-agrees-on-borrowing-210-million-for-water-plans\/article_9eb12e65-2bbf-4dd3-a9e9-2db4aff0addd.html\" rel=\"nofollow noopener\">bonds, repaid primarily by homeowners in each project area along with utility fees.\u00a0<\/a><\/p>\n<p style=\"text-align: left;\">Council member Rachel Kaduk lives in a part of Cape Coral where the work is already being done. As a homeowner, she is paying the bill along with her neighbors and living through an ongoing construction project that has torn up her street and spread some of the residual material onto her vehicle.\u00a0<\/p>\n<p>                        <img loading=\"lazy\" decoding=\"async\" src=\"data:image\/png;base64,iVBORw0KGgoAAAANSUhEUgAAAAQAAAADCAQAAAAe\/WZNAAAAEElEQVR42mM8U88ABowYDABAxQPltt5zqAAAAABJRU5ErkJggg==\" alt=\"Cape Coral council member weighs North 3 utility project\" class=\"img-responsive lazyload full blur\" width=\"1200\" height=\"676\" data- data-\/><\/p>\n<p>             <img decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/09\/6abc03e1abb23.image.jpg\" alt=\"\" aria-hidden=\"true\" loading=\"lazy\" height=\"113\" width=\"200\"\/><\/p>\n<p>Cape Coral Council member Rachel Kaduk listens during a Sept. 28 hearing on the North 3 Utility Expansion Project. Kaduk, whose neighborhood is undergoing utility construction, supported a failed motion to defer further discussion until after the November elections.<\/p>\n<p>                                    Evan Williams<\/p>\n<p style=\"text-align: left;\">\u201cI feel what is coming for you guys,\u201d she told North 3 residents. \u201cYou have no idea how dirty my car is.\u201d\u00a0<\/p>\n<p style=\"text-align: left;\">Officials say the UEP is crucial to protect the city\u2019s aquifer-based water supply from running dry or saltwater intrusion. They also say it provides environmental benefits by eliminating leaky septic tanks, creates a more reliable utility system and uses treated wastewater for irrigation.\u00a0<\/p>\n<p style=\"text-align: left;\">Officials told residents that if they don\u2019t do the work now, it\u2019s going to get more expensive in the future.\u00a0<\/p>\n<p style=\"text-align: left;\">\u201cAnd we\u2019ll be back in the same room, when it\u2019s more expensive, waiting to kick the can down the road again,\u201d council member Bill Steinke said.\u00a0<\/p>\n<p>                        <img loading=\"lazy\" decoding=\"async\" src=\"data:image\/png;base64,iVBORw0KGgoAAAANSUhEUgAAAAQAAAADCAQAAAAe\/WZNAAAAEElEQVR42mM8U88ABowYDABAxQPltt5zqAAAAABJRU5ErkJggg==\" alt=\"Cape Coral official hears resident during utility hearing\" class=\"img-responsive lazyload full blur\" width=\"1200\" height=\"676\" data- data-\/><\/p>\n<p>             <img decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/09\/6abc03e1a2f1f.image.jpg\" alt=\"\" aria-hidden=\"true\" loading=\"lazy\" height=\"113\" width=\"200\"\/><\/p>\n<p>Cape Coral Mayor Pro Tem Bill Steinke listens as a resident addresses the City Council during a Sept. 28 hearing on the North 3 Utility Expansion Project.<\/p>\n<p>                                    Evan Williams<\/p>\n<p style=\"text-align: left;\">Attendees cheered a motion by council member Jennifer Nelson-Lastra to defer further discussion on the project until after the November elections. But the motion failed 5-3, with council members Kaduk and Keith Long supporting it.\u00a0<\/p>\n<p style=\"text-align: left;\">After the vote, most of the remaining audience left council chambers. Council members eventually voted to advance the project to the Nov. 2 final hearing. Nelson-Lastra, Long and Kaduk cast dissenting votes.\u00a0<\/p>\n<p style=\"text-align: left;\">City Council members said that if the project isn\u2019t done now, there is potential for environmental impacts such as declining aquifer levels to worsen.\u00a0<\/p>\n<p>                        <img loading=\"lazy\" decoding=\"async\" src=\"data:image\/png;base64,iVBORw0KGgoAAAANSUhEUgAAAAQAAAADCAQAAAAe\/WZNAAAAEElEQVR42mM8U88ABowYDABAxQPltt5zqAAAAABJRU5ErkJggg==\" alt=\"Residents line walls at Cape Coral utility hearing\" class=\"img-responsive lazyload full blur\" width=\"1200\" height=\"676\" data- data-\/><\/p>\n<p>             <img decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2026\/09\/6abc03e1abf7c.image.jpg\" alt=\"\" aria-hidden=\"true\" loading=\"lazy\" height=\"113\" width=\"200\"\/><\/p>\n<p>Residents stand along the walls of Cape Coral City Council chambers during a Sept. 28 hearing on the North 3 Utility Expansion Project. The standing-room-only meeting lasted about five hours as residents raised concerns about the cost of the mandatory utility hookups.<\/p>\n<p>                                    Evan Williams<\/p>\n<p style=\"text-align: left;\">During a public comment period that was extended beyond its usual 60-minute limit, speakers lined up to take their three-minute turn at the dais. Many expressed sticker shock, raising concerns that residents would be priced out of their homes.\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"Residents fill Cape Coral City Council chambers Sept. 28 for a public hearing on the North 3 Utility&hellip;\n","protected":false},"author":2,"featured_media":414176,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[209,211,210,113922,164079,164077,164078],"class_list":["post-414175","post","type-post","status-publish","format-standard","has-post-thumbnail","category-cape-coral","tag-cape-coral","tag-cape-coral-headlines","tag-cape-coral-news","tag-septic-system","tag-sewer-hookup","tag-utility-expansion-project","tag-water-hookup"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/414175","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/comments?post=414175"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/414175\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media\/414176"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media?parent=414175"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/categories?post=414175"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/tags?post=414175"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}