{"id":428671,"date":"2026-10-15T16:48:07","date_gmt":"2026-10-15T16:48:07","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-fl\/428671\/"},"modified":"2026-10-15T16:48:07","modified_gmt":"2026-10-15T16:48:07","slug":"former-office-building-to-become-self-storage-facility-in-the-skyway-marina-district","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-fl\/428671\/","title":{"rendered":"Former office building to become self storage facility in the Skyway Marina District"},"content":{"rendered":"<p class=\"\" style=\"white-space:pre-wrap;\">Called <a href=\"https:\/\/www.centro-storage.com\" target=\"_blank\" rel=\"nofollow noopener\">Centro Storage<\/a>, the facility is expected to include 858 climate-controlled units and be completed in 2028.<\/p>\n<p class=\"\" style=\"white-space:pre-wrap;\">\u201cThird Lake is a pleasure to work with. Their team is professional and highly capable, and we look forward to Centro Storage becoming part of the Sky Town community. It will offer a high-quality product and a valuable amenity for our apartment residents,\u201d Frank Guerra, founder and principal of Altis Cardinal, said in a conversation with St. Pete Rising.<\/p>\n<p class=\"\" style=\"white-space:pre-wrap;\">Centro Storage is expected to offer units ranging from 5-by-5 feet to 10-by-30 feet, with gated access and personalized keypad entry. <\/p>\n<p class=\"\" style=\"white-space:pre-wrap;\">The development team includes general contractor <a href=\"https:\/\/www.elmbuilders.com\/\" target=\"_blank\" rel=\"nofollow noopener\">Elm Builders<\/a>, engineering firms <a href=\"https:\/\/www.stantec.com\/en\" target=\"_blank\" rel=\"nofollow noopener\">Stantec<\/a> and <a href=\"https:\/\/www.bniengineers.com\/\" target=\"_blank\" rel=\"nofollow noopener\">Bliss &amp; Nyitray, Inc.<\/a>, and Bradenton-based <a href=\"https:\/\/www.designhaus.com\/\" target=\"_blank\" rel=\"nofollow noopener\">Designhaus Architecture<\/a>. <\/p>\n<p class=\"\" style=\"white-space:pre-wrap;\">Third Lake expects to begin construction soon.<\/p>\n","protected":false},"excerpt":{"rendered":"Called Centro Storage, the facility is expected to include 858 climate-controlled units and be completed in 2028. \u201cThird&hellip;\n","protected":false},"author":2,"featured_media":428672,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[202,204,203,199,201,200],"class_list":["post-428671","post","type-post","status-publish","format-standard","has-post-thumbnail","category-st-petersburg","tag-st-pete","tag-st-pete-headlines","tag-st-pete-news","tag-st-petersburg","tag-st-petersburg-headlines","tag-st-petersburg-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/428671","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/comments?post=428671"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/428671\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media\/428672"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media?parent=428671"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/categories?post=428671"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/tags?post=428671"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}