{"id":51273,"date":"2025-11-18T14:45:07","date_gmt":"2025-11-18T14:45:07","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-fl\/51273\/"},"modified":"2025-11-18T14:45:07","modified_gmt":"2025-11-18T14:45:07","slug":"orlando-international-airport-begins-major-tram-replacement-project-connecting-terminals-a-and-b-to-airside-gates","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-fl\/51273\/","title":{"rendered":"Orlando International Airport Begins Major Tram Replacement Project Connecting Terminals A and B to Airside Gates"},"content":{"rendered":"<p>Orlando International Airport is preparing for a major upgrade that will change how you move through MCO starting December 3, 2025. The airport will begin the Gate Link Replacement Project, a $253 million overhaul aimed at creating a smoother and faster connection between the main terminal and the gate areas.<\/p>\n<p>The project replaces the aging Gate Link system with new Mitsubishi tram vehicles and a full rebuild of the supporting infrastructure. This work is part of GOAA&#8217;s larger 2025-2030 Capital Improvement Program, which includes $5.9 billion in airport upgrades.<\/p>\n<p>What&#8217;s Changing<\/p>\n<p>MCO will replace the current Gate Link system serving Gates 70-129 on Airside 2 and Airside 4. The updated system will include four new Mitsubishi vehicles, similar to those added in 2017 for Airsides 1 and 3.<\/p>\n<p>Along with new vehicles, crews will rebuild the full system that keeps Gate Link running:<\/p>\n<p>&#13;<br \/>\nNew running surfaces&#13;<br \/>\nUpgraded traction systems&#13;<br \/>\nUpdated power distribution&#13;<br \/>\nModern vehicle controls and communication networks&#13;<br \/>\nNew platform screen doors at boarding areas&#13;<\/p>\n<p>These upgrades aim to improve reliability, safety, and long-term performance. The technology also supports better energy efficiency.<\/p>\n<p>GOAA CEO Lance Lyttle said the upgrade will &#8220;enhance safety and ensure our Gate Link system serves passengers reliably for decades to come.&#8221;<\/p>\n<p>Timeline and Travel Impact<\/p>\n<p>Work runs from December 2025 through Fall 2027. To keep the airport moving, the project will unfold in phases, with one tram remaining in operation for most of the construction period.<\/p>\n<p>Here&#8217;s what you can expect:<\/p>\n<p>&#13;<br \/>\nA few extra minutes added to the journey between the terminal and the airsides.&#13;<br \/>\nOccasional use of shuttle buses, mostly overnight.&#13;<br \/>\nRental car and ground transportation users should add 30 minutes to pickup planning.&#13;<br \/>\nAdditional guest service ambassadors and new wayfinding signage to help direct travelers.&#13;<\/p>\n<p>MCO reminds travelers to follow the 3-2-1 rule:\u00a03 hours before departure at ticketing, 2 hours at security, and 1 hour at your gate.<\/p>\n<p>The Gate Link Replacement Project is one piece of a much larger modernization effort across Orlando International Airport. GOAA&#8217;s 2025-2030 Capital Improvement Program includes:<\/p>\n<p>&#13;<br \/>\nMore parking capacity&#13;<br \/>\nExpanded baggage handling&#13;<br \/>\nNew and upgraded gate areas&#13;<br \/>\nTerminal A and B upgrades&#13;<br \/>\nRenovated restrooms and seating areas&#13;<br \/>\nAdded retail and dining&#13;<br \/>\nImproved technology and wayfinding&#13;<\/p>\n<p>                         Get Walt Disney World News Delivered to Your Inbox<\/p>\n","protected":false},"excerpt":{"rendered":"Orlando International Airport is preparing for a major upgrade that will change how you move through MCO starting&hellip;\n","protected":false},"author":2,"featured_media":36754,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[115,139,141,32454,140],"class_list":{"0":"post-51273","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-orlando","8":"tag-news","9":"tag-orlando","10":"tag-orlando-headlines","11":"tag-orlando-international-airport-begins-major-tram-replacement-project-connecting-terminals-a-and-b-to-airside-gates","12":"tag-orlando-news"},"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/51273","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/comments?post=51273"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/51273\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media\/36754"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media?parent=51273"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/categories?post=51273"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/tags?post=51273"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}