{"id":61577,"date":"2025-11-26T15:05:08","date_gmt":"2025-11-26T15:05:08","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-fl\/61577\/"},"modified":"2025-11-26T15:05:08","modified_gmt":"2025-11-26T15:05:08","slug":"utampa-moves-ahead-with-new-riverfront-science-building","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-fl\/61577\/","title":{"rendered":"UTampa moves ahead with new riverfront science building"},"content":{"rendered":"<p>The University of Tampa is getting ready for another major upgrade. <a href=\"https:\/\/floridiandevelopment.com\/university-of-tampas-new-science-building-moves-forward-with-permits-filed-and-approvals-granted\/\" rel=\"nofollow noopener\" target=\"_blank\">New permits and approvals<\/a> are in place for a six-story science <a href=\"https:\/\/tbbwmag.com\/category\/infrastructure-development\/\" rel=\"nofollow noopener\" target=\"_blank\">building<\/a> that will sit along the Hillsborough River. <\/p>\n<p>It is called Project Beta, and it will replace a group of older buildings at 505 UT McNeel Ct.<\/p>\n<p>UTampa has not said when work will start, but once it does, the contractor expects the project to take about 18 months. <\/p>\n<p>Several buildings on the site will come down first, including the Cass Science Annex and the McNeal Boathouse.<\/p>\n<p>READ: <a href=\"http:\/\/6 story luxury student housing project breaks ground near USF\" rel=\"nofollow\">6 story luxury student housing project breaks ground near USF<\/a><\/p>\n<p>A big step for UTampa\u2019s science programs<\/p>\n<p>The new building will be about 200,000 square feet. It will include research labs, teaching spaces and areas where students and faculty can work together. <\/p>\n<p>HDR Architects is designing it to meet LEED Silver, which means the building should use less energy and support better air quality.<\/p>\n<p>The building\u2019s look mixes old and new. The west side will have red brick to match the rest of the campus. The east side will have more glass and face the river. It will stand 120 feet tall. <\/p>\n<p><a href=\"https:\/\/tbbwmag.com\/?attachment_id=88615\" target=\"_blank\" rel=\"nofollow noopener\"><img decoding=\"async\" alt=\"River side view of UTampa\u2019s new science building with tall glass panels.\" width=\"728\" height=\"410\" loading=\"lazy\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2025\/11\/THUMBNAIL-2-728x410.jpeg\"  \/><\/a><\/p>\n<p>The east side of the building faces the river and features tall glass panels that bring in natural light.<\/p>\n<p><a href=\"https:\/\/tbbwmag.com\/?attachment_id=88614\" target=\"_blank\" rel=\"nofollow noopener\"><img decoding=\"async\" alt=\"Front view of UTampa\u2019s new science and research building with brick and glass.\" width=\"728\" height=\"410\" loading=\"lazy\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2025\/11\/THUMBNAIL-3-728x410.jpeg\"  \/><\/a><\/p>\n<p>A front view of the science and research building shows the mix of brick and glass used in the design.<\/p>\n<p><a href=\"https:\/\/tbbwmag.com\/?attachment_id=88610\" target=\"_blank\" rel=\"nofollow noopener\"><img decoding=\"async\" alt=\"\" width=\"728\" height=\"410\" loading=\"lazy\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2025\/11\/THUMBNAIL-7-728x410.jpeg\"  \/><\/a><\/p>\n<p><a href=\"https:\/\/tbbwmag.com\/2023\/12\/18\/university-of-tampa-names-next-president\/\" rel=\"nofollow noopener\" target=\"_blank\">UTampa<\/a> does not plan to add new parking since the campus already has enough.<\/p>\n<p>Construction plans are moving forward<\/p>\n<p><a href=\"https:\/\/www.barrandbarr.com\/university-of-tampa-new-science-building\/\" rel=\"nofollow noopener\" target=\"_blank\">Barr and Barr<\/a> will build the project. Recent filings show a general construction permit that covers demolition and new construction. There is also a permit for tree work on the site.<\/p>\n<p>READ: <a href=\"https:\/\/tbbwmag.com\/\" rel=\"nofollow noopener\" target=\"_blank\">Tampa hotels launch Plates with Purpose to fight food insecurity<\/a><\/p>\n<p>This project comes right after <a href=\"https:\/\/tbbwmag.com\/tag\/university-of-tampa\/\" rel=\"nofollow noopener\" target=\"_blank\">UTampa<\/a> opened the <a href=\"https:\/\/www.ut.edu\/about-utampa\/university-services\/office-of-communications-and-public-affairs\/campus-construction\" rel=\"nofollow noopener\" target=\"_blank\">Grand Center Residence Hall<\/a>. That building added housing, classrooms and new space for students at a time when enrollment is higher than ever.<\/p>\n<p>Why it matters<\/p>\n<p><a href=\"https:\/\/tbbwmag.com\/category\/education-2\/\" rel=\"nofollow noopener\" target=\"_blank\">UTampa<\/a> continues to grow, and it needs more space for science and research programs. <\/p>\n<p>This new building provides students with better labs and more space to learn. It also continues the steady build-out of UTampa\u2019s riverfront campus, which has helped shape the look and feel of downtown Tampa.<\/p>\n<p><a href=\"https:\/\/tbbwmag.com\/?attachment_id=88608\" target=\"_blank\" rel=\"nofollow noopener\"><img decoding=\"async\" alt=\"Exterior view of UTampa\u2019s new science building facing the river with glass walls and red brick.\" width=\"728\" height=\"410\" loading=\"lazy\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2025\/11\/THUMBNAIL-9-728x410.jpeg\"  \/><\/a><\/p>\n<p>A rendering shows the riverfront side of UTampa\u2019s new science building with glass panels and red brick.<\/p>\n<p><a href=\"https:\/\/tbbwmag.com\/?attachment_id=88611\" target=\"_blank\" rel=\"nofollow noopener\"><img decoding=\"async\" alt=\"Interior hallway with study tables and lab entrances in UTampa\u2019s new science building.\" width=\"728\" height=\"410\" loading=\"lazy\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2025\/11\/THUMBNAIL-6-728x410.jpeg\"  \/><\/a><\/p>\n<p>Inside the new building students will find bright hallways, study spaces and updated lab entrances.<\/p>\n<p><a href=\"https:\/\/tbbwmag.com\/?attachment_id=88612\" target=\"_blank\" rel=\"nofollow noopener\"><img decoding=\"async\" alt=\"Stair seating area and large wall mural inside UTampa\u2019s new science building.\" width=\"728\" height=\"410\" loading=\"lazy\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2025\/11\/THUMBNAIL-5-728x410.jpeg\"  \/><\/a><\/p>\n<p>A central staircase with built in seating creates a casual spot for students to study or meet.<\/p>\n<p><a href=\"https:\/\/tbbwmag.com\/?attachment_id=88613\" target=\"_blank\" rel=\"nofollow noopener\"><img decoding=\"async\" alt=\"Lobby and seating area inside UTampa\u2019s new science building with wood details and a digital screen.\" width=\"728\" height=\"410\" loading=\"lazy\" src=\"https:\/\/www.newsbeep.com\/us-fl\/wp-content\/uploads\/2025\/11\/THUMBNAIL-4-728x410.jpeg\"  \/><\/a><\/p>\n<p>The lobby includes warm wood details and seating areas designed for students to gather.<\/p>\n<p>Stay Connected<\/p>\n<p><a href=\"https:\/\/tbbwmag.com\/subscribe\/\" rel=\"nofollow noopener\" target=\"_blank\">Sign up for TBBW\u2019s newsletter<\/a><\/p>\n<p><a href=\"https:\/\/www.youtube.com\/@tampabaybusinesswealthmaga9682\" rel=\"nofollow noopener\" target=\"_blank\">Watch TBBW\u2019s Podcast<\/a><\/p>\n<p><a href=\"https:\/\/linktr.ee\/TBBWmag\" rel=\"nofollow noopener\" target=\"_blank\">Follow TBBW on Social Media<\/a><\/p>\n<p><a href=\"https:\/\/tbbwmag.com\/\" rel=\"nofollow noopener\" target=\"_blank\">Read More TBBW stories<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"The University of Tampa is getting ready for another major upgrade. New permits and approvals are in place&hellip;\n","protected":false},"author":2,"featured_media":61578,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[1127,2152,113,276,3741,480,135,1703,137,136,278,37150],"class_list":["post-61577","post","type-post","status-publish","format-standard","has-post-thumbnail","category-tampa","tag-construction","tag-development","tag-education","tag-hillsborough-county","tag-infrastructure","tag-real-estate","tag-tampa","tag-tampa-bay-business","tag-tampa-headlines","tag-tampa-news","tag-top-stories","tag-university-of-tampa"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/61577","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/comments?post=61577"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/61577\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media\/61578"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media?parent=61577"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/categories?post=61577"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/tags?post=61577"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}