{"id":87364,"date":"2025-12-17T23:44:06","date_gmt":"2025-12-17T23:44:06","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-fl\/87364\/"},"modified":"2025-12-17T23:44:06","modified_gmt":"2025-12-17T23:44:06","slug":"tampa-unveils-completed-upgrades-to-decades-old-bayshore-wastewater-pump-station","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-fl\/87364\/","title":{"rendered":"Tampa unveils completed upgrades to decades-old Bayshore wastewater pump station"},"content":{"rendered":"<p>Officials say the improvements are designed to reduce flooding risks as the city grows and storms become more intense.<\/p>\n<p>TAMPA, Fla. \u2014 Tampa leaders on Tuesday unveiled completed upgrades to one of the city&#8217;s oldest and most critical wastewater pumping stations, offering a tour of improvements officials say are designed to reduce flooding risks as the city grows and storms become more intense.<\/p>\n<p>The Bayshore Wastewater Pumping Station, originally built in 1955, has quietly operated beneath South Tampa for nearly 70 years.\u00a0<\/p>\n<p>Mayor Jane Castor said the facility now runs nonstop, \u201c24 hours a day, seven days a week,\u201d processing about 3 million gallons of wastewater daily, adding that \u201cto say that it is working hard is quite an understatement.\u201d<\/p>\n<p>The $17 million rehabilitation is already fully operational and is part of Tampa\u2019s $2.9 billion Progressive Infrastructure Planning to Ensure Sustainability, or PIPES, program, approved by city council in 2019.\u00a0<\/p>\n<p>Castor said the plan was created to replace aging water and wastewater pipes, some more than 80 years old.<\/p>\n<p>\u201cAs we grow, we continue to develop very successfully in our city,\u201d Castor said. \u201cA successful city is built on a strong foundation \u2014 a strong infrastructure. The pipes, the roadways, all of the elements that really make this a great city.\u201d<\/p>\n<p>Castor noted that many of Tampa\u2019s pumping stations date back to the 1950s and were long overdue for upgrades. \u201cSo much of it is overdue for upgrading,\u201d she said. \u201cAnd this particular pump station was one of those.\u201d<\/p>\n<p>For decades, much of the Bayshore station\u2019s electrical equipment sat below ground \u2014 a standard engineering practice at the time but one that left the facility especially vulnerable to flooding and storm surge from nearby Hillsborough Bay.<\/p>\n<p>Tampa wastewater director Eric Weiss said the station\u2019s original design reflected the standards of its era.\u00a0<\/p>\n<p>\u201cIt was built in 1955,\u201d Weiss said. \u201cIt was standard engineering practice at that time to install all of the electrical equipment below grade in a basement of the pumping station. And as you can see, where we are located next to Hillsborough Bay, we are susceptible to storm surge and hurricane impacts.\u201d<\/p>\n<p>During Tuesday\u2019s tour, city officials highlighted how those vulnerabilities have now been addressed.<\/p>\n<p>The station has been converted to a modern submersible pumping system and expanded from two pumps to four.\u00a0<\/p>\n<p>Weiss said the additional pumps do not dramatically increase capacity but instead improve reliability.\u00a0<\/p>\n<p>\u201cIt has nominally increased the capacity,\u201d he said, \u201cbut it\u2019s more for just resilience and sustainability.\u201d<\/p>\n<p>Electrical systems have been relocated into a new building elevated above ground and protected by reinforced concrete.\u00a0<\/p>\n<p>Weiss said city crews took \u201call of that electrical gear below grade in the basement and put it up in a new building above ground,\u201d adding that the structure is surrounded by \u201ca 10-foot-tall, one-foot-thick concrete reinforcement wall designed to withstand storm surge and hurricane-force winds.\u201d<\/p>\n<p>Backup power was another major focus of the project.\u00a0<\/p>\n<p>Weiss said the new standby generator includes a large fuel tank capable of keeping the station running \u201cfor up to three days without TECO before refueling,\u201d ensuring wastewater service continues even during extended outages.<\/p>\n<p>Mayor Castor said those changes were shaped by lessons learned from hurricanes Helene and Milton.\u00a0<\/p>\n<p>\u201cAfter we went through Helene and Milton, we really made a concerted effort to lift a lot of our electrical systems up above any of the hurricane lines,\u201d she said.<\/p>\n<p>City officials say the upgrades are especially important as development increases throughout South Tampa, adding runoff and heightening flood concerns near Bayshore Boulevard.<\/p>\n<p>Some neighbors expressed strong confidence in the improvements.<\/p>\n<p>\u201cMy feeling is that they\u2019ve done an excellent job,\u201d said nearby resident Vinod Shah. \u201cMy level of confidence is extremely high.\u201d\u00a0<\/p>\n<p>Shah said the upgrades should help when storms approach and water levels rise.\u00a0<\/p>\n<p>\u201cWhen unknown storms are coming, and we get high water from Hillsborough Bay, obviously this new construction will help a lot of people,\u201d he said, adding that it \u201cwill also reduce the flooding in many areas.\u201d Shah said he is \u201c100% confident in the skill and talent of all the Tampa municipal and other people.\u201d<\/p>\n<p>Other residents said they remain hopeful \u2014 but cautious.<\/p>\n<p>\u201cBayshore is always flooded,\u201d said June Kittay, noting that it often happens even without heavy rain. \u201cYou have to be very careful when you\u2019re driving down the street. It doesn\u2019t even have to be a substantial amount of rain \u2014 just a small amount.\u201d<\/p>\n<p>Kittay said she hopes the upgrades will help but wants to see how they perform during the next major storm.\u00a0<\/p>\n<p>\u201cHopefully this will alleviate it,\u201d she said. \u201cWell, you never know, but I have faith that we have good contractors in the city that will make sure that it works.\u201d\u00a0<\/p>\n<p>Still, she added, \u201cThe proof is in the pudding. The first time that we have any substantial flooding or rain, we\u2019ll see how it works. I\u2019m hopeful \u2014 we\u2019re going to wait and see.\u201d<\/p>\n<p>City officials said the Bayshore station serves a wide swath of South Tampa \u2014 from Bay to Bay Boulevard north and then south to Interbay, stretching west toward Dale Mabry Highway and east to Bayshore Boulevard.<\/p>\n<p>They emphasized that the project is already fully online, even if it may be months before it is tested by major storms during the dry season.<\/p>\n<p>Castor said the Bayshore project is one of 34 similar projects underway and noted that since the PIPES program passed, the city has invested approximately $730 million in its wastewater system, not including water infrastructure.<\/p>\n","protected":false},"excerpt":{"rendered":"Officials say the improvements are designed to reduce flooding risks as the city grows and storms become more&hellip;\n","protected":false},"author":2,"featured_media":87365,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[135,137,136],"class_list":["post-87364","post","type-post","status-publish","format-standard","has-post-thumbnail","category-tampa","tag-tampa","tag-tampa-headlines","tag-tampa-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/87364","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/comments?post=87364"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/posts\/87364\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media\/87365"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/media?parent=87364"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/categories?post=87364"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-fl\/wp-json\/wp\/v2\/tags?post=87364"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}