{"id":15392,"date":"2025-10-24T20:07:07","date_gmt":"2025-10-24T20:07:07","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ny\/15392\/"},"modified":"2025-10-24T20:07:07","modified_gmt":"2025-10-24T20:07:07","slug":"developer-terminates-plans-for-massive-300m-staten-island-battery-energy-storage-system","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ny\/15392\/","title":{"rendered":"Developer terminates plans for massive $300M Staten Island battery energy storage system"},"content":{"rendered":"<p class=\"article__paragraph article__paragraph--left\" id=\"DV45UY6MYZDB5CXWSZEJMEVRTY\">STATEN ISLAND, N.Y. \u2014 Plans to construct an eight-acre battery energy storage system on a busy strip of Victory Boulevard in Travis have been officially scrapped, according to government records. A notice of project termination has been filed with the New York State Department of Public Service, the agency that regulates electric, gas, steam, telecommunications\/cable, and private water utilities in New York.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"PCZQ7WGGK5C5LK3NSHAMQ5AZZY\">\u201cBy this letter, we, on behalf of Petitioner, hereby notify the Commission that plans to construct the BESS have been terminated,\u201d noted the correspondence from Steven D. Wilson of Young\/Sommer LLC, the attorneys representing the project\u2019s developers. \u201cAs of the date of this letter, no part of the BESS has been constructed.\u201d<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"AJPGCKBA7ZCLPCWJKOSA2EPB64\">No reason for termination was given, and Wilson did not respond to a request for comment. Hecate Energy, a utility-scale energy storage operator that announced intentions for the $300 million project in 2023, also did not reply to inquiries from the Advance\/SILive.com.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"J6O4DTXZFNALRGGE5RTRWX5PQQ\">Called Swiftsure, <a href=\"https:\/\/www.silive.com\/news\/2023\/08\/2-lithium-ion-battery-sites-planned-for-victory-boulevard-located-just-a-half-mile-apart-records-show.html\" target=\"_blank\" rel=\"nofollow noopener\">Hecate Energy\u2019s proposed battery storage system was billed in promotional materials as \u201cone of the largest in the nation,\u201d capable of storing enough energy to power 500,000 homes<\/a>. It was slated for construction at 3861 Victory Blvd. on the site of a large tract of vacant land located within an M1-1 zoning district \u2014 a multiple use area containing manufacturing, commercial, and community facilities \u2014 so no zoning actions were required to facilitate its construction.<\/p>\n<p><img fetchpriority=\"low\" loading=\"lazy\" decoding=\"async\" alt=\"Travis residents protest proposed battery energy storage site\" class=\"hero-image\" src=\"https:\/\/www.newsbeep.com\/us-ny\/wp-content\/uploads\/2025\/10\/M53BVCJUGNFKNJYFORGB45YVJQ.jpg\"\/>Dozens of Travis residents line up along Victory Blvd. to protest the battery energy storage system this summer. (Advance\/SILive | Jessica Jones-<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"GSZZFB5CYFAHFARN2FY6Y2VX4I\">The property is near many local businesses and homes, making it a concern for residents and political leaders who rallied against the project several times this summer. <\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"TPYSDI2KXBD53CGARWP7VTV3HY\">According to public records, Hecate applied for a Certificate of Public Convenience and Necessity from the Public Service Commission in 2024, which was approved and granted the company a significantly reduced regulatory burden compared to traditional public utilities. In exchange, Hecate was required to demonstrate timely compliance with critical safeguards, including the submission of a comprehensive decommissioning plan and cost estimate to ensure the facility could be responsibly dismantled at the end of its lifespan. <\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"3SALZWDCXVBGLBX3YWBCV5B5QU\">But Hecate Energy missed its deadline to submit those legally required plans by more than 200 days. <a href=\"https:\/\/www.silive.com\/news\/2025\/05\/ny-officials-deny-extension-for-staten-island-battery-storage-project.html\" target=\"_blank\" rel=\"nofollow noopener\">In April, the company sought an extension from the New York State Public Service Commission, but was denied<\/a>.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"BY7FPBJ7KZDTVMMYW72BTK4IPE\">In a letter dated Aug. 1, 2025, and posted to the project\u2019s online case file, general counsel for the New York State Department of Public Service gave Hecate a deadline of Oct. 11, 2025, to produce the outstanding decommissioning filings \u201cor else be subject to potential enforcement proceedings and the imposition of fines.\u201d<\/p>\n<p><img fetchpriority=\"low\" loading=\"lazy\" decoding=\"async\" alt=\"Travis residents protest proposed battery energy storage site\" class=\"hero-image\" src=\"https:\/\/www.newsbeep.com\/us-ny\/wp-content\/uploads\/2025\/10\/FEGLGKNQMJH7DPX7H2VBHMBF5I.jpg\"\/>Staten Islanders are seen at a rally to voice  their concerns over the battery energy storage system proposed for Travis.(Advance\/SILive | Jessica Jones-<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"GLFKSQ3AMBA35EBB2OX7MPWHZA\">Hecate issued its notice of project termination a little more than two weeks later, on Aug. 18, 2025. <\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"KX2RJFMAZFAKBLWEGFKHSPARYI\">\u201cThis is a tremendous victory for the people of Staten Island,\u201d Assemblyman Sam Pirozzolo, a Republican serving the Mid-Island, noted in a press release. \u201cFrom the moment we were first alerted to this ridiculous project, residents raised legitimate concerns about the risks these large-scale battery sites pose to nearby homes, schools and critical infrastructure. Their persistence, organization and advocacy made all the difference.\u201d<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"4VHNRMBUCFENTEAGDISGOXVLYU\">Borough President Vito Fossella added: <\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"2KJB76OLYVABNOO6IOWQW7O6AQ\">\u201cWe are gratified that the lithium-ion battery storage site planned for 3861 Victory Boulevard in the Travis section has been terminated. The facility was slated to be one of the largest BESS facilities in the entire nation \u2026 this is a victory for common sense and for the people of Staten Island, especially the residents of Travis. We will continue to fight against these units that threaten the quality of life and the safety of residents across the Island.\u201d <\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"76ZFI3IF2FE7TL25LHU7BVDAT4\">A technology that uses a group of batteries to store electrical energy, allowing the energy to be released later when needed, the storage system sites \u2014 commonly referred to as BESS \u2014 essentially act as backup power sources for homes or the grid, particularly during peak demand or power outages. They are often used in conjunction with renewable energy sources like solar power.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"FPEXW5GABRGN3PLJTOXFFGF4OA\">Developers and green energy proponents tout the lithium-ion structures \u2014 <a href=\"https:\/\/www.silive.com\/business\/2022\/11\/back-up-energy-site-coming-to-staten-island-how-will-it-be-used-support-the-boroughs-electrical-grid.html\" target=\"_blank\" rel=\"nofollow noopener\">which started popping up in several NYC neighborhoods<\/a> in 2022 \u2014 as quiet neighbors that are a necessary agent for renewable change. They are designed to remove pressure from the city\u2019s stressed grid, using rechargeable batteries to store electrical energy from various sources, and then releasing that stored energy when needed.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"3E6H6BWOHZHVZJHSBKDP5QMBEE\">But over the past two years, borough residents and local officials have voiced their concerns about their siting. <a href=\"https:\/\/www.silive.com\/news\/2023\/01\/islanders-ask-are-lithium-ion-battery-storage-facilities-safe.html\" target=\"_blank\" rel=\"nofollow noopener\">Community Boards voted against their proximity to bakeries<\/a> and storefronts and <a href=\"https:\/\/www.silive.com\/business\/2022\/11\/back-up-energy-site-coming-to-staten-island-how-will-it-be-used-support-the-boroughs-electrical-grid.html\" target=\"_blank\" rel=\"nofollow noopener\">elected officials issued a moratorium<\/a> on applications filed within residential districts. In one instance, <a href=\"https:\/\/www.silive.com\/business\/2023\/01\/plans-withdrawn-for-community-opposed-lithium-ion-battery-storage-system-on-staten-island.html\" target=\"_blank\" rel=\"nofollow noopener\">an energy developer retracted plans to place batteries in a Bulls Head church parking lot<\/a>.<\/p>\n<p>If you purchase a product or register for an account through a link on our site, we may receive compensation. By using this site, you consent to our <a href=\"https:\/\/www.advancelocal.com\/advancelocalUserAgreement\/user-agreement.html\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">User Agreement<\/a> and agree that your clicks, interactions, and personal information may be collected, recorded, and\/or stored by us and social media and other third-party partners in accordance with our <a href=\"https:\/\/www.advancelocal.com\/advancelocalUserAgreement\/privacy-policy.html\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">Privacy Policy.<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"STATEN ISLAND, N.Y. \u2014 Plans to construct an eight-acre battery energy storage system on a busy strip of&hellip;\n","protected":false},"author":2,"featured_media":15393,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[9,24,63,134,136,135],"class_list":["post-15392","post","type-post","status-publish","format-standard","has-post-thumbnail","category-staten-island","tag-new-york","tag-new-york-city","tag-nyc","tag-staten-island","tag-staten-island-headlines","tag-staten-island-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/posts\/15392","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/comments?post=15392"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/posts\/15392\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/media\/15393"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/media?parent=15392"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/categories?post=15392"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/tags?post=15392"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}