{"id":288917,"date":"2026-07-07T08:33:09","date_gmt":"2026-07-07T08:33:09","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ny\/288917\/"},"modified":"2026-07-07T08:33:09","modified_gmt":"2026-07-07T08:33:09","slug":"brooklyn-subway-accessibility-upgrades-move-to-rfp","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ny\/288917\/","title":{"rendered":"Brooklyn subway accessibility upgrades move to RFP"},"content":{"rendered":"<p>Brooklyn subway accessibility upgrades have entered procurement at five stations, with the Metropolitan Transportation Authority planning new elevators and related station work funded through congestion pricing revenue.<\/p>\n<p><a href=\"https:\/\/www.railway.supply\/brooklyn-subway-accessibility-upgrades-enter-rfp-stage\/img_3629\/\" rel=\"attachment wp-att-183096 nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-183096 size-full\" title=\"Accessible MTA subway station elevator\" src=\"https:\/\/www.newsbeep.com\/us-ny\/wp-content\/uploads\/2026\/07\/img_3629.webp\" alt=\"Accessible subway station elevator in Brooklyn\" width=\"1200\" height=\"830\"  \/><\/a>Illustrative photo of an accessible MTA subway station elevator in Brooklyn. Photo: Marc A. Hermann \/ MTA \/ CC BY 4.0<br \/>\nMTA opens RFP for Brooklyn subway accessibility upgrades<\/p>\n<p>The agency has issued a <a href=\"https:\/\/www.mta.info\/press-release\/mta-announces-five-brooklyn-subway-stations-be-made-accessible-enabled-congestion\" rel=\"nofollow noopener\" target=\"_blank\">Request for Proposals<\/a>\u2060 for a design-builder to carry out the upgrades. Qualified firms have until Sept. 14 to submit proposals, and the MTA plans to award the design-build contract by the end of the year.<\/p>\n<p>The five-station package covers Neptune Av on the F line, 18 Av on the N line, Jefferson St on the L line, Nostrand Av on the A and C lines, and Fort Hamilton Pkwy on the D line. The planned elevator additions include one at Neptune Av, two at 18 Av, two at Jefferson St, three at Nostrand Av, and two at Fort Hamilton Pkwy.<\/p>\n<p>The project also covers platform repairs, fare-control improvements, staircase replacements, and security and safety upgrades across the five stations.<\/p>\n<p>According to the MTA, the stations were selected to improve the geographic distribution of accessible stops across the subway system. Fort Hamilton Pkwy, 18 Av, Jefferson St, and Neptune Av were chosen because each addresses a gap of four consecutive inaccessible stations on its respective line. Nostrand Av was selected as a busy express station serving a major commercial area, and the accessibility work complements the reopening of the Bedford Avenue entrance at that station.<\/p>\n<p>Congestion pricing funding supports station work<\/p>\n<p>The work is being made possible by <a href=\"https:\/\/www.mta.info\/agency\/bridges-and-tunnels\/congestion-relief-zone\/better-transit\" rel=\"nofollow noopener\" target=\"_blank\">congestion pricing funding<\/a>\u2060, which is providing $15 billion for the MTA\u2019s 2020-2024 Capital Plan. That funding supports projects to rebuild, improve, and expand New York\u2019s transit system. The five Brooklyn stations join 20 other stations already slated for accessibility improvements enabled by congestion pricing funding.<\/p>\n<p>MTA Chair and CEO Janno Lieber said:<\/p>\n<p>\u201cWondering what congestion relief revenues are paying for? Well, here\u2019s another five accessible subway stations to add to the list,\u201d<\/p>\n<p>\u201cDrivers are appreciating speedier crossings and reduced congestion since the toll program started, but everyone is glad the air is cleaner, streets are safer, and our mass transit system is getting major upgrades.\u201d<\/p>\n<p>MTA Construction &amp; Development President Jamie Torres Springer said:<\/p>\n<p>\u201cThe benefits of congestion pricing add up more every day: air quality is improving and traffic is down\u2014all while generating billions of dollars to improve the transit system New Yorkers rely on,\u201d<\/p>\n<p>\u201cThese accessibility upgrades will be transformative for Brooklyn riders, and they\u2019re exactly the kind of work congestion pricing allows us to deliver better, faster, and cheaper.\u201d<\/p>\n<p>New York City Transit President Demetrius Crichlow said:<\/p>\n<p>\u201cThousands of Brooklyn riders will have new opportunities to use our system with these accessibility and station improvements,\u201d<\/p>\n<p>\u201cEnsuring every New Yorker has access to safe and reliable transit remains a top priority for NYC Transit.\u201d<\/p>\n<p>MTA Chief Accessibility Officer Quemuel Arroyo said:<\/p>\n<p>\u201cThe MTA is improving access for all our customers especially for riders with mobility needs, parents and caregivers with children on strollers, aging adults, and anyone with access needs like bags or luggage,\u201d<\/p>\n<p>\u201cWith these five stations we are getting that much closer to delivering a completely accessible transit system for all.\u201d<\/p>\n<p>Don\u2019t miss\u2026<a href=\"https:\/\/www.railway.supply\/stadler-salt-lake-city-expansion-opens-in-utah\/\" rel=\"nofollow noopener\" target=\"_blank\">Stadler Salt Lake City expansion opens in Utah<\/a><\/p>\n<p>MTA plans more ADA-accessible stations<\/p>\n<p>The MTA said the subway system currently has 160 fully accessible stations, including 60 completed since 2020. The announcement was made as the authority marks Disability Pride Month in July with events and announcements highlighting work underway to build a transit system that works for everyone.<\/p>\n<p>In its 2025-2029 Capital Plan, the MTA is also committing nearly $7.1 billion to <a href=\"https:\/\/www.mta.info\/project\/station-accessibility-upgrades\" rel=\"nofollow noopener\" target=\"_blank\">station accessibility<\/a>\u2060. The programme is intended to make 60 more stations newly ADA-accessible and modernize another 45 subway elevators.<\/p>\n<p>What will change for passengers?<\/p>\n<p>The five Brooklyn stations are part of a wider MTA accessibility programme, not a standalone elevator package. The authority says a 2022 agreement with accessibility advocates set a path to provide ADA access at 95% of stations by 2055. It also says the 2025-2029 Capital Program would make more than two-thirds of all subway rides take place to or from accessible stations by the time the plan is complete. That keeps the focus on network coverage as well as individual station upgrades.<\/p>\n<p>Assembly Member Alec Brook-Krasny welcomed the inclusion of Neptune Av on the F line, saying:<\/p>\n<p>\u201cI strongly support and applaud the MTA\u2019s continued commitment to ADA compliance throughout the NYC transit system,\u201d<\/p>\n<p>\u201cEvery New Yorker deserves barrier-free access to our subway system and I am pleased to report that the Neptune Av Fline station in my district, which is over 100 years old, is on the list for extensive upgrades and elevator installation that will allow everyone to use that station. Thank you, MTA, for moving forward and committing yourself to an inclusive subway system open to everyone regardless of their mobility issues.\u201d<\/p>\n<p>Assembly Member William Colton said the planned work at 18 Av would benefit local riders:<\/p>\n<p>\u201cI am delighted that the MTA is adding two elevators at the D line\u2019s 18 Av station,\u201d<\/p>\n<p>\u201cThis improvement, which is crucial in terms of increasing accessibility at this heavily-used station, will be welcomed by the many people who live nearby \u2013 those with disabilities, seniors, parents with children in strollers, and others \u2013 whose ability to take the subway has been impacted by the flights of stairs they currently need to climb. The new elevators will truly make life easier for my constituents as well as the many people who come to the area to work, shop, visit family and friends, and go to medical appointments.\u201d<\/p>\n<p>Assembly Member Souffrant Forrest said:<\/p>\n<p>\u201cAccessibility isn\u2019t optional. For far too long, riders with disabilities, seniors, and parents with strollers have been unable to use the Nostrand Av station like everyone else,\u201d<\/p>\n<p>\u201cThis is a long-overdue step for our community, and I\u2019ll continue working to ensure these improvements are delivered without delay for the riders who need them most.\u201d<\/p>\n<p>Council Member Jennifer Guti\u00e9rrez said the Jefferson St L station upgrades would support communities in Bushwick:<\/p>\n<p>\u201cReliable and accessible public transit is essential,\u201d<\/p>\n<p>\u201cThe accessibility upgrades coming to the Jefferson St L station are meaningful investments for the neighborhoods and communities I represent, and will make a real difference for seniors, people with disabilities, parents with strollers, and everyone who depends on the subway. I look forward to seeing these improvements become a reality in Bushwick.\u201d<\/p>\n<p><a href=\"https:\/\/www.railway.supply\/\" rel=\"nofollow noopener\" target=\"_blank\">News on railway transport<\/a>, industry, and railway technologies from Railway Supply that you might have missed:<\/p>\n","protected":false},"excerpt":{"rendered":"Brooklyn subway accessibility upgrades have entered procurement at five stations, with the Metropolitan Transportation Authority planning new elevators&hellip;\n","protected":false},"author":2,"featured_media":288918,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[36],"tags":[98,100,99,57,9,24,63,14145,14146],"class_list":["post-288917","post","type-post","status-publish","format-standard","has-post-thumbnail","category-brooklyn","tag-brooklyn","tag-brooklyn-headlines","tag-brooklyn-news","tag-metro","tag-new-york","tag-new-york-city","tag-nyc","tag-rail-transportation-in-the-united-states","tag-railway-infrastructure"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/posts\/288917","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/comments?post=288917"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/posts\/288917\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/media\/288918"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/media?parent=288917"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/categories?post=288917"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/tags?post=288917"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}