{"id":293432,"date":"2026-07-11T21:21:31","date_gmt":"2026-07-11T21:21:31","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ny\/293432\/"},"modified":"2026-07-11T21:21:31","modified_gmt":"2026-07-11T21:21:31","slug":"almost-never-ending-amount-of-lawsuits-could-come-after-midtown-building-collapse","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ny\/293432\/","title":{"rendered":"\u2018Almost never-ending amount of lawsuits\u2019 could come after Midtown building collapse"},"content":{"rendered":"<p>Not only are the building\u2019s owners, developers, contractors and engineers expected to begin pointing fingers at each other in court for what went wrong, the thousands of people and businesses impacted Tuesday when structural columns and steel beams buckled inside a major office-to-residential conversion project on 42nd Street are preparing to file suits to claw back damages over claims of inconvenience and lost work and wages, legal experts told amNewYork.<\/p>\n<p>\u201cThere\u2019s going to be a wide range of claims,\u201d said Glenn Nick, a building safety expert and attorney with construction accident law firm <a href=\"https:\/\/www.triallaw1.com\/attorney\/glenn-w-nick\/\" target=\"_blank\" rel=\"noopener nofollow\">Sullivan Papain<\/a>. \u201cI expect to see a flood of civil suits \u2026 There\u2019s no doubt about it.\u201d<\/p>\n<p>On Tuesday, critical supports failed inside 235 East 42nd St., the 37-floor former Pfizer headquarters that\u2019s being turned into apartments, prompting evacuations of nearby buildings and a frozen zone across several blocks of Midtown. The building has been stabilized by city crews since it buckled, but remains closed and under close watch as engineers investigate what caused it to cave in.<\/p>\n<p>In the aftermath, lawsuits are expected to be levied from and against the building\u2019s <a href=\"https:\/\/pix11.com\/news\/local-news\/who-is-david-werner-and-metroloft-new-developer-of-old-pfizer-building-speaks-out\/\" target=\"_blank\" rel=\"noopener nofollow\">owner and developer<\/a>, <a href=\"https:\/\/metroloft.com\" target=\"_blank\" rel=\"noopener nofollow\">MetroLoft<\/a> and the David Werner Realty Group, who Nick said he believes would have solid legal claims against their engineers, contractors and any subcontractors. Though it will take the completion of a full investigation to figure out who exactly is responsible for what went wrong Tuesday, Nick said it is likely that \u201cseveral parties\u201d are to blame.<\/p>\n<p>\u201cThe building owner would certainly have a negligence claim against whoever they hired, or whoever was subcontracted out by their general contractor to inspect the building and clear it for the work that was being done here,\u201d Nick said. \u201cYou could also have a professional liability claim, basically an engineering malpractice or an architectural malpractice claim against whoever was responsible here.\u201d<\/p>\n<p>He said there would also likely be grounds for the owner to seek repair costs to shore up the building and a cause of action to recoup lost value in the building itself, like decreased future rental values, as the owner would likely argue that consumer confidence in the project is down, and prospective tenants would be less likely to spend.<\/p>\n<p>It is also likely, Nick said, that there\u2019d be counterclaims against the building\u2019s owner by the project\u2019s developer, engineer, and contractor, as the owner has a legal obligation to maintain a safe premise.\u00a0<\/p>\n<p>Legal implications for Midtown building buckling<\/p>\n<p><a href=\"https:\/\/www.beneschlaw.com\/people\/jonathan-a-grippo\/\" target=\"_blank\" rel=\"noopener nofollow\">Jonathan Grippo<\/a>, a construction partner in Benesch Law\u2019s real estate practice, said he expects to see suits from the building\u2019s contractor against the owner over the costs of the project\u2019s delay and suits from the building\u2019s owner against the architect and design team, alleging they structured the project incorrectly.<\/p>\n<p>\u201cThere certainly seems to be implications that the design drawings and the calculations might have been deficient,\u201d Grippo said. \u201cIt could be an installation issue, maybe some designers, maybe the contractor had sold it wrong. I think that has to be fleshed out, but of course, at the litigation stage, everyone just sues, then the facts come out as they come out.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-137858110\" src=\"https:\/\/www.newsbeep.com\/us-ny\/wp-content\/uploads\/2026\/07\/1783804890_230_midtown-structural-beam-obtained-07072026.jpg\" alt=\"buckled steel beam inside Midtown building\" width=\"525\" height=\"700\" title=\"\u2018Almost never-ending amount of lawsuits\u2019 could come after Midtown building collapse 2\"  \/>A buckled steel beam inside 235 East 42nd St. in Midtown on July 7, 2026.Obtained by amNewYork<\/p>\n<p>Beyond suits between the parties owning and working on the building, Nick and Grippo said they expect an \u201calmost unlimited amount of lawsuits\u201d from everyone on \u201cthe outside\u201d of the old Pfizer headquarters: Nearby local businesses, like restaurants and shops that <a href=\"https:\/\/www.cbsnews.com\/newyork\/news\/nathan-berman-metroloft-developer-unstable-building-pfizer-headquarters\/\" target=\"_blank\" rel=\"noopener nofollow\">said<\/a> they\u2019ve had to shut their doors or reduce operations because they\u2019re in the city\u2019s established and still active \u201cfrozen zone\u201d around the building.<\/p>\n<p>The list also includes hotels that had to evacuate, employees of those businesses who have lost wages, and local residents who were inconvenienced and had to temporarily relocate in the aftermath.<\/p>\n<p>\u201cThere\u2019s people that are missing out on income here, whether it\u2019s a business owner all the way down to a loan employee who may not be on salary, and might be earning wages per hour per day that are not able to work right now,\u201d Nick said.\u00a0<\/p>\n<p>\u201cAnd, very simply, if a hotel is out X dollars because they lost tenancies overnight, that could be an action against whoever\u2019s responsible for this near building collapse,\u201d he continued. \u201cIt could go as far down the food chain as somebody who is paying $500 a night for a hotel room that got kicked out and didn\u2019t get their night there, and they had to scramble and get another hotel.\u201d<\/p>\n<p>Additionally, Nick said, if somebody is or was living in the area, and they\u2019re now displaced because of city or fire department orders to vacate their building, they would also have a valid cause of action against those who are responsible for any out-of-pocket expenses they incurred or for their inconvenience of uprooting temporarily.<\/p>\n<p>\u201cI imagine those in the area would have a claim, probably a negligence claim, saying \u2018You failed to perform this project as a reasonable developer, as a reasonable contractor, therefore, I\u2019ve lost business, and business interruption led to a loss of income,\u201d Grippo said.\u00a0<\/p>\n<p>In short, Nick and Grippo said, those who are responsible, whether it\u2019s building owners, those who cleared this work, or both of them, are looking at potentially being hit with a lot of suits.<\/p>\n<p>When litigation is expected to start \u2013 and who\u2019s expected to win<\/p>\n<p>Grippo said he thinks those involved in the building\u2019s construction may be hesitant to start filing right away, as they may want to try to get construction going again before starting to fight each other in expensive, time-consuming litigation.<\/p>\n<p>\u201cI think these parties may think long and hard before they do that, because that takes time and money,\u201d Grippo said. \u201cI think certainly for the developer you want to see if you can get this project righted, and if you can complete it, and then start thinking about formal claims.\u201d<\/p>\n<p>\u201cThere may be some dust settling first \u2013 no parties are very eager or anxious to go down the litigation route,\u201d he added.\u00a0\n<\/p>\n<p>Nick also said he thought the parties would wait a bit to see where the chips fall after a formal investigation into what went wrong, but said he was certain those suits would eventually flow.\u00a0<\/p>\n<p>\u201cIt may make sense to wait a little bit of time just to see when the building is cleared for work to resume to resume again, which would give you an idea of at least for the building what their damages are in terms of lost time for the project,\u201d Nick said. \u201cFor the local individuals living in the area that were evacuated, or any businesses that were evacuated or shut down because of this, I think it would also make some sense to wait a little bit to see when you\u2019re cleared to come back in, so that you have an idea of what your damages are.\u201d<\/p>\n<p>However, he emphasized, anyone could start filing claims whenever they would like. Discovery, the legal fact-finding process that will play out after suits are filed, will also help determine who is legally liable.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-137858100\" src=\"https:\/\/www.newsbeep.com\/us-ny\/wp-content\/uploads\/2026\/07\/1783804891_879_48F9A1C0-D1DD-4652-BCDC-F94A4A8E782E.jpg\" alt=\"\" width=\"700\" height=\"467\" title=\"\u2018Almost never-ending amount of lawsuits\u2019 could come after Midtown building collapse 3\"  \/>Firefighters and the 17th Precinct rushed to the scene. All construction workers inside the former Pfizer building and people in nearby buildings were evacuated.Photo by Dean Moses<\/p>\n<p>Though it is difficult to know whether suits will be successful before they\u2019re filed, Nick said he thought it was clear that the court would order some parties to pay out damages for the mess.<\/p>\n<p>\u201cIn my opinion, clearly something went wrong here, and I don\u2019t believe it\u2019s something that should have gone wrong,\u201d he said. \u201cBuildings aren\u2019t supposed to fail like this. I believe that discovery [and] the investigation is going to show that there was probably more than one individual or entity that bears responsibility for what happened here.\u201d<\/p>\n<p>However, Grippo added that many design contracts include provisions that limit certain parties\u2019 liability \u2014 meaning some may be protected from any suit seeking to hold them liable for any fault in the matter.<\/p>\n<p>\u201cWhat\u2019s interesting is the parties who are part of the project, the owner, the design team, the construction team, they may have mechanisms within their contracts that would stave off, or at least mitigate the damages that they may face in the event of a lawsuit,\u201d Grippo said.\u00a0\u00a0<\/p>\n<p>But, business owners and everyday people who have been impacted aren\u2019t subject to those potential liability limitations, he emphasized.\u00a0\n<\/p>\n<p>Existing legal troubles \u00a0<\/p>\n<p>Records <a href=\"https:\/\/www.fox5ny.com\/news\/midtown-collapse-scare-violations-nycs-largest-office-to-residential-conversion\" target=\"_blank\" rel=\"noopener nofollow\">show<\/a> the building\u2019s been the subject of roughly half a dozen violations filed with the city\u2019s Department of Buildings that have cost it over $32,000 in fines for things like failing to follow blueprints and official plans, falling debris and not reporting a worker falling from a ladder.<\/p>\n<p>In addition to the violations filed with the City Department of Buildings, the site\u2019s general contractor, 235 GC LLC, has been the target of four workers\u2019 compensation claims that accused it of failing to take proper worker safety precautions.\u00a0<\/p>\n<p>Two workers claimed the contractor did not properly secure the ladders, from which they fell. One claimed he was injured by a heavy jackhammer that was not properly secured while being moved.\u00a0<\/p>\n<p>A fourth claimed that he was injured by debris that fell from the building. He claimed the defendants were reckless because they failed to provide overhead protection. Documented <a href=\"https:\/\/documentedny.com\/2026\/07\/08\/pfizer-building-safety-northeast-new-york\/\" target=\"_blank\" rel=\"noopener nofollow\">reported<\/a> that construction workers union Laborers Local 79 had been raising safety concerns about one of the building\u2019s subcontractors, Northeast Service Interiors LLC for the past three years.\u00a0<\/p>\n<p>Suits against the city?<\/p>\n<p>Both Nick and Grippo said they didn\u2019t think it was likely for the city to be the subject or harbinger of litigation, but that it was certainly possible, particularly if the building were to fully collapse and cause damage to city property.\u00a0<\/p>\n<p>\u201cI think that\u2019s a more difficult legal claim to sue City Hall, but it\u2019s certainly something that should be explored, because there\u2019s reports that corners were cut here, shortcuts were taken,\u201d Nick said. \u201cThat might start with the permit approval process for this and any inspections done by the New York City Department of Buildings or the mayor\u2019s office.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"Not only are the building\u2019s owners, developers, contractors and engineers expected to begin pointing fingers at each other&hellip;\n","protected":false},"author":2,"featured_media":289201,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[2710,75,111956,9,11,10,613],"class_list":["post-293432","post","type-post","status-publish","format-standard","has-post-thumbnail","category-new-york","tag-law","tag-manhattan","tag-midtown-building-collapse","tag-new-york","tag-new-york-headlines","tag-new-york-news","tag-pm-newsletter"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/posts\/293432","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/comments?post=293432"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/posts\/293432\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/media\/289201"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/media?parent=293432"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/categories?post=293432"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/tags?post=293432"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}