{"id":75321,"date":"2025-12-19T09:32:28","date_gmt":"2025-12-19T09:32:28","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ny\/75321\/"},"modified":"2025-12-19T09:32:28","modified_gmt":"2025-12-19T09:32:28","slug":"division-street-dairy-queen-in-portland-an-update","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ny\/75321\/","title":{"rendered":"Division Street Dairy Queen in Portland: An Update"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" width=\"1710\" height=\"855\" src=\"https:\/\/www.newsbeep.com\/us-ny\/wp-content\/uploads\/2025\/12\/walk-up-dairy-queen-se-division-portland-oregon.png\" alt=\"The Division Street Dairy Queen from years ago. \" class=\"wp-image-11016\"  \/>The Dairy Queen that was. <\/p>\n<p>About a year ago, we wrote about the <a href=\"https:\/\/bridgetownbites.com\/2024\/12\/16\/dairy-queen-se-division-opening-update-portland-oregon\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Division Street Dairy Queen (SE Division and 55th Avenue)<\/a>. At that point in time, the folks at DQ were expecting to start construction in January 2025 with an estimated completion of June 2025. Obviously that has not happened. Permitting surrounding the drive-through is a big part of the saga, and the community has also voiced their concerns with and support of it. Here are some updates.<\/p>\n<p>Note: Aside from encouraging folks to comment on the land use review application, the statements made by the property owner, neighborhood association, community members, and DQ do not necessarily reflect the stance of Bridgetown Bites. <\/p>\n<p>Division Street Dairy Queen: The Letter<\/p>\n<p>A Bridgetown Bites reader tipped me off to the <a href=\"https:\/\/www.reddit.com\/r\/Portland\/comments\/1pkfwc9\/a_letter_about_the_55th_division_dq_was_on_my\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">discussion on Reddit<\/a> about a letter distributed to neighbors that is about the Dairy Queen. It is in support of building the DQ with a drive-through. I\u2019ve since heard from others who have received the same letter. Here it is (click to enlarge): <\/p>\n<p><a href=\"https:\/\/www.newsbeep.com\/us-ny\/wp-content\/uploads\/2025\/12\/letter-to-neighbors-dairy-queen-se-division-portland-oregon.jpeg\" target=\"_blank\" rel=\" noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"654\" height=\"837\" src=\"https:\/\/www.newsbeep.com\/us-ny\/wp-content\/uploads\/2025\/12\/letter-to-neighbors-dairy-queen-se-division-portland-oregon.jpeg\" alt=\"Dear Neighbors We are reaching out for your support in rebuilding our neighborhood Dairy Queen at 5605 SE Division St. Portland. As you may know the previous owners Don and Dorothy operated a Dairy Queen here for over 50 years - it is one of the first Dairy Queens in Oregon. Many in our community have fond memories of visiting after school or as their first job. The new owners are locals to the Portland area and are trying to keep this historical Dairy Queen at this location, as they had promised the previous owners when they retired. It has taken a few years to get building permits from the City of Portland and to start the construction. Covid as well as heavily understaffed departments at the City of Portland led to a delay in the permits. Building permits were completed in April 2025, then the construction bid and loan approval took another 4 to 5 months. Finally, construction started in September 2025. Construction stopped 10 days after it was started due these concerns:&#10;&#10;The City of Portland is now asking to develop a Dairy Queen without a drive-thru after previously approving it on the Building Plans in April 2025. There has been a Dairy Queen drive-thru here for over 60 years.&#10;&#10;Store plans were made after an extensive traffic study, with traffic pattern in mind, and many meetings with the city advisors. Originally, the drive-thru accommodated only 2 cars however after the study, plans were changed. The new plans will accommodate 9-10 cars in the drive-thru on the property. This should help traffic flow.&#10;&#10;The owners have already invested $650K on this local Dairy Queen which includes permits fee (Over $350K), traffic study, environment and soil testing, finding of city's water and sewer lines, architect fee and engineering etc.&#10;&#10;When we tore down the previous building, they hoped to have a new and improved Dairy Queen up soon. Unfortunately, without the drive- thru approval Dairy Queen would likely no longer be fit for this location. Options could be another branded restaurant or High-rise building. Which will create street parking congestion and will not be a solution for the traffic.&#10;&#10;Drive Thru window helps elderly, people with disability and all of us in rain\/snow when we do not need to park and come out of the vehicle.&#10;&#10;By the way DQ store creates 25-30 jobs and keeps kids busy and off the street.&#10;&#10;DQ Store also generates lots of revenue for the city, County and the state. Please reach out to the below contact at the City of Portland in support so we can have our local Dairy Queen with Drive Thru.\" class=\"wp-image-17147\" style=\"width:674px;height:auto\"  \/><\/a><\/p>\n<p>Division Street Dairy Queen: Timeline of Permits<\/p>\n<p>I thought I\u2019d put the permits for this property in a table, listed by set up date, which is the first date assigned to a permit as it starts its process through Portland\u2019s permitting bureaucracy. Each permit is linked to so you can read its Work\/Case Description. This is snapshot of the status as of December 18, 2025.<\/p>\n<p>Set Up DateIssue DateTypeStatus Notes7\/30\/18 (<a href=\"https:\/\/www.southeastexaminer.com\/2019\/12\/se-division-dairy-queen-remodel\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">restarted<\/a> in 2019)10\/11\/22Commercial Building <a href=\"https:\/\/www.portlandmaps.com\/detail\/permit\/2018-210965-000-00-CO\/4253499_did\/?property_id=R297296\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Permit<\/a>Admin Hold (latest activity 12\/3\/25)10\/11\/1910\/14\/19Demolition <a href=\"https:\/\/www.portlandmaps.com\/detail\/permit\/2019-239458-000-00-CO\/4471309_did\/?property_id=R297296\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Permit<\/a>Final Inspection Approved1\/27\/2110\/09\/25Public Street Improvements <a href=\"https:\/\/www.portlandmaps.com\/detail\/permit\/2021-008267-000-00-WT\/4645505_did\/?property_id=R297296\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Permit<\/a> Under review (Public Works\/PBOT)4\/26\/234\/17\/25Commercial Building <a href=\"https:\/\/www.portlandmaps.com\/detail\/permit\/2018-210965-REV-01-CO\/4918377_did\/?property_id=R297296\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Permit<\/a>Issued8\/03\/234\/17\/25Mechanical <a href=\"https:\/\/www.portlandmaps.com\/detail\/permit\/2023-071191-000-00-MT\/4955606_did\/?property_id=R297296\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Permit<\/a> (hot water heater, etc.)Issued3\/12\/243\/12\/24Sewer Cap Plumbing <a href=\"https:\/\/www.portlandmaps.com\/detail\/permit\/2024-022022-000-00-PT\/5023192_did\/?property_id=R297296\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Permit<\/a>Final Inspection Approved10\/10\/25None<a href=\"https:\/\/www.portlandmaps.com\/detail\/permit\/2025-083012-000-00-LU\/5199487_did\/?p=R297296\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Land Use Review<\/a>: Nonconf. Situation review for Dairy Queen drive-through.Incomplete10\/10\/25None<a href=\"https:\/\/www.portlandmaps.com\/detail\/permit\/2025-083003-000-00-LU\/5199478_did\/?p=R297296\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Land Use Review<\/a>: NE \u2013 Nonconf. Status EstablishmentPending<\/p>\n<p>As you can see, the majority of these permits have taken years to complete. <\/p>\n<p>It\u2019s the Drive-Through<\/p>\n<p>As explained in the letter, the crux of the situation is the assertion that a drive-through is necessary at the Dairy Queen. There are some things worth noting:<\/p>\n<p>The original building originally opened in the 1960s and as mentioned earlier, it started out with a drive-through. <\/p>\n<p>The original building had a walk-up window that people miss.<\/p>\n<p>The original building was demolished in 2019.<\/p>\n<p>The city has banned the creation of new drive-throughs in areas zoned CM1, CM2, and CM3. <a href=\"https:\/\/www.mttaborpdx.org\/_files\/ugd\/d5eb21_29838f7aca6b4fb7bec68298a8e6274c.pdf\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">This location is zoned CM2<\/a>.<\/p>\n<p>However, existing drive\u2010throughs are allowed to operate. They can be rebuilt, expanded, or relocated on the site. <\/p>\n<p>But, if the use of the drive\u2010through facility is discontinued for 3 continuous years, reestablishment is prohibited. (<a href=\"https:\/\/www.portland.gov\/sites\/default\/files\/code\/33.130-commercial-mixed-use-zones.pdf\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Source<\/a>)<\/p>\n<p>The FX2\u2013Division route began operating on September 18, 2022.<\/p>\n<p>As a reminder, here is the sketch of how the drive-through would work for the proposed DQ, extracted from <a href=\"https:\/\/docs.portlandoregon.gov\/download.aspx?r=BDS%2DPS%2F402664&amp;h=EF66E6F810FFD2AF20F727D11E78A20B\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">this document<\/a> submitted to the city. <\/p>\n<p><a href=\"https:\/\/www.newsbeep.com\/us-ny\/wp-content\/uploads\/2025\/12\/site-layout-dairy-queen-se-division-portland-oregon.png\" target=\"_blank\" rel=\" noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1564\" height=\"1392\" src=\"https:\/\/www.newsbeep.com\/us-ny\/wp-content\/uploads\/2025\/12\/site-layout-dairy-queen-se-division-portland-oregon.png\" alt=\"Potential drive-though scenario at the Division Street Dairy Queen. \" class=\"wp-image-11017\"  \/><\/a><\/p>\n<p>I was able to connect with the property owner, Mohan GreWal, who commented on the detail about the three years of discontinued use of a drive-through. He said, \u201cIf permits are not issued by the city in timely manner then how I can build in three years?\u201d<\/p>\n<p>He continued, \u201cI just need 12 to 14 months to build after permits are issued. After permits are issued then General Contractor bids take 2 to 3 months. After that, the final bid is submitted to the bank for loan approval, which again takes approximately two months to get an appraisal and loan approval\u2014then the building process starts.\u201d<\/p>\n<p>He added, \u201cThe City needs to be fair. The City is short staffed and taking a long time to review the plans. I am still waiting for permits from PBOT. How can I build?\u201d\u00a0<\/p>\n<p>The Pros and Cons From Neighbors<\/p>\n<p>Some of the concerns from community members include the noise, pollution, pedestrian safety, and congestion at the drive-through, including how it might interfere with the FX2-Division bus\u2019s transiting along the road.<\/p>\n<p>Other people want to see the DQ return, with the drive-through. Points made include that drive-throughs provide access for those who are disabled and can\u2019t walk (also mentioned in the letter). Some feel a deep sense of nostalgia for the DQ that was there during their youth. The business also pays taxes that provide revenue to the City of Portland.<\/p>\n<p>Some Comments From Neighbors<\/p>\n<p>People have been vocal about this on both Nextdoor and Reddit. Here are some of the things people are saying. <\/p>\n<p>\u201cA drive through there will only result in absolutely fucking up the FX2 timetables.\u201d [Reddit]<\/p>\n<p>\u201cI frequented that Dairy Queen in their final year. Many times I had to pass by because a car was stretched into the bike lane. It was a slow moving restaurant even when you did get in the drive through. They routinely would ask cars to park in the limited spaces after ordering. There\u2019s no need for a drive through at this location.\u201d [Reddit]<\/p>\n<p>\u201cThere is nothing life or death urgent about a Dairy Queen not having a drive thru,\u201d said one user. The response: \u201cIt does to people who are disabled and cannot walk far.\u201d [Nextdoor]<\/p>\n<p>\u201cAs someone who grew up in the neighborhood and graduated from Franklin HS I long for the nostalgia of the DQ to be brought back to the area. However, the lines to get into the drive thru AND parking lot were always problematic for traffic. I hope they find a solution that will allow the DQ to reopen even without the drive thru.\u201d [Nextdoor] <\/p>\n<p>The Division Street Dairy Queen Land Use Review Application<\/p>\n<p>At this point, a land use review application has been submitted for this property (see final item in the table above). It is \u201cto confirm if [the applicant] retain[s] rights under Zoning Code Section 33.130.260.C.2 to reconstruct a Drive-Through Facility on the site.\u201d<\/p>\n<p>A <a href=\"https:\/\/www.portland.gov\/ppd\/zoning-land-use\/documents\/notice-land-use-proposal-lu-25-083003-ne\/download\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">public notice letter from the city<\/a> was sent on December 1, 2025 to the Mount Tabor Neighborhood Association and to 14 addresses of neighbors around the DQ property and others. This is similar to what happened in my neighborhood when a Land Use Review was triggered by a zoning issue when a property owner applied to erect a 100-foot cell phone tower there.<\/p>\n<p>Use Your Voice<\/p>\n<p>Regardless of your stance on the situation, if you want to contribute comments on this Land Use Review Application, I recommend following the guidelines exactly as put forth by the city. Instructions are in the letter from the city on what to include, where to send your statement:<\/p>\n<p>\u201cPublic comments must be received within 21 days of the mail date of this notice. If you<br \/>would like to submit written comments, they must be received by 5pm on December<br \/>22, 2025. Your comments must be emailed to the assigned planner listed above; please<br \/>include the Case File Number, LU 25-083003 NE, in your email.\u201d That planner is Andrew Gulizia, Land Use Services who can be reached at Andrew.Gulizia@portlandoregon.gov.<\/p>\n<p>From the Mount Tabor Neighborhood Association (MTNA)<\/p>\n<p>The MTNA has kept tabs on this situation, as the Dairy Queen property is within their boundaries. On their website, they presented a kind of timeline of their interest in the property this year. It starts in May 2025. <a href=\"https:\/\/www.mttaborpdx.org\/copy-of-connect-contact-us\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Here\u2019s their timeline<\/a>; below are condensed highlights. Mohan said, \u201cI had a couple of meetings with them and they have been very helpful.\u201d<\/p>\n<p>May 2025: The MTNA sent a letter to the current property owner letting them know of community interest. They were invited to a MTNA meeting; they did not respond to the invitation.<\/p>\n<p>July 2025: A community member contacted the MTNA with concerns that the City did not seem to be applying the three-year time limit on drive-throughs for grandfathering-in the continued use of a previous drive-through (at this point, the three years had expired). They were concerned about safety, zoning violations, and the impression of inconsistent standards being applied. They asked the MTNA to ask the City to enforce the three-year limit regulation.<\/p>\n<p>July 16, 2025: At this NA meeting MTNA Board members voted to send a letter to the City opposing the drive-through and for the City to deny any attempt to reinstate the drive-through unless it lawfully abides by the city zoning code. (You can view the August 1, 2025 MTNA letter\u00a0<a href=\"https:\/\/www.mttaborpdx.org\/_files\/ugd\/d5eb21_9afd35db78034581bf1580270d4e4527.pdf\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">here<\/a>.)<\/p>\n<p>November 2025: The property owner, Mohan GreWal, attended an MTNA regular monthly meeting. He shared his hopes, concerns, and frustrations. He cited high cost and slow progress of the permit process. He also said the City had not raised the issue about the three-year time limit until late in the process, after he had spend a lot of money. He also defended the drive-through, mentioning improved usability for cars compared to the old setup, reducing the chance of a backup on Division; and suggested an alternative development could cause problems re: parking, traffic. He also said the DQ will create new jobs.<\/p>\n<p>November 25, 2025: Paul Leistner and Alex Roy (representing the MTNA Board) met with Mohan at the DQ property.\u00a0<\/p>\n<p>December 1, 2025:  The City of Portland sent out a public notice inviting public comment on the question of the legality of allowing the drive through as part of the proposed DQ project. (See below for more info.)<\/p>\n<p>Potential Compromises<\/p>\n<p>These are things the neighbors on SE 55th Avenue would like to see the City implement if the DQ drive-through redevelopment goes through. They shared these points with the MTNA:<\/p>\n<p>A Left Turn Only sign as folks leave the DQ site [and exit onto SE 55th]. <\/p>\n<p>A barrier in the street that prevents right hand turns [on SE 55th as people exit the DQ property]<\/p>\n<p>A crosswalk to make it safe for students and others to cross Division [to reach the DQ]<\/p>\n<p>Speed bumps on 55th to slow traffic (if other options aren\u2019t available to mitigate traffic).\u00a0<\/p>\n<p>On the MTNA letter sent to the City, Paul Leistner wrote, \u201cOur community has spent years advocating for a more walkable, transit-supportive Division corridor; and this project directly threatens that progress.\u201d<\/p>\n<p>Additional Comments from Mohan GreWal<\/p>\n<p>He said, \u201cThis Dairy Queen has been part of this neighborhood over 60 years with a drive-through. A new clean building, new design, and new equipment will give quality food to the neighborhood. A new build uplifts neighborhood look.\u201d He also highlighted the possible jobs created by having the DQ in the neighborhood, and the resulting economic boost to those employed individuals and their families. <\/p>\n<p>He also highlighted the tax revenue that would be generated by the DQ, his views on the importance of growth in an urban setting, and circled back to the damage a slow permitting approval pace has caused his project. \u201cIt\u2019s an opportunity to keep the existing businesses going in the city, employment for the people, and revenue for the city and county, \u201d he said. \u201cWe as a country are competing globally. If other counties are growing and building faster, then we need to think and remove the hurdles to build faster.\u201d<\/p>\n<p>He continued, \u201cI could have built three stores in the last five to six years if I had permits approved quicker. Local government needs to create an environment for growth of the city. We need to grow, to give employment to a new generation, and keep them busy so they stay away from trouble. We need to give the best for the next generation.\u201d<\/p>\n<p>And he added later in an email message this morning regarding his view on the point raised regarding how the drive-through would affect traffic. \u201cWe do not open till 10:30am,\u201d he explained.  \u201cWhich in not a rush hour and will not have any traffic issue. Most of the other brands open at 6am.\u201d<\/p>\n<p>Additional Details from DQ<\/p>\n<p>I reached out to my contact at Dairy Queen, Fred Braden. He had some additional insight from the DQ side, which you may find helpful. They, of course, would like the community\u2019s support of this DQ and its drive-through. <\/p>\n<p>\u201cThe city noticed us in August [2025] that our drive-through was no longer allowed unless it was completed by the end of September [2025]. We had already broken ground on the project but were waiting for the Portland Public Works Department to approve the civil plans regarding the work needed on Division Street. The civil plans for the DQ have been approved for some time but we need plan approval from PPWD to make sure what we are doing on the site as far as groundwork was not going to change based on plan changes made by PPWD. This has been an arduous process to say the least, but as of last week we have an approval pending permit payment.\u201d<\/p>\n<p>They have filed several appeals to the City of Portland regarding the removal of the drive-through. But citing the \u201cslow pace of approval\u201d and a \u201cchanging employment base\u201d has resulted in a difficult expenditure of time and money, especially by Mohan GreWal (who arranged to have the original Dairy Queen building demolished).<\/p>\n<p>\u201cThe owner, Mohan GreWal, to date has spent well over $600,000 in permits fees, online clarification meetings with the City\u2019s permit office, impact studies as well as deposits with contractors who have now stopped work due to the current impasse. Mr. GreWal retained a law firm in September to help navigate this process of appeals.\u201d<\/p>\n<p>He also believes the appeal process with the City is not transparent, \u201cmeaning it is an internal review from which there is no appeal.\u201d If the Land Use Review gets to the point where folks want to appeal the decision, there will be a hearing in front of a hearing officer and a chance for neighbors to appeal (the Applicant would also be able to attend). He also said, \u201cIf they deem the community not in support of rebuilding the DQ then our options are very limited.\u201d<\/p>\n<p>They\u2019ve been canvassing the neighborhood, working to get support from the neighbors.<\/p>\n<p>He offered this. \u201cFast food restaurants still do about 65% of their business through a drive-through and without a drive-through the revenue the location will do is significantly reduced.\u201d<\/p>\n<p>Also, drive-through use goes up during our rainy Portland winters. This <a href=\"https:\/\/djcoregon.com\/news\/2024\/05\/22\/drive-thrus-driving-property-sales-in-portland\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">article from DJC Oregon<\/a> talks about the value of having a drive-through on a property. In the article, Dale Bernards, owner and principal broker of\u00a0Portland\u2019s Canterbury Commercial\u00a0said, \u201cThey\u2019re definitely much more valuable. If you have a drive-thru that\u2019s available, that definitely creates more value to the real estate.\u201d<\/p>\n<p>\u201cThe city seems to think that we should proceed to develop without a drive-thru and that is just not possible,\u201d said Fred. \u201cThe project is already projected to cost almost $3 million, not including land costs. The drive-thru is needed to make this project feasible and there has been a Drive-thru at that location ever since it opened in 1966.\u201d<\/p>\n<p>So there you have it. It will be interesting to see what happens with this property. I hope this information is helpful and gives you more of an idea what the different shareholders think. As always, I welcome your thoughts\u2014feel free to comment here or wherever you see this article linked to on social media. <\/p>\n<p>Dairy Queen\u00a0[projected opening unknown]<br \/>5605 SE Division Street, Portland<br \/><a href=\"https:\/\/www.dairyqueen.com\/en-us\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Dairy Queen website<\/a><\/p>\n<p>Updated December 18, 2025 with additional comments from the property owner.<\/p>\n<p>The following two tabs change content below.<\/p>\n<p>\t\t<img loading=\"lazy\" decoding=\"async\" alt=\"identicon\" src=\"https:\/\/www.newsbeep.com\/us-ny\/wp-content\/uploads\/2025\/12\/meg-and-coffee-e1499478082960-150x150.jpg\" class=\"avatar avatar-80 photo\" height=\"80\" width=\"80\"\/><\/p>\n<p>Bridgetown Bites is edited and published by Meg Cotner in Portland, Oregon. She loves avocados, fresh produce, NA drinks, and cats.<\/p>\n<p>\t\t<img loading=\"lazy\" decoding=\"async\" alt=\"identicon\" src=\"https:\/\/www.newsbeep.com\/us-ny\/wp-content\/uploads\/2025\/12\/meg-and-coffee-e1499478082960-150x150.jpg\" class=\"avatar avatar-80 photo\" height=\"80\" width=\"80\"\/><\/p>\n","protected":false},"excerpt":{"rendered":"The Dairy Queen that was. About a year ago, we wrote about the Division Street Dairy Queen (SE&hellip;\n","protected":false},"author":2,"featured_media":75322,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[9,24,63,122,124,123],"class_list":["post-75321","post","type-post","status-publish","format-standard","has-post-thumbnail","category-queens","tag-new-york","tag-new-york-city","tag-nyc","tag-queens","tag-queens-headlines","tag-queens-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/posts\/75321","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/comments?post=75321"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/posts\/75321\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/media\/75322"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/media?parent=75321"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/categories?post=75321"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ny\/wp-json\/wp\/v2\/tags?post=75321"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}