Long-term
Route 29, Route 100 to Montgomery County line, Hereford Township, utility work, 9 a.m. to 3 p.m. through July 31
Route 61: Blue Mountain Drive to Lowland Road, Tilden Township, single lane in both directions forĀ construction through Oct. 30.
Route 724, Route 568 to Annon Street, Robeson Township, closed until October for bridge replacement. Follow posted detour.
Long Lane at Route 222, Maxatawny Township, closed until July 31 for roundabout construction. Follow posted detour.
Daily
Monday-Friday: Route 222, Route 662 to Long Lane in Kutztown area, shoulder work/widening, 7 a.m. to 3 p.m.
Monday-Friday: Niantic Road, Route 100 to Montgomery County line, Washington Township, road closed for drainage work, 7 a.m. to 3 p.m.
Wednesday: Frystown Road, Route 501 to Lancaster County line, Bethel Township, shoulder work/widening, 7 a.m. to 3 p.m.
Thursday: County Line Road, Mount Zion Road to Meckville Road, shoulder work/widening, 7 a.m. to 3 p.m.
Friday: Meckville Road, County Line Road to Camp Strauss Road, Bethel Township, shoulder work/widening, 7 a.m. to 3 p.m.