The bridge, a key section of the parkway between the eastern end of the Squirrel Hill Tunnel and the Edgewood/Swissvale exit, closed on July 10 so that it could be razed and its replacement span slid into place.

The project, which will last at last until Aug. 3, has resulted in lengthy detours for 100,000 motorists daily.