PennDOT maintenance crews will conduct road work at multiple locations throughout Northampton County on Wednesday and Friday, with drivers advised to expect delays and use caution in work zones.

Wednesday brings drainage work to Flint Hill Road in Lower Saucon Township between Route 412 and the Bucks County line, and Main Street in Chapman Borough and Moore Township between Monocacy Drive and East Beersville Road. Roadway reflector installation is scheduled for Martins Creek Belvidere Highway in Lower Mount Bethel Township between Route 611/South Delaware Drive and Riverton Road.

Work resumes Friday, with drainage projects on Black River Road in Lower Saucon Township between Route 378 and Bingen Road, and Main Street in Chapman Borough and Moore Township.

Pothole patching will occur on Nor-Bath Boulevard in East Allen Township between Airport Road and Seemsville Road. Roadway reflector installation is scheduled for Broadway Street in Wind Gap Borough between Mack Road and Sullivan Trail, and Mount Pleasant Road in Lower Mount Bethel Township between Martins Creek Belvidere Highway and South Delaware Drive.

All work is weather-dependent and scheduled to take place between 8 a.m. and 3 p.m.

Motorists can check conditions on major roadways by visiting www.511pa.com. The free service, available 24 hours a day, provides traffic delay warnings, weather forecasts, traffic speed information and access to more than 1,000 traffic cameras. 511PA is also available through a smartphone application for iPhone and Android devices, by calling 5-1-1, or by following local alerts on X.