{"id":104335,"date":"2026-02-03T23:33:06","date_gmt":"2026-02-03T23:33:06","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-pa\/104335\/"},"modified":"2026-02-03T23:33:06","modified_gmt":"2026-02-03T23:33:06","slug":"plan-to-reconstruct-one-of-pittsburghs-most-prominent-streets-is-about-to-go-out-for-bidding-wpxi","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-pa\/104335\/","title":{"rendered":"Plan to reconstruct one of Pittsburgh\u2019s most prominent streets is about to go out for bidding \u2013 WPXI"},"content":{"rendered":"<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">PITTSBURGH  \u2014 A project that will reconstruct one of Downtown Pittsburgh\u2019s most prominent streets is closer to being realized. <\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Mayor Corey O\u2019Connor\u2019s office says that the work for the first phase of the Smithfield Street Reconstruction Project will go out for bidding within two weeks. <\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Planned upgrades on Smithfield Street between Forbes Avenue and Sixth Avenue include complete reconstruction of the roadway, extended sidewalks, new curbs, pedestrian safety bump outs, signage, pavement markings, street landscaping and infrastructure for artistic lighting<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">The mayor\u2019s office says the infrastructure improvements will promote pedestrian safety and create new opportunities, like outdoor dining. <\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">\u201cTo have a more vibrant Downtown, we have to invest in opportunities on our main streets,\u201d Mayor Corey O\u2019Connor said. \u201cSmithfield is an important corridor for transit, shopping and culture and it should be safe for pedestrians and vehicles.\u201d<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Phase one construction could begin this summer and is expected to take 18-24 months to finish. This first phase of work will \u201cset the standard for future phases,\u201d the mayor\u2019s office said. <\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">The project is a partnership between the Department of Mobility and Infrastructure, PennDOT and the Pittsburgh Downtown Partnership. <\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Download the <a href=\"https:\/\/www.wpxi.com\/mobile-apps\/\" rel=\"nofollow noopener\" target=\"_blank\">FREE WPXI News app<\/a> for breaking news alerts.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Follow Channel 11 News on <a href=\"https:\/\/www.facebook.com\/wpxi\" rel=\"nofollow noopener\" target=\"_blank\">Facebook<\/a> and <a href=\"https:\/\/twitter.com\/WPXI\" rel=\"nofollow noopener\" target=\"_blank\">Twitter<\/a>. | <a href=\"https:\/\/www.wpxi.com\/video\/\" rel=\"nofollow noopener\" target=\"_blank\">Watch WPXI NOW<\/a><\/p>\n<p>TOP STORIES FROM CHANNEL 11 NEWS <\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph body-copyright\">\u00a92026 Cox Media Group<\/p>\n<p><script async src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><\/p>\n","protected":false},"excerpt":{"rendered":"PITTSBURGH \u2014 A project that will reconstruct one of Downtown Pittsburgh\u2019s most prominent streets is closer to being&hellip;\n","protected":false},"author":2,"featured_media":104336,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[53,4623,50395,9857,73,75,74,4582,50394,17065,50392,50393],"class_list":["post-104335","post","type-post","status-publish","format-standard","has-post-thumbnail","category-pittsburgh","tag-construction","tag-downtown-pittsburgh","tag-downtown-pittsburgh-construction","tag-forbes-avenue","tag-pittsburgh","tag-pittsburgh-headlines","tag-pittsburgh-news","tag-project","tag-sixth-avenue","tag-smithfield-street","tag-smithfield-street-reconstruction","tag-smithfield-street-reconstruction-project"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/104335","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/comments?post=104335"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/104335\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media\/104336"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media?parent=104335"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/categories?post=104335"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/tags?post=104335"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}