{"id":239984,"date":"2026-07-10T06:03:39","date_gmt":"2026-07-10T06:03:39","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-pa\/239984\/"},"modified":"2026-07-10T06:03:39","modified_gmt":"2026-07-10T06:03:39","slug":"plan-for-mixed-income-housing-complex-gets-green-light-from-bethlehem-planners-bethlehem-area","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-pa\/239984\/","title":{"rendered":"Plan for mixed-income housing complex gets green light from Bethlehem planners | Bethlehem Area"},"content":{"rendered":"<p>BETHLEHEM, Pa. \u2013 The Bethlehem Planning Commission on Thursday approved a land development plan for the Eastern Gateway, also known as Gateway on 4th, at 1400 E. Fourth St. The two-phase project includes four buildings with 120 apartments, retail space, a fitness center, a community room and parking.<\/p>\n<p>A majority of the units would be affordable, available to applicants at 60% of the area\u2019s median income and below, the applicant said.<\/p>\n<p>According to planning commission documents, planned site improvements include surface parking, stormwater facilities, landscaping, a playground and a trail connection to the South Bethlehem Greenway.<\/p>\n<p>The commission reviewed the proposal in May but tabled action after citing engineering, fire safety and zoning comments outlined in the city&#8217;s review letter.<\/p>\n<p>According to Kris Reiss of T&amp;M Associates, who spoke on behalf of the applicant, revisions since that meeting include additional fire lanes and a fire hydrant at the corner of William and Fourth streets, additional trees and steep-slope matting along Fourth Street, and redesigned parking areas with landscape islands and space for the fire department&#8217;s ladder truck.<\/p>\n<p>&#8220;Thank you for understanding the procedure\u2026ironing out all those things, coming back, and it seems a lot cleaner. We appreciate that,&#8221; planning commission Chair Rob Melosky said.<\/p>\n<p>The project\u2019s phase one would include Building A, a four-story structure featuring about 1,200 square feet of retail space; a 750-square-foot fitness center; a 1,350-square-foot community room; and maintenance and utility areas on the first floor.<\/p>\n<p>Floors two through four would contain 44 apartments, according to plans.<\/p>\n<p>Building B, also part of the first phase, would contain 16 apartments and 20 below-grade parking spaces because of the site\u2019s topography. Additional improvements would include a 45-space surface parking lot, stormwater facilities, landscaping, lighting, a trash enclosure and a mailbox shelter.<\/p>\n<p>Buildings C and D are part of the development\u2019s second phase.<\/p>\n<p>Building C would be a three-story structure with 44 apartments, and Building D would contain 16 apartments and 20 below-grade parking spaces. The second phase also calls for a 45-space surface parking lot, a tot lot and a paved trail connection to the South Bethlehem Greenway.<\/p>\n<p>Other business<\/p>\n<p>The planning commission also reviewed plans Thursday night for several other residential and mixed-use proposals, including projects that would add more than 100 apartments citywide.<\/p>\n<p>             <a href=\"https:\/\/www.wfmz.com\/news\/area\/lehighvalley\/northampton-county\/bethlehem-area\/bethlehem-planners-review-proposals-for-more-than-200-new-apartments-citywide\/article_7b6de73e-d921-45bf-9990-3c315fb6978e.html\" class=\"tnt-asset-link\" aria-label=\"Bethlehem planners review proposals for more than 200 new apartments citywide\" rel=\"nofollow noopener\" target=\"_blank\"><\/p>\n<p>            Bethlehem planners review proposals for more than 200 new apartments citywide<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"BETHLEHEM, Pa. \u2013 The Bethlehem Planning Commission on Thursday approved a land development plan for the Eastern Gateway,&hellip;\n","protected":false},"author":2,"featured_media":193021,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[2313,153,155,154,629,39804,103194,85964,19667,21220,94964,22638,103191,4767,103193,103192],"class_list":["post-239984","post","type-post","status-publish","format-standard","has-post-thumbnail","category-bethlehem","tag-affordable-housing","tag-bethlehem","tag-bethlehem-headlines","tag-bethlehem-news","tag-bethlehem-planning-commission","tag-craig-peiffer","tag-eastern-gateway","tag-gateway-on-4th","tag-gateway-on-fourth","tag-joy-cohen","tag-matt-malozi","tag-planning-commission","tag-polk-street-garage","tag-rob-melosky","tag-tm-associates","tag-vincent-marucci"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/239984","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/comments?post=239984"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/239984\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media\/193021"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media?parent=239984"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/categories?post=239984"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/tags?post=239984"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}