{"id":249396,"date":"2026-07-22T14:51:07","date_gmt":"2026-07-22T14:51:07","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-pa\/249396\/"},"modified":"2026-07-22T14:51:07","modified_gmt":"2026-07-22T14:51:07","slug":"amtrak-selects-stv-for-static-frequency-converter-replacement-in-philadelphia","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-pa\/249396\/","title":{"rendered":"Amtrak selects STV for static frequency converter replacement in Philadelphia"},"content":{"rendered":"<p style=\"font-weight: 400;\">Amtrak has selected STV to create the preliminary design to replace static frequency converter (SFC) #4 at the Richmond SFC Station in Philadelphia. The facility is Amtrak\u2019s largest traction power converter station, powering Amtrak\u2019s Northeast Corridor between Washington, D.C., New York and Harrisburg, Pa.<\/p>\n<p style=\"font-weight: 400;\">The SFC has reached the end of its useful life, according to Amtrak\u2019s <a href=\"https:\/\/nec-commission.com\/wp-content\/uploads\/2024-12-17_Full-Appendix_FINAL-WEB.pdf\" target=\"_blank\" rel=\"noopener nofollow\">Northeast Corridor Capital Investment Plan Project Information Appendix for fiscal years 2025-2029<\/a>. The unit is being replaced due to increased downtime, obsolescence of components and because it\u2019s requiring an increased number of service events to maintain reliable power output. The project is expected to cost $62 million and is aiming for completion by October 2029.<\/p>\n<p style=\"font-weight: 400;\">STV will conduct a full site survey, infrastructure assessment and state-of-good-repair review, followed by a technology evaluation. The firm is set to prepare design criteria, drawings, technical specifications and estimates for construction cost and schedule for the next project phase. STV notes that the project requires close coordination with environmental and historical preservation stakeholders, as the station is located within a National Register boundary.<\/p>\n<p style=\"font-weight: 400;\">\u201cModernizing this converter station is essential to strengthening the long\u2011term performance and reliability of one of the most heavily used rail corridors in the country,\u201d said\u00a0STV Vice President and Engineering Chief Brandon Swartley. \u201cOur team brings the technical judgment and systems expertise needed to deliver upgrades that keep passengers moving and help to continue to enhance Amtrak\u2019s traction power network.\u201d<\/p>\n<p>STV has supported Amtrak on\u00a0several transformative programs, including design upgrades at\u00a0<a href=\"https:\/\/www.masstransitmag.com\/technology\/facilities\/news\/55336852\/stv-group-inc-stv-amtrak-break-ground-on-ivy-city-yard-modernization-project\" target=\"_blank\" rel=\"noopener nofollow\">Ivy City Yard<\/a>\u00a0in Washington, D.C.; project management and construction management (PM\/CM) services for the\u00a0<a href=\"https:\/\/www.masstransitmag.com\/rail\/infrastructure\/press-release\/55251248\/amtrak-amtrak-awards-two-contracts-for-its-sawtooth-bridges-replacement-project\" target=\"_blank\" rel=\"noopener nofollow\">Sawtooth Bridges Replacement<\/a>\u00a0project in Newark, N.J.; vehicle procurement of battery-electric passenger rail vehicles\u00a0in both New York City for the <a href=\"https:\/\/www.masstransitmag.com\/rail\/vehicles\/news\/55323095\/stv-group-inc-metro-north-railroad-contracts-stv-to-help-procure-13-sc42-dm-dual-powered-locomotives\" target=\"_blank\" rel=\"noopener nofollow\">Metropolitan Transportation Authority<\/a> and in Chicago <a href=\"https:\/\/www.masstransitmag.com\/rail\/vehicles\/press-release\/55269122\/stv-group-inc-metra-selects-stv-to-provide-procurement-support-for-new-all-electric-battery-powered-trainsets\" target=\"_blank\" rel=\"noopener nofollow\">for Metra<\/a>; and traction power and railway systems engineering for the\u00a0<a href=\"https:\/\/www.masstransitmag.com\/management\/news\/55388414\/gateway-program-hudson-tunnel-project-funding-restored-by-federal-judge\" target=\"_blank\" rel=\"noopener nofollow\">Gateway Hudson River Tunnel Project<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"Amtrak has selected STV to create the preliminary design to replace static frequency converter (SFC) #4 at the&hellip;\n","protected":false},"author":2,"featured_media":249397,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[69,71,70],"class_list":["post-249396","post","type-post","status-publish","format-standard","has-post-thumbnail","category-philadelphia","tag-philadelphia","tag-philadelphia-headlines","tag-philadelphia-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/249396","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/comments?post=249396"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/249396\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media\/249397"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media?parent=249396"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/categories?post=249396"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/tags?post=249396"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}