{"id":261992,"date":"2026-08-09T07:26:25","date_gmt":"2026-08-09T07:26:25","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-pa\/261992\/"},"modified":"2026-08-09T07:26:25","modified_gmt":"2026-08-09T07:26:25","slug":"peoples-natural-gas-to-replace-pipelines-in-2-pittsburgh-neighborhoods-through-spring-2027-2","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-pa\/261992\/","title":{"rendered":"Peoples Natural Gas to replace pipelines in 2 Pittsburgh neighborhoods through spring 2027"},"content":{"rendered":"<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">PITTSBURGH \u2014 Peoples Natural Gas will begin an infrastructure modernization project Monday in parts of Pittsburgh\u2019s Lawrenceville and the Strip District neighborhoods.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">The project will replace pipelines dating back to the 19th century with new lines on Mulberry Way and Smallman Street.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">The work involves installing 5,600 feet of new mainline as part of the company\u2019s Long-Term Infrastructure Improvement Plan. This ongoing initiative aims to upgrade more than 4,000 miles of pipelines to improve safety and service reliability while lowering greenhouse gas emissions.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">The project focuses on retiring a pipeline on Mulberry Way that was installed in 1887. The existing line, which stretches from 32nd Street to 38th Street, will be replaced by two distinct sections of modern materials. <\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Crews will install approximately 1,800 feet of small-diameter plastic mainline on Mulberry Way between 31st and 38th streets. <\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Another 3,850 feet of large-diameter steel mainline will be placed on Smallman Street from 32nd to 38th streets, along with additional stretches on 38th, Charlotte, 36th and 32nd streets.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">\u201cInstalling new, modern infrastructure to serve businesses and residents is important for the long-term prosperity of our region,\u201d said Paul Becker, vice president of construction and engineering for Peoples Natural Gas. \u201cWe strive to minimize construction impacts while ensuring the safety and reliability of natural gas service now and for many years to come.\u201d<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Construction is divided into segments to limit traffic restrictions. Work will initially begin on 32nd Street between Mulberry Way and Smallman Street, as well as on Mulberry Way between 32nd and 33rd streets. <\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Traffic control measures will be active whenever crews are on-site. Scheduled work hours are 7 a.m. to 5 p.m. Monday through Friday, with occasional shifts on Saturdays as permitted by city permits.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">The pipeline installation is scheduled to continue through spring 2027. Following the completion of construction, Peoples will schedule the restoration portion of the project to repair affected streets, sidewalks and landscapes to their prior condition.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Download the <a href=\"https:\/\/www.wpxi.com\/mobile-apps\/\" rel=\"nofollow noopener\" target=\"_blank\">FREE WPXI News app<\/a> for breaking news alerts.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Follow Channel 11 News on <a href=\"https:\/\/www.facebook.com\/wpxi\" rel=\"nofollow noopener\" target=\"_blank\">Facebook<\/a> and <a href=\"https:\/\/twitter.com\/WPXI\" rel=\"nofollow noopener\" target=\"_blank\">Twitter<\/a>. | <a href=\"https:\/\/www.wpxi.com\/video\/\" rel=\"nofollow noopener\" target=\"_blank\">Watch WPXI NOW<\/a><\/p>\n<p>TOP STORIES FROM CHANNEL 11 NEWS <\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph body-copyright\">\u00a92026 Cox Media Group<\/p>\n<p><script async src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><\/p>\n","protected":false},"excerpt":{"rendered":"PITTSBURGH \u2014 Peoples Natural Gas will begin an infrastructure modernization project Monday in parts of Pittsburgh\u2019s Lawrenceville and&hellip;\n","protected":false},"author":2,"featured_media":191061,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[73,75,74],"class_list":["post-261992","post","type-post","status-publish","format-standard","has-post-thumbnail","category-pittsburgh","tag-pittsburgh","tag-pittsburgh-headlines","tag-pittsburgh-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/261992","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/comments?post=261992"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/261992\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media\/191061"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media?parent=261992"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/categories?post=261992"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/tags?post=261992"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}