{"id":309912,"date":"2026-10-19T15:36:09","date_gmt":"2026-10-19T15:36:09","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-pa\/309912\/"},"modified":"2026-10-19T15:36:09","modified_gmt":"2026-10-19T15:36:09","slug":"chick-fil-a-in-palmer-township-the-restaurants-status-after-receiving-key-approval","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-pa\/309912\/","title":{"rendered":"Chick-fil-A in Palmer Township: The restaurant\u2019s status after receiving key approval"},"content":{"rendered":"<p class=\"article__paragraph article__paragraph--left\" id=\"CJ2E4JYBHBDGLMXPAHNQ5TUCXU\"><a href=\"https:\/\/www.lehighvalleylive.com\/easton\/2026\/08\/why-a-proposed-chick-fil-a-was-tabled-by-palmer-township-planners.html\" target=\"_blank\" rel=\"nofollow noopener\">A Chick-fil-A location in Palmer Township<\/a> may soon become a reality after receiving a key approval. <\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"4KLJOYS5P5D5LJZGXVYLOGSBWY\">The Palmer Township Planning Commission recently recommended that the Board of Supervisors grant conditional approval to the proposed restaurant at <a href=\"https:\/\/maps.app.goo.gl\/oRSV9qviNfUA1KDD8\" target=\"_blank\" rel=\"nofollow noopener\">601 S. 25th St.<\/a> at the intersection of William Penn Highway and South 25th Street. It was home to a <a href=\"https:\/\/www.lehighvalleylive.com\/easton\/2023\/08\/easton-rite-aid-location-to-close-in-early-september.html\" target=\"_blank\" rel=\"nofollow noopener\" title=\"https:\/\/www.lehighvalleylive.com\/easton\/2023\/08\/easton-rite-aid-location-to-close-in-early-september.html\">former Rite Aid<\/a>, which closed about three years ago. <\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"YSX324KMH5AX7A5UUUQMONOY3M\">The proposal calls for demolishing the existing building and replacing it with a 5,483-square-foot Chick-fil-A restaurant. The plans include 90 indoor seats, two drive-thru lanes designed to accommodate a combined queue of 38 vehicles, and parking for 65 vehicles.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"FCMBAA674ZFLLLUGVX6WHINHGE\"><a href=\"https:\/\/palmertwp.sharepoint.com\/sites\/TownshipofPalmer\/PlanningCommission\/Documents\/Forms\/AllItems.aspx?id=%2Fsites%2FTownshipofPalmer%2FPlanningCommission%2FDocuments%2FPublic%20Plan%20Set%20Folder%2FChick%2Dfil%2DA%20%28601%20S%2025th%20St%29%20%2D%20Revised%2007%2D13%2D2026%2Epdf&amp;parent=%2Fsites%2FTownshipofPalmer%2FPlanningCommission%2FDocuments%2FPublic%20Plan%20Set%20Folder&amp;p=true&amp;ga=1\" target=\"_blank\" rel=\"nofollow noopener\">The latest plans<\/a> call for vehicles to enter and exit the property from the west side of the lot, with access to the surrounding shopping center from either William Penn Highway or South 25th Street.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"PU4NFUEYYJEM3HVUZQXW3EFZH4\"><a href=\"https:\/\/palmertwp.granicus.com\/ViewPublisher.php?view_id=1\" target=\"_blank\" rel=\"nofollow noopener\">The Board of Supervisors<\/a> will consider final approval of the land development plan.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"IKMLTBF6NVGURIYQA5VICEXIAQ\">The recommendation follows earlier delays as the developer worked to address township concerns. The project received special exception approval for a drive-thru restaurant and variances allowing 65 parking spaces and five wall signs from the township\u2019s Zoning Hearing Board in October 2025.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"R7ANR56JW5EDHP3OABMZE77X5U\">The Planning Commission first considered the land development plan in November 2025, voting to accept the application but table it for further consideration.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"CS44KYWPYBBG3O2GRATP5XOZ24\">This past summer, the proposal faced an additional delay when the developer asked the commission to table the application while it addressed issues raised by the township. <\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"RBTCPUHXP5DJRCBWWYFLSJNI24\">Township Planning Director Craig Beavers previously said the outstanding items included revisions to stormwater management plans, updated landscaping and lighting compliance charts, and documentation of reviews by outside agencies.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"M2ZCOKPGT5FSJNVHFKR7UVISSI\"><a href=\"https:\/\/d3n9y02raazwpg.cloudfront.net\/palmertwp\/be926106-9566-11f0-8df7-005056a89546-216fd76e-f840-4715-9ccc-69bc359dd88e-1791395574.pdf\" target=\"_blank\" rel=\"nofollow noopener\">The township\u2019s latest review<\/a> indicates that remaining technical issues can be addressed as conditions of approval.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"LZD6PFW6BFHZRAAVGBEMJGGRCM\">Beavers said the developer has not given an estimated opening date. Following potential Board of Supervisors approval, he said construction could take four to six months to begin. <\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"NS6CXWLCYJD4DDPBOPQLG2U7BM\"><a href=\"https:\/\/www.lehighvalleylive.com\/easton\/2025\/08\/chik-fil-a-is-proposed-in-palmer-township-will-it-be-safe.html\" target=\"_blank\" rel=\"nofollow noopener\">Traffic<\/a> and roadway access are among the key elements of the proposal. The plans call for reconfiguring the property\u2019s driveway access along William Penn Highway, as well as installing a crosswalk with a more direct route across the driveway to improve pedestrian safety.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"E7KOBXFFKNFWJPAVFORKXFGH7A\">The township\u2019s engineering consultant also recommends a sidewalk connection on the property leading to the driveway entrance. The developer must provide a streetlight at the intersection of William Penn Highway and the restaurant\u2019s access driveway.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"MY56RYD4NFG75CFQ3I3NR6TC3I\">The plans also include pedestrian-scale ornamental streetlights along William Penn Highway. The township\u2019s review calls for additional work on the driveway crosswalk and other site details before the plans can be finalized.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"SLPOE3Q4KZAH7AYIH54IHSDORU\">The project would also add transportation options beyond driving. Plans include a landing pad and loading area for a Lehigh and Northampton Transportation Authority bus rapid transit station along William Penn Highway, with an accessible loading pad required under the authority\u2019s review comments.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"MTHCDU6MTZGDXKE3NVVJFUTYUY\">The stop is intended to support LANTA\u2019s planned EBS Blue Line service, which is expected to provide frequent bus service between Easton and Trexlertown. The project also includes a bicycle rack and a pedestrian connection along South 25th Street.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"LNKU36EQNFDR3KKV5R3B2F7JPQ\">The township\u2019s review indicates that the proposal generally aligns with the municipality\u2019s transportation goals, which call for safer connections among businesses, neighborhoods, sidewalks, bicycle routes and transit stops. The review also recommended considering a pedestrian connection along William Penn Highway.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"XIEEBIJYFZCDBEF3YOKW5AF2FE\">Other planned improvements include enhanced landscaping, a \u201cWelcome to Palmer Township\u201d sign along the property\u2019s frontage and changes to the site\u2019s utility and stormwater plans.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"TS4KEGNNHBGMPPSL3BSWFBMFOE\">Before construction can begin, the developer must satisfy a series of conditions, including obtaining required permits, securing approval of stormwater and erosion-control plans, and addressing comments from township engineers, consultants, staff and LANTA.<\/p>\n<p class=\"article__paragraph article__paragraph--left\" id=\"WFJWPZPJZBDSDCUBERR7G52HGI\">The township also requires a $9,570 payment in lieu of dedicating open space, based on the property\u2019s 1.74 acres. <\/p>\n","protected":false},"excerpt":{"rendered":"A Chick-fil-A location in Palmer Township may soon become a reality after receiving a key approval. The Palmer&hellip;\n","protected":false},"author":2,"featured_media":309913,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[153,155,154],"class_list":["post-309912","post","type-post","status-publish","format-standard","has-post-thumbnail","category-bethlehem","tag-bethlehem","tag-bethlehem-headlines","tag-bethlehem-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/309912","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/comments?post=309912"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/309912\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media\/309913"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media?parent=309912"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/categories?post=309912"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/tags?post=309912"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}