{"id":313809,"date":"2026-10-25T06:36:23","date_gmt":"2026-10-25T06:36:23","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-pa\/313809\/"},"modified":"2026-10-25T06:36:23","modified_gmt":"2026-10-25T06:36:23","slug":"alcosan-breaks-ground-on-4-9-mile-ohio-river-tunnel-project-in-pittsburgh-2","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-pa\/313809\/","title":{"rendered":"ALCOSAN breaks ground on 4.9-mile Ohio River Tunnel project in Pittsburgh"},"content":{"rendered":"<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">PITTSBURGH \u2014 The Allegheny County Sanitary Authority (ALCOSAN) broke ground on the 4.9-mile Ohio River Tunnel project in Pittsburgh, aiming to reduce regional sewer overflows by 7 billion gallons per year.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">The tunnel is the first component of ALCOSAN\u2019s Regional Tunnel System. The underground network is designed to capture excess wastewater during wet weather and transport it to a central facility for treatment.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">The project forms a central part of the authority\u2019s Clean Water Plan to update regional wastewater infrastructure and improve local water quality.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">The 4.9-mile main tunnel will run from Pittsburgh\u2019s North Shore to ALCOSAN\u2019s wastewater treatment plant. Smaller connecting tunnels will link to the main line, capturing wastewater flows from the Saw Mill Run and Chartiers Creek areas. <\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Work will take place across eight construction sites, including six within Pittsburgh and two in McKees Rocks.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">\u201cThis groundbreaking is more than the start to construction,\u201d ALCOSAN Executive Director Arletta Scott Williams said during the groundbreaking ceremony at the AS1 construction site. \u201cArriving at this day required grit, determination and commitment from countless people. Today is a day to celebrate, but we also know there is work ahead. We have the people, the expertise and the resolve to carry us through the next phase and I am incredibly proud of the work that\u2019s been done to get us here.\u201d<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">The project is part of ALCOSAN\u2019s Clean Water Plan, an initiative that integrates treatment plant expansion, regionalization and green infrastructure through its GROW program. <\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">The authority recently reached a <a href=\"https:\/\/www.wpxi.com\/news\/local\/alcosan-boosts-wet-weather-treatment-capacity-480m-gallons-expected-slash-sewer-overflows\/X7K6OSZZNNBBDKCAFNMWXMKVXM\/\" target=\"_blank\" rel=\"noreferrer nofollow noopener\" title=\"https:\/\/www.wpxi.com\/news\/local\/alcosan-boosts-wet-weather-treatment-capacity-480m-gallons-expected-slash-sewer-overflows\/X7K6OSZZNNBBDKCAFNMWXMKVXM\/\">treatment capacity of 480 million gallons per day<\/a>, satisfying a compliance target under a federal Consent Decree. Authority officials expect the expanded daily capacity to reduce an additional 3.4 billion gallons of sewer overflows annually.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Contractor Steel City Tunnel Partners will begin drilling the first access shafts at the construction site. The drilling prepares the location for the arrival of a Tunnel Boring Machine scheduled late next year.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Download the <a href=\"https:\/\/www.wpxi.com\/mobile-apps\/\" rel=\"nofollow noopener\" target=\"_blank\">FREE WPXI News app<\/a> for breaking news alerts.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Follow Channel 11 News on <a href=\"https:\/\/www.facebook.com\/wpxi\" rel=\"nofollow noopener\" target=\"_blank\">Facebook<\/a> and <a href=\"https:\/\/twitter.com\/WPXI\" rel=\"nofollow noopener\" target=\"_blank\">Twitter<\/a>. | <a href=\"https:\/\/www.wpxi.com\/video\/\" rel=\"nofollow noopener\" target=\"_blank\">Watch WPXI NOW<\/a><\/p>\n<p>TOP STORIES FROM CHANNEL 11 NEWS <\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph body-copyright\">\u00a92026 Cox Media Group<\/p>\n<p><script async src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><\/p>\n","protected":false},"excerpt":{"rendered":"PITTSBURGH \u2014 The Allegheny County Sanitary Authority (ALCOSAN) broke ground on the 4.9-mile Ohio River Tunnel project in&hellip;\n","protected":false},"author":2,"featured_media":313810,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[102215,894,82299,13413,128105,73,75,74,76884,128106,37568],"class_list":["post-313809","post","type-post","status-publish","format-standard","has-post-thumbnail","category-pittsburgh","tag-alcosan","tag-allegheny-county","tag-allegheny-county-sanitary-authority","tag-ohio-river","tag-ohio-river-tunnel","tag-pittsburgh","tag-pittsburgh-headlines","tag-pittsburgh-news","tag-sewer","tag-sewer-overflow","tag-tunnel"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/313809","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/comments?post=313809"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/313809\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media\/313810"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media?parent=313809"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/categories?post=313809"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/tags?post=313809"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}