{"id":34380,"date":"2025-11-14T18:43:46","date_gmt":"2025-11-14T18:43:46","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-pa\/34380\/"},"modified":"2025-11-14T18:43:46","modified_gmt":"2025-11-14T18:43:46","slug":"long-term-closure-of-commercial-street-to-begin-this-month-for-parkway-east-bridge-construction-wpxi","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-pa\/34380\/","title":{"rendered":"Long-term closure of Commercial Street to begin this month for Parkway East bridge construction \u2013 WPXI"},"content":{"rendered":"<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">PITTSBURGH \u2014 A long-term closure of Commercial Street and Nine Mile Run Trail in Pittsburgh will begin this month.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Starting at approximately 7 a.m. on Monday, Nov. 24, Commercial Street\/Forward Avenue will close to traffic between Whipple Street and Summerset Drive.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">During this time, the Nine Mile Run Trail will close to all bicycle and pedestrian traffic between the Nine Mile Run parking lot on the Swisshelm Park side and the Frick Park Commercial Street Parking lot on the Squirrel Hill side.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">The closure will last until Feb. 6, as crews work on constructing the new Commercial Street Bridge.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Drivers will be detoured from Commercial Street on the Swisshelm Park side by turning onto Whipple Street, then left onto Monongahela Avenue, left onto South Braddock Avenue, left onto Forbes Avenue, left onto Beechwood Boulevard, and continuing to Forward Avenue.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">The same detour applies in the opposite direction from Forward Avenue on the Squirrel Hill side.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Construction involves transporting cranes, lifting beams and relocating other heavy material over the roadway and trail, necessitating the closure for public safety.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">The long-term closure of Commercial Street\/Forward Avenue and Nine Mile Run Trail is essential for the safe completion of the new bridge structure, impacting traffic patterns in the area for over two years.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Editor\u2019s Note: This story has been edited after PennDOT changed the project\u2019s schedule. The closure was originally set to begin Monday, Nov. 17, and end Jan. 30.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Download the <a href=\"https:\/\/www.wpxi.com\/mobile-apps\/\" rel=\"nofollow noopener\" target=\"_blank\">FREE WPXI News app<\/a> for breaking news alerts.<\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph\">Follow Channel 11 News on <a href=\"https:\/\/www.facebook.com\/wpxi\" rel=\"nofollow noopener\" target=\"_blank\">Facebook<\/a> and <a href=\"https:\/\/twitter.com\/WPXI\" rel=\"nofollow noopener\" target=\"_blank\">Twitter<\/a>. | <a href=\"https:\/\/www.wpxi.com\/video\/\" rel=\"nofollow noopener\" target=\"_blank\">Watch WPXI NOW<\/a><\/p>\n<p>TOP STORIES FROM CHANNEL 11 NEWS <\/p>\n<p class=\"default__StyledText-sc-tl066j-0 gJuxXh body-paragraph body-copyright\">\u00a92025 Cox Media Group<\/p>\n<p><script async src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><\/p>\n","protected":false},"excerpt":{"rendered":"PITTSBURGH \u2014 A long-term closure of Commercial Street and Nine Mile Run Trail in Pittsburgh will begin this&hellip;\n","protected":false},"author":2,"featured_media":5027,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[894,21459,7188,21450,577,21453,3727,21449,20507,53,19339,4630,21454,9857,21457,21460,21451,12186,1730,1020,3431,73,75,74,4582,21458,21456,21455,1704,21452,7212],"class_list":["post-34380","post","type-post","status-publish","format-standard","has-post-thumbnail","category-pittsburgh","tag-allegheny-county","tag-beechwood-boulevard","tag-bicycle","tag-bridge","tag-closed","tag-closre","tag-closure","tag-commercial-street","tag-commercial-street-bridge","tag-construction","tag-crane","tag-detour","tag-february","tag-forbes-avenue","tag-forward-avenue","tag-monongahela-avenue","tag-nine-mile-run","tag-november","tag-parkway-east","tag-pedestrian","tag-penndot","tag-pittsburgh","tag-pittsburgh-headlines","tag-pittsburgh-news","tag-project","tag-south-braddock-avenue","tag-summerset-drive","tag-swisshelm-park","tag-traffic","tag-whipple-street","tag-work"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/34380","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/comments?post=34380"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/34380\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media\/5027"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media?parent=34380"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/categories?post=34380"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/tags?post=34380"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}