{"id":77779,"date":"2026-01-04T21:21:06","date_gmt":"2026-01-04T21:21:06","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-pa\/77779\/"},"modified":"2026-01-04T21:21:06","modified_gmt":"2026-01-04T21:21:06","slug":"sunlive-detours-and-delays-for-bethlehem-traffic","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-pa\/77779\/","title":{"rendered":"SunLive &#8211; Detours and delays for Bethlehem traffic"},"content":{"rendered":"<p>A major upgrade of the SH29\/Cambridge Road intersection has triggered a month\u2011long northbound lane closure.<\/p>\n<p>NZ Transport Agency Waka Kotahi has ramped up construction works as part of its \u2018Super January\u2019 push to advance the Tauriko Enabling Works project.<\/p>\n<p>Infrastructure delivery acting regional manager Darryl Coalter said the approach would include removing temporary sheet piles, earthworks, relocating utilities, road construction and resurfacing.<\/p>\n<p>\u201cTo do this safely, we\u2019ll need to close a short section of the northbound lane on Cambridge Road, from the SH29 intersection to 579 Cambridge Rd.\u201d<\/p>\n<p>The closure was put in place on Saturday, January 3, and was expected to be in place until early February.<\/p>\n<p>\u201cAll Bethlehem-bound vehicles will need to detour via SH29 Takitimu Drive Toll Rd or SH29A and Cameron Rd. The southbound lane will remain open,\u201d Coalter said.<\/p>\n<p>\u201cWe appreciate this would cause some disruption, so we\u2019re committed to working extended hours to minimise the overall impact. This short-term inconvenience will mean less disruptions in the future.\u201d<\/p>\n<p>Work would take place seven days a week, with some extended shifts (7am to 12am) and night works (6pm to 5am).<\/p>\n<p>The intersection upgrade began in late 2024 with construction of a 210-metre retaining wall, supported by temporary sheet piles.<\/p>\n<p>The first stage of sheet pile removal is already underway behind safety barriers with no traffic impact.<\/p>\n<p>In early January, removal would continue in the narrower section of Cambridge Road, requiring the lane closure.<\/p>\n<p>Once January works were complete, Coalter said the team would focus on road widening and pavement construction.<\/p>\n<p>He said the full upgrade would deliver a safer, more efficient intersection for all road users, with completion expected in 2027.<\/p>\n<p>What you need to know:<\/p>\n<p>Cambridge Road northbound lane 24\/7 closure from Saturday, January 3, and reopens early February, ahead of the school year commencing.<\/p>\n<p>Northbound detour: Bethlehem-bound traffic via SH29 Takitimu Drive Toll Road (adds 15 mins, toll applies) or SH29A\/Cameron Road (adds 22 mins, free route).<\/p>\n<p>Cambridge Road southbound lane: Remains open.<\/p>\n<p>Cambridge Road right-turn bay closure: Cambridge Road to SH29 \u2013 Kaimai Range\/Hamilton-bound traffic must turn left onto SH29, then use SH29\/SH36 roundabout to change direction.<\/p>\n<p>Temporary speed limits: 60km\/h on SH29 approaches; 30km\/h on Cambridge Road near the work site.<\/p>\n<p>Resident access: Via detours; vehicles exiting driveways within the closure must turn left onto SH29 and follow the detour.<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"A major upgrade of the SH29\/Cambridge Road intersection has triggered a month\u2011long northbound lane closure. NZ Transport Agency&hellip;\n","protected":false},"author":2,"featured_media":77780,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[153,155,154],"class_list":{"0":"post-77779","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-bethlehem","8":"tag-bethlehem","9":"tag-bethlehem-headlines","10":"tag-bethlehem-news"},"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/77779","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/comments?post=77779"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/77779\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media\/77780"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media?parent=77779"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/categories?post=77779"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/tags?post=77779"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}