{"id":85632,"date":"2026-01-13T16:29:07","date_gmt":"2026-01-13T16:29:07","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-pa\/85632\/"},"modified":"2026-01-13T16:29:07","modified_gmt":"2026-01-13T16:29:07","slug":"ruling-on-8-apartments-in-bethlehem-deferred-elevations-submitted-were-from-project-across-town","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-pa\/85632\/","title":{"rendered":"Ruling on 8 apartments in Bethlehem deferred; elevations submitted were from project across town"},"content":{"rendered":"<p>BETHLEHEM, Pa. \u2014 City planners are taking a 30-day extension to further review land development plans for a 3 1\/2-story, eight-unit apartment building proposed for West Union Boulevard.<\/p>\n<p>Planners on Thursday weren\u2019t comfortable giving the project the green light, as the property owner, Nicholas Bozakis, and his team submitted elevations and architectural details from a different, yet mostly similar, project from across town drawn up by the same architect.<\/p>\n<p>Now, officials will look to render a decision by Feb. 28.<\/p>\n<p>Planners next meet at 5 p.m. Feb. 12 in Bethlehem Town Hall, 10 E. Church. St.<\/p>\n<p>&#8216;Just slight modification&#8217; needed<\/p>\n<p>Bozakis owns Nick\u2019s on Main Italian restaurant about a block away from the proposed project site at 62-68 W. Union Blvd.<\/p>\n<p>Bozakis\u2019s townhome project nearby calls for demolishing 68 W. Union \u2014 62 W. Union previously was razed \u2014 to put up <a class=\"Link\" href=\"https:\/\/www.bethlehem-pa.gov\/getattachment\/calendar-planning-zoning\/Meetings\/2026\/Planning-Commission\/Planning-Commission-01-08-2026\/62-68-West-Union-Boulevard-LD-Plan-Set-12-1-25.pdf.aspx?lang=en-US\" target=\"_blank\" rel=\"nofollow noopener\">a multi-family building<\/a> with eight apartments, 13 off-street parking spaces and vehicle access from Masslich Street to the east.<\/p>\n<p>However, city officials said the submitted architectural elevations were \u201clabeled as and reflective\u201d of <a class=\"Link\" href=\"https:\/\/www.bethlehem-pa.gov\/getattachment\/calendar-planning-zoning\/Meetings\/2026\/Planning-Commission\/Planning-Commission-01-08-2026\/Building-Plans-6-(or-8)-Unit-Apartments.pdf.aspx?lang=en-US\" target=\"_blank\" rel=\"nofollow noopener\">another six-unit project at 1275 E. Fourth St.<\/a>, owned by Macada Partners of Bethlehem.<\/p>\n<p>That project was about 2 1\/2 miles from the applicant\u2019s project site just a short ways off Main Street.<\/p>\n<p>Plans for both sites were completed by the same architect: Christian Architects of Nazareth.<\/p>\n<p>    \u201cTheir building very closely represents what\u2019s proposed here at this site.&#8221;<\/p>\n<p>Kevin Horvath, project design engineer with Keystone Consulting Engineers<\/p>\n<p>Kevin Horvath, project design engineer with Keystone Consulting Engineers, said his team provided plans for a 3.5-story building with the same dimensions as the one proposed for the site on West Union.<\/p>\n<p>He said the new project would almost match the other, with three stories in the front and 3 1\/2 in the back, and have the same number of windows, a central hallway and slab patio outside.<\/p>\n<p>But instead of the garage and two exterior doors as in the East Fourth Street site, Horvath said the West Union building\u2019s lower level would feature two additional apartments.<\/p>\n<p>\u201cTheir building very closely represents what\u2019s proposed here at this site,\u201d Horvath said. \u201cIt\u2019s a slight modification to convert what\u2019s [shown in the drawings], a garage and storage, to two additional dwelling units.\u201d<\/p>\n<p>Horvath also said Bozakis was \u201chappy to provide\u201d a curb ramp at the northeast corner of the site, per request from the city. The project also will come with improvements to the site&#8217;s front and rear sidewalks.<\/p>\n<p>&#8216;To be in-keeping with neighborhood context&#8217;<\/p>\n<p>In <a class=\"Link\" href=\"https:\/\/www.bethlehem-pa.gov\/getattachment\/calendar-planning-zoning\/Meetings\/2026\/Planning-Commission\/Planning-Commission-01-08-2026\/Review-Letter-2025-12-31_Redacted.pdf.aspx?lang=en-US\" target=\"_blank\" data-cms-ai=\"0\" rel=\"nofollow noopener\">a project review letter from the city<\/a>, Assistant Director Planning and Zoning Craig Pfeiffer said officials notified the applicant to submit proper plans for the site ahead of the meeting on Thursday, Jan. 8.<\/p>\n<p>The front of the building should be built \u201cto be in-keeping with neighborhood context in terms of massing, fa\u00e7ade materials and a visual and physical break between the second and third floors,\u201d Pfeiffer said in the letter.<\/p>\n<p>    \u201cI would need to see a clearer rendering of what this is going to look like to feel confident. I can\u2019t just base it off of a different project.&#8221;<\/p>\n<p>Bethlehem City Planning Commission member Richard Pongracz<\/p>\n<p>Planning officials, nervous of setting a precedent for future developments, said they did not want to provide an approval on Thursday without the proper plans in hand.<\/p>\n<p>\u201cCertainly it seems like there was adequate time from December 31st to today to submit the architectural plans and elevations as it pertains to the project on West Union,\u201d planning Chairman Robert Melosky said.<\/p>\n<p>Planner Richard Pongracz said, \u201cI would need to see a clearer rendering of what this is going to look like to feel confident. <\/p>\n<p>&#8220;I can\u2019t just base it off of a different project,\u201d he said.<\/p>\n<p>&#8216;Out of no disrespect&#8217;<\/p>\n<p>Joy Cohen, another member of the Planning Commission, said it was her understanding the project documents were submitted without the architect\u2019s knowledge.<\/p>\n<p>Bozakis said that wasn\u2019t the case, and he actually planned to meet with the architect again that evening.<\/p>\n<p>Horvath said it was all a misunderstanding on his part, adding that the city\u2019s development procedures were \u201cunique.\u201d Potential revisions of plans along the way can get costly, he said.<\/p>\n<p>Bozakis \u201chas had every intention of developing these plans further with the architect of record,\u201d Horvath said.<\/p>\n<p>    \u201cHonestly, I really didn\u2019t think it was that big of a stretch in terms of what we\u2019re proposing and to provide an adequate representation of that using this drawing.&#8221;<\/p>\n<p>Kevin Horvath, project design engineer with Keystone Consulting Engineers<\/p>\n<p>\u201cHonestly, I really didn\u2019t think it was that big of a stretch in terms of what we\u2019re proposing and to provide an adequate representation of that using this drawing,\u201d Horvath said.<\/p>\n<p> \u201cIt was out of no disrespect whatsoever that we didn\u2019t do this.\u201d<\/p>\n<p>Horvath said they would submit the proper renderings to the panel for review and allow the 30-day extension.<\/p>\n<p>As land development plans were submitted on Oct. 31, and project applicants are entitled to a decision from planners within 90 days, the planning commission would have had to vote Thursday unless given an extension by the developers, according to planning commission solicitor Matthew Deschler.<\/p>\n<p>\u201cWe\u2019ll see you in a month,\u201d Melsoky said to Horvath and Bozakis.<\/p>\n","protected":false},"excerpt":{"rendered":"BETHLEHEM, Pa. \u2014 City planners are taking a 30-day extension to further review land development plans for a&hellip;\n","protected":false},"author":2,"featured_media":85633,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[42836,153,628,155,154,21220,3488,42837,42838,42839,42840,42841,41426],"class_list":{"0":"post-85632","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-bethlehem","8":"tag-62-68-west-union-boulevard","9":"tag-bethlehem","10":"tag-bethlehem-city-planning-commission","11":"tag-bethlehem-headlines","12":"tag-bethlehem-news","13":"tag-joy-cohen","14":"tag-main-street-bethlehem","15":"tag-main-street-townhomes","16":"tag-new-development-in-bethlehem","17":"tag-nicholas-bozakis","18":"tag-nicks-on-main","19":"tag-nicks-on-main-italian","20":"tag-robert-melosky"},"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/85632","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/comments?post=85632"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/posts\/85632\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media\/85633"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/media?parent=85632"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/categories?post=85632"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-pa\/wp-json\/wp\/v2\/tags?post=85632"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}