EL PASO, Texas (KTSM) — The Texas Department of Transportation has released a list of road closures for the week of Feb. 6, 2026, including alternate road closures near Vinton and full lane closures on Loop 375 near Zaragoza.

I-10 Widening West

Saturday, Feb. 7 to Saturday, Feb. 14, from 9 a.m. to 4 p.m. (as needed weekly) and from 7 a.m. to 5 p.m. (Saturday as needed).

North and South Desert between Vinton and Mesa alternate lane closures.

Crews will be working on miscellaneous construction work.

I-10 east and westbound between Vinton and Mesa (daily) alternate lane closures.

Crews will be sweeping, striping, power washing, and painting barrier on I-10.

Monday, Feb. 9 to Saturday, Feb. 14, from 9 a.m. to 4 p.m.

Redd westbound between North Desert and South Desert right lane closed.

Crews will be placing concrete median, riprap, and painting Redd bridge over turnaround lane.

Tuesday, Feb. 10 to Thursday, Feb. 12, from 9 a.m. to 4 p.m.

South Desert to North Desert Turnaround at Mesa closed.

Crews will be sweeping and striping frontage roads.

Loop 375 Widening Project

Sunday, Feb. 8 to Thursday, Feb. 12, nightly from 9 p.m. to 5 a.m.

Loop 375 southbound main lanes closed between I-10 and Zaragoza (Port of Entry).

Crews will be working on ride quality operations.

Monday, Feb. 9 to Friday, Feb. 13, daily from 9 a.m. to 4 p.m.

Loop 375 north and southbound alternating lane closures between I-10 and Padres Drive.

Americas Avenue (frontage road) north and southbound alternating lane closures between I-10 and Padres Drive.

Crews will be working on installing miscellaneous items, clean-up and striping.

Road Repair

Sunday, Feb. 8, from 6 a.m. to noon

Oregon bridge right lane closed

9 a.m. to 4 p.m.

Monday, Feb. 9 to Tuesday, Feb. 10

US-62/180 Paisano eastbound at Cordova International Bridge alternate lane closure.

Wednesday, February 11

SH-20 (Doniphan) east and westbound between Mesa and Sunset alternate lane closure.

Crews will be working on spall.

Bridge Maintenance Project

Sunday, Feb. 8 to Monday, Feb. 9, nightly from 9 p.m. to 5 a.m.

I-110 northbound connector to I-10 eastbound closed.

US 54 southbound connector to I-10 eastbound closed.

I-10 East exit 23A will be closed.

Crews will be performing maintenance work on bridge.

Tuesday, Feb. 10 to Friday, Feb. 13, nightly from 9 p.m. to 5 p.m.

US 54 eastbound Montana Exit and Entrance Ramp closed.

Crews will be performing maintenance work on bridge.

I-10 Widening West 2

Monday, Feb. 9 through Saturday, Feb. 14, from 9 a.m. to 4 p.m. (Daily) and from 9 p.m. to 6 a.m. (Nightly).

I-10 east and westbound between Anthony and Nashua alternate lane closures.

North and South Desert between Anthony and Nashua alternate lane closures.

Crews will be working on concrete paving and paving trucks will be exiting the work area.

Monday, Feb. 9 through Saturday, Feb. 14, from 9 a.m. to 4 p.m.

Bypass lanes east and westbound between Redd and Mesa closed.

Detour:

Traffic will continue along South Desert, through the Thorn Intersection, and enter I-10 before Mesa.

Traffic will continue along North Desert, through the Thorn Intersection, and enter I-10 before Redd.

Crews will be completing construction on an ornamental fence at Thorn.

Monday, Feb. 9 and Tuesday, Feb. 10, nightly from 9 p.m. to 6 a.m.

I-10 westbound between Vinton and Anthony closed.

Detour: Traffic will exit at Vinton, proceed onto South Desert through the Vinton and Anthony intersections, and enter I-10 westbound after Anthony.

I-10 westbound between Vinton and Anthony left lane closed.

Crews will be placing beams at Bridge D.

Artcraft

Monday, Feb. 9 to Friday, Feb. 13, from 9 a.m. to 4 p.m. (as needed)

SH-178 (Artcraft) east and westbound between New Mexico State Line and Doniphan alternate lane closures.

Crews will be working on illumination and wall installations.

North Desert between Helen of Troy and Cheddars Restaurant alternate lane closures.

South Desert between Charlie Clark Nissan and Blue-Sky alternate lane closures.

Crews will be loading and unloading material and equipment.

Wednesday, Feb. 11, from 9 p.m. to 6 a.m.

Upper Valley Intersection (two lanes northbound and one westbound lane).

Crews will be conducting a traffic switch.

Borderland Expressway Phase 2

Monday, Feb. 9 to Friday, Feb. 13, from 7 a.m. to 5 p.m.

US-54 east and westbound between Mesquite Hills and McCombs alternate lane closures.

Mesquite Hills reduced to one lane between US-54 and Red Man. Flaggers will be on-site directing traffic as needed for haul trucks crossing Mesquite Hills.

Flaggers will be on site directing traffic as needed for haul trucks crossing at McCombs and Stan Roberts.

Crews will be transporting earth embankment into the project.

Upcoming Closures

Beginning 4 a.m., Saturday, Feb. 21, to 6 a.m., Monday, Feb. 23 (50-hour closure)

Martin Luther King (FM-3255) north and south bound between Stan Roberts (FM-2529) and O’Hara Road (NM-404)

Local traffic will be allowed to access businesses and residences between O-Hara Road and the Texas/New Mexico State Line.

Traffic will be detoured using NM-404, I-10, Loop 375 (Woodrow Bean/Transmountain), and US-54.

Crews will be working on a traffic switch to allow for construction of Martin Luther King new road configuration.

Guardrail Repair

9 a.m. to 4 p.m.

Monday, Feb. 9

US-54 southbound between Altura and Montana right lane and on-ramp closed on CD Lanes to US-54.

Tuesday, Feb. 10

I-10 eastbound between Mesa and Sunland Park exit right lane closed.

Wednesday, Feb. 11

I-10 eastbound between Mesa and Sunland Park left lane closed.

Thursday, Feb. 12

Wyoming eastbound between Mesa and Kansas right lane closed.

Friday, Feb. 13

Desert North between Transmountain and Enchanted Springs left lane and on-ramp closed on Transmountain.

Purple Heart 375 Widening Project

Continuous closure beginning at 3 a.m. Saturday, Feb. 14 to 5 a.m. Monday, Feb. 16

Purple Heart Highway (Loop 375) northbound full closure from Montana Avenue and Spur 601.

Crews will be installing culverts.

Continuous closure beginning at 3 a.m. Saturday, Feb. 21 to 5 a.m. Monday, Feb. 23

Purple Heart Highway (Loop 375) northbound full closure from Montana Avenue and Spur 601.

Crews will be working on culvert installations.

Continuous closure beginning at 9 p.m. Saturday, Feb. 21 to 5 a.m. Sunday, Feb. 22

Purple Heart Highway (Loop 375) southbound full closure from Montana Avenue and Spur 601.

Crews will be installing overhead sign structures.

I-10 Landscape & Aesthetic Project

Monday, Feb. 9 to Friday, Feb. 13, daily from 9 a.m. to 4 p.m.

I-10 westbound right lane closure between Zaragoza Road and Lee Trevino Drive.

I-10 westbound right lane closure between Lomaland Drive and Yarbrough Drive.

Gateway West left lane closure at Zaragoza Road.

Crews will be installing lighting and placing steel structures.

Horizon/Darrington Reconstruction Project

Monday, Feb. 9 to Friday, Feb. 13, daily from 9 a.m. to 4 p.m.

Horizon Boulevard eastbound right lanes closed at Darrington Road intersection.

Darrington Road alternating north and southbound lane closures between Horizon Boulevard and Pawling Drive.

Crews will be working on electrical work in islands in intersection.

Continuous closure until Friday, March 13 at 4 p.m.

Darrington Road southbound full closure between Horizon Boulevard and Homestead Drive.

Crews will be working on southbound Darrington Road.

Continuous closure until March 2026

Pete La Rue Circle will follow detour entrance and exit at Roslyn Drive.

Crews will be working on storm culverts, final subgrade, pavement operations and milling.