Fire Station No. 8 Grand Opening | City of Arlington, TX
opens in new tab or window
You Are Here :
Home
/
Fire Station No. 8 Grand Opening
Next date:Â Friday, February 20, 2026 | 02:00 PM
to 04:00 PM
A ribbon-cutting ceremony and open house is scheduled for 2 p.m. to 4 p.m. Friday, Feb. 20, 2026. The two-story, 13,725-square-foot facility, located at 2020 Madison Drive, was approved by Arlington voters in the 2018 Bond Program.
Community members can tour the new Fire Station No. 8, which includes three drive-through apparatus bays, dorm rooms for firefighters, a day room and kitchen. The $13.9 million facility replaced the former Fire Station No. 8 station, which was smaller and originally opened in 1978.Â
More details:Â Join Us to Celebrate Opening of Fire Station No. 8 in North Arlington | City of Arlington, TX
Â
When
Friday, February 20, 2026 | 02:00 PM
– 04:00 PM
Location
Fire Station No. 8, 2020 Madison Drive, Arlington, TX, 76011, View Map
32.6680659,-97.18198699999999
2020 Madison Drive ,
Arlington, TXÂ 76011
Fire Station No. 8
2020 Madison Drive ,
Arlington, TXÂ 76011
Fire Station No. 8 Grand Opening