Several closures for Dallas Parkway — the Dallas North Tollway frontage road — and President George Bush Turnpike begin Monday night.
Travelers should expect detours and possible delays.
PGBT to I-20
The direct connector ramp from southbound PGBT to westbound Interstate 20 will close Monday at 9 p.m. and reopen Tuesday at 4 a.m. An overhead sign installation will occur.
Breaking News
To enter I-20, drivers will take the Mayfield Road and Forum Drive exit. After continuing south on State Highway 161/Lake Ridge Parkway, turn right onto the I-20 service road and follow signs to enter westbound I-20.

The direct connector ramp from southbound PGBT to westbound Interstate 20 will close Monday at 9 p.m. and reopen Tuesday at 4 a.m.
NTTA / NTTA
Dallas Parkway and DNT
The northbound right lane on Dallas Parkway from Interstate 635 to Galleria Drive will be closed from Monday, March 16 at 9 p.m. until Monday, March 23 at 5 a.m. The southbound right lane on Dallas Parkway from Alpha Road to I-635 will follow the same closure times.
Two various northbound lanes on Dallas Parkway from I-635 to Galleria Drive will be closed March 16-23 from 9 a.m. to 3 p.m. and again 8 p.m. to 5 a.m. Two southbound right lanes on Dallas Parkway from Alpha Road to I-635 will also be closed.
One lane in each direction will remain open at all times to help ease congestion. The closures are due to road repairs.

Various northbound and southbound lanes will be closed on Dallas Parkway.
NTTA / NTTA