Mayor Watson is scaling back on the $104 million cap-and-stitch proposal due to lack of city council support, changing plans for future downtown developments.
AUSTIN, Texas — Austin Mayor Kirk Watson is backing down from a proposal involving the “cap-and-stitch” plan in Downtown Austin.
The city’s “cap-and-stitch” project, first introduced in 2023, aimed to reconnect East Austin and downtown by building park spaces, or “caps,” over the highway as it expands. According to KVUE’s media partners at the Austin American-Statesman, the mayor’s proposal would scale back the project paying $49.8 million to completely fund one cap or park deck near Palm Park at Third Street.
However, it would also scale back the $104 million plan to start several decks around Central Austin but not finish them.
The more expensive plan would install the support columns needed to support future deck developments.
However, it was withdrawn after failing to get the necessary support from city council.
Under the current “cap-and-stitch” program, Austin will pay for columns to support three large decks and two smaller pedestrian bridges over Interstate 35. In a separate project, the Texas Department of Transportation (TXDOT) is working on expanding I-35 through Austin, including downtown.
The interstate would be submerged below ground with the proposed decks running over them.