EL PASO, Texas (KFOX14/ CBS4) — View the interactive TxDOT map and cameras here.

I-10 Widening West Project

Monday, June 1 – Saturday, June 6 (As Needed)

Daily, 9 a.m. – 4 p.m.

Nightly, 9 p.m. – 6 a.m.

I-10 east and westbound between Vinton and Resler alternate lane closuresNorth and South Desert between Vinton and Resler alternate lane closuresEntrance ramp, exit ramp, and U-turn, east and westbound between Vinton and Resler alternate lane closures

Crews will be working on punch list items.

I-10 Widening West 2 Project

Sunday, May 31- Saturday, June 6 (On-Going)

Continuous Closures

Full U-turn underpass at Bridge C between Anthony and Vinton closed

Detour

Traffic on North Desert will need to proceed to Anthony, TX and utilize U-turn BridgeTraffic on South Desert will need to proceed to Vinton, TX and utilize U-turn Bridge

Crews will be conducting Bridge Demolition and Bridge Construction on U-turns under I-10 at Bridge C

South Desert between Valley Chile and Vinton Steel left lane closed

Detour

Traffic will be kept in one lane, with access to entrance ramp at Valley Chile, then continue in one lane of traffic until past Bridge D at Vinton Steel

Crews will be working on bridge demolition and bridge construction.

North and South Desert at the Los Mochis intersection left lane closed

Crews will be working on Los Mochis intersection.

South Desert between Transmountain and Isela Rubalcalva right lane closedNorth Desert between Transmountain and Isela Rubalcalva left lane closed

Crews will be working on roadway reconfiguration for South Desert.

Monday, June 1- Saturday, June 6 (As Needed)

Daily, 9 a.m. – 4 p.m.

Nightly, 9 p.m. – 6 a.m.

I-10 east and westbound between Anthony and Nashua alternate lane closuresNorth and South Desert between Anthony and Nashua alternate lane closures

Crews will be conducting concrete paving, as well as paving trucks will be exiting the work area, crossing from median to I-10.

Monday, June 1 – Saturday, June 6 (As Needed)

9 a.m. – 4 p.m.

I-10 east and westbound Bypass lanes between Mesa and Redd full closure

Detour:

Traffic will continue along North Desert, through Thorn intersection, and enter I-10 before Redd.

Crews will be completing construction on ornamental fences and landscaping at Thorn.

I-10 westbound exit Ramp 10 (Redd) full closure

Detour:

Traffic to exit at Mesa, proceed onto North Desert through Mesa and Thorn intersections.

Crews will be working on striping repairs.

Artcraft Project

Monday, June 1 – Friday, June 5

9 a.m. – 4 p.m. (As Needed)

SH-178 (Artcraft) east and westbound between New Mexico State Line and Doniphan alternate lane closures

Crews will be working on ITS/illumination and MSE wall installation.

North Desert between Helen of Troy and Cheddars Restaurant alternate lane closuresSouth Desert between Charlie Clark Nissan and Blue Sky alternate lane closures

Crews will be loading and unloading material and equipment.

I-10 west and eastbound between Redd and Transmountain alternate lane closures

Crews will be working on median columns steel and erecting formwork.

Tuesday, June 2 – Friday, June 5

6 a.m. – 2 p.m.

Auxiliary lane between Clarkstone and Blue Sky closed

Crews will be removing formwork.

Tuesday, June 2 – Wednesday, June 3

9 a.m. – 4 p.m.

I-10 westbound entrance ramp before Artcraft closed

Crews will be removing formwork.

Continuous Closure Until Further Notice 24/7

Monday, June 1 – Beginning of August (Approx. 8-9 weeks)

Santiago at Artcraft intersection closed

Crews will be working on a water main, storm drain, and paving.

Continuous Closure Until Further Notice 24/7

Monday, March 9 – End of Aug. 2026 (Approx. 5 months)

I-10 westbound exit ramp to Transmountain closed

Crews will be working on various constructions.

Borderland Expressway Phase 2 Project

Monday, June 1 – Friday, June 5

Daily, 7 a.m. – 5 p.m.

US-54 east and westbound between Mesquite Hills and McCombs alternate lane closuresMesquite Hills reduced to one lane between US-54 and Red Man. Flaggers will be on-site directing traffic as needed for haul trucks crossing Mesquite Hills

Flaggers will be on-site directing traffic as needed for haul trucks crossing at McCombs and Stan Roberts intersection.

Crews will be transporting earth embankment into the project and installing portable concrete traffic barrier (PCTB).

Runaway Truck Ramp Project

Continuous Closure Until Further Notice 24/7

Loop 375 (Transmountain) east and westbound between Northwestern and I-10 left lane closedLoop 375 (Transmountain) east and westbound at Main Gap right lane closed

Crews will be installing arrest system and overhead signs.

Bridge Replacement at Alps Dr., Hollings St., and Concepcion St. Project

Continuous Closure Until Further Notice 24/7

Concepcion between Alameda and Paisano east and westbound closedAlps between Marie Tobin and Raymond Telles closedHollings between Raymond Telles and Hondo Pass closed

Crews will be working on culvert and bridge rehabilitation.

ITS on Bridge of the Americas and Zaragoza Port of Entry Project

Monday, June 1 – Friday, June 5

9:00 a.m. – 4:00 p.m.

Loop 375 (Border Highway) eastbound between San Marcial and Exit 58 (Ramp M) right two lanes and shoulder closed

Crews will be installing a cantilever sign for LRSS 14 sign and run power / communication.

Loop 375 (Border Highway) westbound between Fonseca and Paisano Exit right shoulder closed

Crews will be erecting Sign 15 Foundation.

US-54 at Altura entrance ramp between Frankfort and Gateway South shoulder closed

Crews will be installing ground boxes for DMS 15 Power.

US-54 southbound between Frankfort and Altura right lane closed

Crews will be installing the service pole.

Gateway South between Pershing and Cambridge median closed

Crews will be installing ground boxes.

US-54 South between Pershing and entrance ramp to Cambridge shoulder closed

Crews will be installing ground boxes for the communication of DMS 15 and Sign 5.

Improve Traffic Signals – Loop 478 at Yandell and Montana at Trowbridge

Monday, June 1 – Friday, June 5

9:00 a.m. – 4:00 p.m.

Yandell between North Grama and Stevens all directions right lane closedCopia between Wyoming and Tularosa all directions right lane closed

Crews will be installing new traffic signals, removing existing traffic signals, and demolition of existing drill shafts.

Loop-375 Rehabilitation Project

Sunday, May 31

8 p.m. – 6 a.m. (Nightly)

Loop 375 (Border Highway) westbound between Fonseca and Park full closure

Crews will be removing portable control traffic barrier.

Monday, June 1 – Thursday, June 4

8 p.m. – 6 a.m. (Nightly)

Loop 375 (Border Highway) west eastbound between Fonseca and Park alternate lane closuresLoop 375 (Border Highway) westbound between Fonseca and Park right lane closure

Crews will be asphalt milling and working on roadway base repair.

Districtwide Striping Project

Sunday, May 31 – Tuesday, June 2

9 p.m. – 5 a.m. (Nightly)

I-10 Frontage Road north and southbound between 0.22 miles west of RM 1111 and RM 1111 (in Sierra Blanca) mobile operationsFM-76 (North Loop) east and westbound between SH-20 (Alameda) and FM-793 (in Fabens) mobile operations

Crews will be working on reflectors and pavement markings.

Sunday, May 31 – Friday, June 5

9 p.m. – 5 a.m. (Nightly)

FM-659 (Zaragoza) north and southbound between North Loop and US-62/180 (Montana) mobile operations

Crews will be retracing pavement markings.

BU-54A Safety Improvements

Monday, June 1 – Wednesday, June 3

9 a.m. – 4 p.m.

Dyer northbound between Quail and Sun Valley right lane closed

Thursday, June 4 – Friday, June 5

9 a.m. – 4 p.m.

Dyer southbound between Quail and Sun Valley right lane closed

Crews will be working on potholing operations.

Road Repair

Monday, June 1 – Friday, June 5

9 p.m. – 6 a.m. (Nightly)

I-10 westbound between Geronimo and Cotton alternate lane closure

Crews will be repairing concrete potholes.

Guardrail Repair

Monday, June 1

9 a.m. – 4 p.m.

I-10 eastbound between Thorn and Mesa right lane closed

Tuesday, June 2

9 a.m. – 4 p.m.

Loop 375 (Transmountain) between Main Gap and US-54 left lane closed

Wednesday, June 3

9 a.m. – 4 p.m.

I-10 westbound between Sunland and Resler left lane closed

Crews will be repairing guardrails.

Miscellaneous Concrete

Sunday, May 31

5 a.m. – 4 p.m.

I-10 east between Downtown and Cotton 3 left lanes closed

Monday, June 1 – Friday, June 5

9 a.m. – 4 p.m.

I-10 West CD lanes between Sunland Park and Resler right lane closedMissouri at Staton intersection left lane closure on Missouri and right lane closure on StantonI-10 East between Prospect and Mesa right lane closed

Crews will be working on concrete repairs.

Maintenance

Sunday, May 31

4 a.m. – 5 p.m.

Ramp K between US-54 South and I-10 West closedEntrance ramp between Trowbridge and US-54 South closedBoone at Yandell complete closure

Crews will be working on bridge joints.

Monday, June 1 – Friday, June 5

9 a.m. – 4 p.m.

Gateway East between Tony Lama and Winslow right lane closed

Crews will be working on the inlet.

Ramp H between I-10 East and US-54 North alternate lane closures

Crews will be working on the bridge rail.

Dyer (Spur 478) north and southbound between US-54 and Pershing alternate lane closures

Crews will be installing signs.

FM 2529 (McCombs) southbound between David M Brown Court and Sean Haggerty right lane closed

Crews will be working on shoulder.

Loop 375 East by Fonseca exit right lane closedFonseca exit closed

Crews will be cleaning the drain.

Horizon/Darrington Reconstruction Project

Monday, June 1 – Friday, June 5

Daily, 9 a.m. – 5 p.m.

Horizon Boulevard east- and westbound alternating lane closures between Ashford Street and Desert Mesa DriveDarrington Road north- and southbound alternating lane closures between Homestead Drive and Nunda Drive

Crews will be paving and working on electrical work on islands and medians.

Continuous closure until July 2026

Darrington Road southbound full closure from Homestead Drive to Roslyn DriveDarrington Road and Roslyn/Alderwood Manor Drive intersection full closure

Crews will be installing water, sewer, and storm drain lines.

Bridge Maintenance Project

Monday, June 1 – Thursday, June 4

Nightly, 9 p.m. – 5 a.m.

I-10 eastbound alternate lane closures at Piedras Street overpassI-10 eastbound to US 54 eastbound connector alternate lane closures

Crews will be working on bridge.

Safety Lighting Project

Monday, June 1 – Friday, June 5

Daily, 9 a.m. – 4 p.m.

Titanic Avenue east- and westbound right shoulder closures between Howard Street and Pandora StreetCopia Street north-and southbound alternating lane closure between Wyoming Avenue and Hueco AvenueDyer Street north-and southbound alternating lane closure between Kemp Avenue and Van Buren Avenue

Crews will be doing shoulder work.

Sergeant Major Bridge Reconstruction Project

Monday, June 1 – Friday, June 5

9 a.m. – 5 p.m.

Purple Heart Highway (Loop 375) southbound and northbound left lane closure between Sergeant Major Entrance and Exit Ramps

Crews will be cleaning culverts.

Continuous closure until December 2026

Purple Heart Highway (Loop 375) north- and southbound Sargent Major Exit Ramps closed

Crews will be working on ramp widening and shared use path extension.

Purple Heart 375 Widening Project

Sunday, May 31 – Thursday, June 4

Nightly, 9 p.m. – 5 a.m.

Purple Heart Highway northbound full closure between Montana Avenue and Spur 601

Crews will be moving barrier.

Saturday, June 6

6 a.m. – 9 p.m.

Purple Heart Highway (Loop 375) northbound Spur 601 Exit Ramp closed

Crews will be paving temporary Entrance Ramp.

Continuous closure until further notice

Purple Heart Highway north- and southbound shoulder closures from Montana Avenue to Spur 601

Crews will widen main lanes and construct north- and southbound frontage roads.

PROJECTS WITH CONTINUOUS CLOSURES

Montana Widening Project

Continuous closure until December 2026

Montana Avenue eastbound frontage road reduced to one lane from Saul Kleinfield to Tierra Este RoadMontana Avenue and Joe Battle Boulevard intersection, northbound and southbound of Joe Battle through lanes closed.Montana Avenue westbound frontage road reduced to two lanes from Tierra Este Road to Joe Battle Boulevard

Crews will be working on building underpass.

I-10 Hudspeth Safety Rest Area

Continuous closure until December 2026

I-10 east- and westbound shoulder closure between Fort Hancock and McNary

Crews will be working on utility installation.

RM 652 Full Widening Project

Continuous closure until further notice

RM 652 westbound lanes reduced to one lane two-way traffic from FM 3541 to Kimble Draw Bridge

Closure is necessary for the reconstruction of the roadway.

RM 652 Full Depth Rehabilitation Project

Continuous closure until further notice

RM 652 east and westbound alternating lane closure 8.36 miles east of FM 3541 to Reeves County Line

Continuous two-way traffic, one-lane work zone requiring traffic to be alternating onto one lane and controlled by Temporary Traffic Signals with a 13-foot lane width restriction.

Closure is necessary for the construction of new roadway consisting of full depth rehabilitation

Please follow the detour signs in place on all projects. All work is dependent upon weather conditions.