EL PASO, Texas (KFOX14/ CBS4) — View the interactive TxDOT map and cameras here.

Artcraft Project

Monday, July 6 – Friday, July 10

9 p.m. – 6 a.m. (Nightly)

I-10 eastbound between Loop 375 (Transmountain) and Artcraft full closure

Crews will be conducting bridge deck operations.

Monday, July 6 – Friday, July 10

9 a.m. – 4 p.m. (As Needed)

SH-178 (Artcraft) east and westbound between New Mexico State Line and Doniphan alternate lane closures

Crews will be working on ITS/Illumination and MSE wall installation.

North Desert between Helen of Troy and Cheddars Restaurant alternate lane closuresSouth Desert between Charlie Clark Nissan and Blue Sky alternate lane closures

Crews will be forming bent caps.

I-10 west and eastbound between Redd and Transmountain alternate lane closures

Crews will be working on median columns steel and erecting formwork.

Continuous Closures Until Further Notice 24/7

Monday, June 1 – Beginning of August (Approx. 8-9 weeks)

Santiago at Artcraft intersection closed

Crews will be working on a water main, storm drain, and paving.

Monday, March 9 – End of Aug. 2026 (Approx. 5 months)

I-10 westbound exit ramp to Transmountain closed

Crews will be working on various constructions.

I-10 widening west closures

Phase I

Monday, July 6 – Friday, July 10 (As Needed)

Daily, 9 a.m. – 4 p.m.

I-10 east and westbound between Los Mochis and Mesa alternate lane closuresNorth and South Desert between Los Mochis and Mesa alternate lane closuresEntrance ramp, exit ramp, and U-turn, east and westbound between Los Mochis alternate lane closures

Crews will be working on construction items.

Phase II

Monday, July 6 – Saturday, July 11 (As Needed)

Daily, 9 a.m. – 4 p.m.

Nightly, 9 p.m. – 6 a.m.

I-10 east and westbound between Anthony and Mesa alternate lane closures (No Detour Needed)North and South Desert between Anthony and Mesa alternate lane closures (No Detour Needed)

Crews will be conducting concrete paving, as well as paving trucks will be exiting the work area, crossing from median to I-10.

Monday, July 6- Saturday, July 11 (As Needed)

9 a.m. – 4 p.m.

I-10 westbound Bypass lanes between Mesa and Redd full closure

Detour:

Traffic will continue along North Desert, through Thorn intersection, and enter I-10 before Redd.

Crews will be completing construction on ornamental fences and landscaping at Thorn.

I-10 eastbound Bypass lanes between Redd and Mesa full closure

Detour: Traffic will continue along South Desert, through the Thorn intersection, and enter I-10 before Mesa.

I-10 westbound Exit Ramp 10 (Redd) full closure

Detour:

Traffic to exit at Mesa, proceed onto North Desert through Mesa and Thorn intersections.

Crews will be working on ornamental fences and landscaping.

Continuous Closure Until Further Notice 24/7

Full U-turn underpass at Bridge C between Anthony and Vinton closed

Detour

Traffic on North Desert will need to proceed to Anthony, TX and utilize U-turn Bridge

Traffic on South Desert will need to proceed to Vinton, TX and utilize U-turn Bridge

Crews will be conducting Bridge Demolition and Bridge Construction on U-turns under I-10 at Bridge C

South Desert between Valley Chile and Vinton Steel left lane closed

Detour

Traffic will be kept in one lane, with access to entrance ramp at Valley Chile, then continue in one lane of traffic until past Bridge D at Vinton Steel

Crews will be working on bridge demolition and bridge construction.

North and South Desert at the Los Mochis intersection left lane closed

Crews will be working on Los Mochis intersection.

South Desert between Transmountain and Isela Rubalcalva right lane closedNorth Desert between Transmountain and Isela Rubalcalva left lane closed

Crews will be working on roadway reconfiguration for South Desert.

Borderland Expressway Phase 2 Project

Monday, July 6 – Friday, July 10

Daily, 7 a.m. – 5 p.m.

US-54 east and westbound between Mesquite Hills and McCombs alternate lane closuresMesquite Hills reduced to one lane between US-54 and Red Man. Flaggers will be on-site directing traffic as needed for haul trucks crossing Mesquite Hills

Flaggers will be on-site directing traffic as needed for haul trucks crossing at McCombs and Stan Roberts intersection.

Crews will be transporting earth embankment into the project.

Bridge Replacement at Alps Dr., Hollings St., and Concepcion St. Project

Continuous Closure Until Further Notice 24/7

Alps between Marie Tobin and Raymond Telles closed

Detour: Please follow and proceed with detours in the area.

Crews will be working on culvert and bridge rehabilitation.

ITS on Bridge of the Americas and Zaragoza Port of Entry Project

Monday, July 6 – Friday, July 10

9 a.m. – 4 p.m.

Loop 375 (Border Highway) east and westbound at Fonseca right lane closedLoop 375 (Border Highway) westbound at Midway right lane closedLoop 375 (Border Highway) westbound at Midway entrance ramp closedLoop 375 (Border Highway) west and eastbound at Padres right lane closed

Crews will be working on signs.

Traffic Signal Improvements – Loop 478 at Yandell and Montana at Trowbridge

Monday, July 6 – Friday, July 11

9 a.m. – 4 p.m.

Yandell between Gamma and Stevens all directions right lane closedCopia between Wyoming and Tularosa all directions right lane closed

Crews will be finishing tie-ins and all traffic signals, connection to new service pole, and connection from new service pole to the controller unit.

Loop 375 Rehabilitation Project

8 p.m. – 6 a.m. (Nightly)

Tuesday, July 7

Loop 375 (Border Highway) eastbound between Schuster and Paisano full closure

Tuesday, July 7 – Thursday, July 9

Loop 375 (Border Highway) west and eastbound between Fonseca and Oregon alternate lane closures

Tuesday, July 7 – Thursday, July 9

Loop 375 (Border Highway) eastbound between Paisano/Coles Exit 59 ramp full closure

Saturday, July 11

6 a.m. – 4 p.m.

Loop 375 (Border Highway) west and eastbound between Fonseca and Oregon alternate lane closure

Crews will be working on milling and paving.

BU-54A Safety Improvements

Monday, July 6 – Friday, July 10

Daily, 9 a.m. – 4 p.m.

BU-54A (Dyer) north and southbound between Quail and Sun Valley alternate lane closures

Crews will be working on potholing / boring operations.

Guardrail Repair

9 a.m. – 4 p.m.

Monday, July 6

Loop 375 (Border Highway) westbound at Yarbrough right lane closed

Tuesday, July 7

I-10 eastbound at Geronimo Exit 23-B full closure

Wednesday, July 8

I-10 westbound at Schuster right lane closed

Thursday, July 9

SH-20 (Doniphan) eastbound at Mulberry right lane closed

Friday, July 11

SH-20 (Doniphan) westbound at Chanate right lane closed

Crews will be repairing guardrails.

Road Repair

Monday, July 6

9 a.m. – 4 p.m.

US-54 West at Fred Wilson right lane closedFred Wilson Exit full closure

Maintenance

Monday, July 6 – Tuesday, July 7

Midnight – 6 a.m.

FM-3244 (Martin Luther King Blvd) south and northbound between Loma Real and Stan Roberts complete closure

Crews will be striping.

Monday, July 6 – Friday, July 10

9 a.m. – 4 p.m.

Ramp H between I-10 East and US-54 North right lane closed

Crews will be working on the bridge rail.

I-10 east between Airway and Hawkins alternate lane closuresAirways entrance ramp closedExecutive entrance ramp to Loop 375 East closed

Crews will be working on the bridge.

Sunday, July 12

4 a.m. – 5 p.m.

Ramp K between US-54 South and I-10 West closedEntrance ramp between Trowbridge and US-54 South closed

Crews will be working on bridge joints.

Horizon/Darrington Reconstruction Project

Monday, July 6 – Friday, July 10

Daily, 8 a.m. – 5 p.m.

Horizon Boulevard east- and westbound alternating lane closures between Darrington Road and Rodman StreetDarrington Road north- and southbound alternating lane closures between Homestead Drive and Nunda Drive

Crews will be performing electrical and concrete work.

Continuous closure until September 2026

Darrington Road southbound full closure from Homestead Drive to Roslyn DriveDarrington Road and Roslyn/Alderwood Manor Drive intersection full closure

Crews will be installing water, sewer, and storm drain lines.

Safety Lighting Project

Monday, July 6 – Friday, July 10

Daily, 9 a.m. – 4 p.m.

Titanic Avenue east- and westbound right shoulder closures between Howard Street and Pandora StreetCopia Street north-and southbound alternating lane closure between Wyoming Avenue and Hueco AvenueDyer Street north-and southbound alternating lane closure between Kemp Avenue and Van Buren Avenue

Crews will be doing shoulder work.

I-10 Hudspeth Safety Rest Area

Monday, July 6 – Friday, July 10

Daily, 9 a.m. – 4 p.m.

I-10 alternating east- and westbound right lane closure between MM 76 and MM 79

Crews will be moving concrete barriers.

Continuous closure until December 2026

I-10 east- and westbound shoulder closure between Fort Hancock and McNary

Crews will be working on utility installation.

FM 258 Safety Improvements

Wednesday, July 8 – Friday, July 10

Daily, 8:00 a.m. – 4 p.m.

Socorro Road eastbound right and turning lanes closed from Winn Road to Belen Road.

Crews will be installing new mailboxes.

Sergeant Major Bridge Reconstruction Project

Monday, July 6 – Wednesday, July 8

1 a.m. – 3 p.m.

Purple Heart Highway (Loop 375) north- and southbound right lanes between Sargent Major Exit Ramps and Entrance Ramps.

Friday, July 10

1 a.m. – 3 p.m.

Purple Heart Highway (Loop 375) north- and southbound right lanes between Sargent Major Exit Ramps and Entrance Ramps.

Crews will be pouring concrete.

Continuous closure until December 2026

Purple Heart Highway (Loop 375) north- and southbound Sargent Major Exit Ramps closed

Crews will be working on ramp widening and shared use path extension.

PROJECTS WITH CONTINUOUS CLOSURES

Montana Widening Project

Continuous closure until December 2026

Montana Avenue eastbound frontage road reduced to one lane from Saul Kleinfield to Tierra Este RoadMontana Avenue and Joe Battle Boulevard intersection, northbound and southbound of Joe Battle through lanes closed.Montana Avenue westbound frontage road reduced to two lanes from Tierra Este Road to Joe Battle Boulevard

Crews will be working on building underpass.

Purple Heart 375 Widening Project

Continuous closure until further notice

Purple Heart Highway north- and southbound shoulder closures from Montana Avenue to Spur 601

Crews will widen main lanes and construct north- and southbound frontage roads.

RM 652 Full Widening Project

Continuous closure until further notice

RM 652 westbound lanes reduced to one lane two-way traffic from FM 3541 to Kimble Draw Bridge

Closure is necessary for the reconstruction of the roadway.

RM 652 Full Depth Rehabilitation Project

Continuous closure until further notice

RM 652 east and westbound alternating lane closure 8.36 miles east of FM 3541 to Reeves County Line

Continuous two-way traffic, one-lane work zone requiring traffic to be alternating onto one lane and controlled by Temporary Traffic Signals with a 13-foot lane width restriction.

Closure is necessary for the construction of new roadway consisting of full depth rehabilitation

Please follow the detour signs in place on all projects. All work is dependent upon weather conditions