EL PASO, Texas (KFOX14/ CBS4) — View the interactive TxDOT map and cameras here.
I-10 Widening West Project
Monday, August 10 – Friday, August 14 (As Needed)
Daily, 9 a.m. – 4 p.m.
I-10 east and westbound between Los Mochis and Mesa alternate lane closuresNorth and South Desert between Los Mochis and Mesa alternate lane closuresEntrance ramp, exit ramp, and U-turn, east and westbound between Los Mochis alternate lane closures
Crews will be working on construction punch list items.
I-10 Widening West 2 Project
Saturday, August 8
3 a.m. – 3 p.m.
I-10 eastbound between Anthony and Los Mochis full closure
Detour: Traffic will exit at Anthony, proceed onto South Desert through the Anthony and Vinton intersections, and enter at I-10 eastbound after Los Mochis.
Crews will be placing beams.
Monday, August 10 and Tuesday, August 11
Nightly, 9 p.m. – 6 a.m.
I-10 eastbound between Anthony and Los Mochis full closure
Detour: Traffic will exit at Anthony, proceed onto South Desert through the Anthony and Vinton intersections, and enter I-10 eastbound after Los Mochis.
Crews will be placing beams.
Monday, August 10 – Saturday, August 15 (As Needed)
Daily, 9 a.m. – 4 p.m.
Nightly, 9 p.m. – 6 a.m.
I-10 east and westbound between Anthony and Mesa alternate lane closures (No Detour Needed)North and South Desert between Anthony and Mesa alternate lane closures (No Detour Needed)
Crews will be conducting dirt work and miscellaneous removals.
Monday, August 10 – Saturday, August 15 (As Needed)
9 a.m. – 4 p.m.
I-10 east and westbound Bypass lanes between Mesa and Redd full closure
Detour: Traffic will continue along South Desert, through the Thorn intersection, and enter I-10 before Mesa. Traffic will continue along North Desert, through Thorn intersection, and enter I-10 before Redd.
Crews will be completing construction of ornamental fences and landscaping at Thorn.
I-10 westbound exit Ramp 05 at Los Mochis full closure
Detour: Traffic to proceed on North Desert through the Vinton intersection.
Crews will be working on landscaping.
Continuous Closures Until Further Notice 24/7
Full U-turn underpass at Bridge C between Anthony and Vinton closed
Detour: Traffic on North Desert will need to proceed to Anthony, TX and utilize U-turn Bridge. Traffic on South Desert will need to proceed to Vinton, TX and utilize U-turn Bridge
Crews will be conducting Bridge Demolition and Bridge Construction on U-turns under I-10 at Bridge
South Desert between Valley Chile and Vinton Steel left lane closed
Detour: Traffic will be kept in one lane, with access to entrance ramp at Valley Chile, then continue in one lane of traffic until past Bridge D at Vinton Steel
Crews will be working on Walls 13 and 14.
South Desert between Transmountain and Isela Rubalcava left lane closed
Crews will be working on lane reconfiguration for South Desert at Tractor Supply.
North and South Desert at the Los Mochis intersection left lane closed
Crews will be working on Los Mochis intersection.
Campus Park intersection at South Desert closed
Crews will be conducting paving operations.
Monday, March 9 – End of August 2026 (Approx. 5 months)
I-10 westbound exit ramp to Transmountain closedSecondary temporary exit ramp to Transmountain open
Crews will be working on various constructions.
Artcraft Project
Sunday, August 9 – Thursday, August 13
Sunday, August 16 – Thursday, August 20
9 p.m. – 6 a.m. (Nightly)
I-10 east and westbound between Loop 375 (Transmountain) and Artcraft full closure
Crews will be placing steel girders and welding operations.
Monday, August 10 Continuous Closure (4 – 6 week closure)
9 p.m. – 6 a.m. (Nightly)
Intersection of Berringer through Artcraft access closure
Detour: Artcraft westbound traffic must exit at Doniphan and turn right, then proceed on Doniphan and turn right on East Borderland, then continue and turn right on Berringer.
Crews will be working on a water main bore.
Monday, August 10 – Friday, August 14
9 a.m. – 4 p.m. (As Needed)
SH-178 (Artcraft) east and westbound between New Mexico State Line and Doniphan alternate lane closures
Crews will be working on ITS/Illumination and MSE wall installation.
North Desert between Helen of Troy and Cheddars Restaurant alternate lane closuresSouth Desert between Charlie Clark Nissan and Blue Sky alternate lane closures
Crews will be forming bent caps.
I-10 west and eastbound between Redd and Transmountain alternate lane closures
Crews will be working on median columns steel and erecting formwork.
Continuous Closures Until Further Notice 24/7
Santiago at Artcraft intersection closed
Crews will be working on a water main, storm drain, and paving.
Borderland Expressway Phase 2 Project
Tuesday, August 11 and Thursday, August 13
Daily, 6 a.m. – 6 p.m.
Stan Roberts east and westbound between McCombs and Martin Luther King full closure
Access to EPEC Newman Power Plant will be available via Martin Luther King and Stan Roberts intersection.
Detour: Traffic will be detoured using McCombs, US-54, and Martin Luther King.
Crews will be installing bridge beams.
Monday, August 10 – Friday, August 14
Daily, 7 a.m. – 5 p.m.
US-54 east and westbound between Mesquite Hills and McCombs alternate lane closuresMesquite Hills reduced to one lane between US-54 and Red Man.Flaggers will be on-site directing traffic as needed for haul trucks crossing Mesquite HillsFlaggers will be on-site directing traffic as needed for haul trucks crossing at McCombs and Stan Roberts intersection.
Crews will be transporting earth embankment into the project
Bridge Replacement at Alps Dr., Hollings St., and Concepcion St. Project
Continuous Closure Until Further Notice 24/7
Alps between Marie Tobin and Raymond Telles closedHollings between Raymond Telles and Hondo Pass closed
Detour: Please follow and proceed with detours in the area.
Crews will be working on culvert and bridge rehabilitation.
ITS on Bridge of the Americas and Zaragoza Port of Entry Project
Monday, August 10 – Friday, August 14
9:00 a.m. – 4:00 p.m.
Loop 375 (Border Highway) eastbound between Zaragoza and Padres right lane and shoulder closedLoop 375 (Border Highway) westbound between Padres and Zaragoza entrance ramp closedLoop 375 (Border Highway) westbound between Padres and Zaragoza right lane and shoulder closedLoop 375 (Border Highway) eastbound between Midway and Columbia Apartments right lane and shoulder closedLoop 375 (Border Highway) eastbound between Fonseca and Midway right lane and shoulder closedUS-54 southbound between Cambridge and Altura shoulder and right lane closed
Crews will be working on signs and infrastructure.
Safety Improvements -Median and Sidewalks at SH-20, BU-54A, IH-10 and McCombs
Monday, August 10 – Friday, August 14
7 a.m. – 4 p.m.
Alameda (SH-20) westbound between Morning Glory Rd and Connington St. right lane closedAlameda (SH-20) westbound between Morning Glory Rd and Denten Rd. right lane closed
Crews will be working on prepping, blading, forming, and placing rebar for concrete placement.
Improve Traffic Signals – Loop 478 at Yandell and Montana at Trowbridge
Monday, August 10 – Friday, August 14
7:00 a.m. – 4:00 p.m.
Montana between Chelsea Street and McAffee Place all directions right lane closedTrowbridge between Paisano and Forest Way all directions right lane closed
Crews will be performing demolition and layout of new corners for the ADA ramps and the adjustments for the new traffic signals and PED poles.
Loop 375 Rehabilitation Project
Sunday, August 9 – Thursday, August 13
8 p.m. – 6 a.m. (Nightly)
Loop 375 (Border Highway) westbound between Fonseca and Oregon full closureLoop 375 (Border Highway) eastbound between Schuster and Fonseca full closureLoop 375 (Border Highway) eastbound entrance ramp from Paisano full closureLoop 375 (Border Highway) eastbound entrance ramp from US-54 full closure
Saturday, August 15
6 a.m. – 5 p.m.
Loop 375 (Border Highway) eastbound between Schuster and Fonseca full closureLoop 375 (Border Highway) eastbound entrance ramp from Paisano full closureLoop 375 (Border Highway) eastbound entrance ramp from US-54 full closureLoop 375 (Border Highway) west and eastbound between Fonseca and Oregon alternate lane closures
Crews will be working on milling, paving, and installing guardrail.
Districtwide Striping Project
Sunday, August 9 – Thursday, August 13
9 p.m. – 6 a.m. (Night)
I-10 east and westbound between Horizon and Paisano mobile operations
Crews will be removing and installing pavement markings.
BU-54A Safety Improvements
Monday, August 10 – Friday, August 14
Daily, 9 a.m. – 4 p.m.
BU-54A (Dyer) north and southbound between Ashley and Mesquite Flor right lane and shoulder alternate lanes closedMesquite Hills between Jim Webb and Dyer right lane closed
Crews will be working on concrete work.
Guardrail Repair
9 a.m. – 4 p.m.
Monday, August 10
North Desert turnaround to South Desert at Vinton complete closure
Tuesday, August 11
Spur 601 westbound entrance ramp to US-54 North complete closure
Wednesday, August 12
Loop 375 westbound between US-54 and Main Gap picnic area left lane closed
Thursday, August 13
North Desert between Artcraft and Trade Center left lane closed
Friday, August 14
North Desert at Trade Center left lane closed
Crews will be repairing guardrails.
Maintenance
Monday, August 10 – Friday, August 14
9 a.m. – 4 p.m.
Loop 375 (Transmountain) westbound between Tom Mays Park entrance and Paseo Del Norte right lane closed
Crews will be working on the shoulder.
Spur 601 east and westbound between Chaffee and US-54 alternate lane closuresSpur 601 east and westbound at Chaffee entrance and exit ramps closedCotton north and southbound between San Antonio and Delta alternate lane closure
Crews will be working on crack sealing.
Sunland Park westbound between Mesa Hills and I-10 right lane closed
Crews will be milling and paving.
Gateway North between Yandell and Montana right lane closed
Crews will be working on concrete.
Executive exit ramp to Loop 375 (Border West Highway) westbound closed
Crews and Signal Shop removing signs.
Sunday, August 16
4 a.m. – 5 p.m.
Ramp K between US-54 South and I-10 West closedEntrance ramp between Trowbridge and US-54 South closedI-10 West between US-54 and Piedras three right lanes closed
Crews will be working on bridge.
Horizon/Darrington Reconstruction Project
Monday, August 10 – Friday, August 14
Daily, 8 a.m. – 5 p.m.
Horizon Boulevard east and westbound alternating lane closures between Horizon Crossing Street and Rodman Street.Darrington Road north and southbound alternating lane closures between Kingston Road and Nunda Drive
Crews will be conducting electrical, concrete, sign, and landscaping work.
Continuous closure until September 2026
Darrington Road southbound full closure from Homestead Drive to Roslyn DriveDarrington Road and Roslyn/Alderwood Manor Drive intersection full closure
Crews will be installing water, sewer, and storm drain lines.
Safety Lighting Project
Monday, August 10 – Friday, August 14
Daily, 9 a.m. – 4 p.m.
Gateway East and West alternating lane and ramp closures from Raynolds Street to Paisano DriveTitanic Avenue east- and westbound right shoulder closures between Howard Street and Pandora StreetCopia Street north-and southbound alternating lane closure between Wyoming Avenue and Hueco AvenueDyer Street north-and southbound alternating lane closure between Van Buren Avenue and Kemp AvenueI-10 east and westbound alternating lane closures between Acala Road and Finley Road
Crews will be doing shoulder work.
Sergeant Major Bridge Reconstruction Project
Monday, August 10 – Friday, August 14
Nightly, 12 a.m. – 3 p.m.
Purple Heart Highway (Loop 375) north- and southbound right lanes between Sergeant Major Exit and Entrance Ramps.
Crews will be placing Continuously Reinforced Concrete Pavement (CRCP).
PROJECTS WITH CONTINUOUS CLOSURES
I-10 Hudspeth Safety Rest Area
Continuous closure until December 2026
I-10 east- and westbound shoulder closure between Fort Hancock and McNary
Crews will be working on utility installation.
Montana Widening Project
Continuous closure until December 2026
Montana Avenue eastbound frontage road reduced to one lane from Saul Kleinfield to Tierra Este RoadMontana Avenue and Joe Battle Boulevard intersection, northbound and southbound of Joe Battle through lanes closed.Montana Avenue westbound frontage road reduced to two lanes from Tierra Este Road to Joe Battle Boulevard
Crews will be working on building underpass.
Purple Heart 375 Widening Project
Continuous closure until further notice
Purple Heart Highway north- and southbound shoulder closures from Montana Avenue to Spur 601
Crews will widen main lanes and construct north- and southbound frontage roads.
RM 652 Full Widening Project
Continuous closure until further notice
RM 652 westbound lanes reduced to one lane two-way traffic from FM 3541 to Kimble Draw Bridge
Closure is necessary for the reconstruction of the roadway.
RM 652 Full Depth Rehabilitation Project
Continuous closure until further notice
RM 652 east and westbound alternating lane closure 8.36 miles east of FM 3541 to Reeves County Line
Continuous two-way traffic, one-lane work zone requiring traffic to be alternating onto one lane and controlled by Temporary Traffic Signals with a 13-foot lane width restriction.
Closure is necessary for the construction of new roadway consisting of full depth rehabilitation
Please follow the detour signs in place on all projects. All work is dependent upon weather conditions.