Texas News Beep | NewsBeep.com
  • News Beep
  • Texas
  • Houston
  • San Antonio
  • Dallas
  • Fort Worth
  • Austin
  • United States
Texas News Beep | NewsBeep.com
Texas News Beep | NewsBeep.com
  • News Beep
  • Texas
  • Houston
  • San Antonio
  • Dallas
  • Fort Worth
  • Austin
  • United States
TxDOT schedules public meeting for FM 835 bridge replacement project
LLubbock

TxDOT road repairs on FM 179 to close stretch of Lubbock roadway this week

  • August 11, 2026

LUBBOCK, Texas (KCBD) – The Texas Department of Transportation is making road repairs to FM 179 between 4th Street and 19th Street that may affect commuters this week and next.

FM 179 will be closed to traffic during operations but will reopen between the two phases. Drivers should avoid the area if possible.

Phase 1: Aug. 10–13

Phase 1 operations began Monday and run through Thursday, Aug. 13. Work during this phase covers FM 179 from 19th Street to 10th Street.

Phase 2: Aug. 17–18

Phase 2 will focus on FM 179 from 10th Street to 4th Street and is scheduled for Monday, Aug. 17 and Tuesday, Aug. 18.

Copyright 2026 KCBD. All rights reserved.

  • Tags:
  • FM 179 construction 2026
  • FM 179 road closure Lubbock
  • kcbd
  • Local
  • Lubbock
  • Lubbock Headlines
  • Lubbock News
  • Lubbock traffic alert
  • TxDOT
  • TxDOT Lubbock road repairs
Texas News Beep | NewsBeep.com
www.newsbeep.com