Texas News Beep | NewsBeep.com
  • News Beep
  • Texas
  • Houston
  • San Antonio
  • Dallas
  • Fort Worth
  • Austin
  • United States
Texas News Beep | NewsBeep.com
Texas News Beep | NewsBeep.com
  • News Beep
  • Texas
  • Houston
  • San Antonio
  • Dallas
  • Fort Worth
  • Austin
  • United States
Paving operations scheduled for US 84/FM 179 intersection
LLubbock

Paving operations scheduled for US 84/FM 179 intersection

  • September 26, 2026

SHALLOWATER, Texas (KCBD) – The Texas Department of Transportation is scheduled to make road repairs to the US 84/FM 179 intersection in Shallowater next week.

Operations to mill and resurface a segment of the US 84 main lanes, on- and off-ramps, and a portion of FM 179 are scheduled to start Tuesday, Sept. 29, and continue through Friday, Oct. 9.

Drivers can anticipate delays and various FM 179 lane and US 84 main lane and ramp closures during the operations. Traffic will be detoured via Loop 388 when the US 84 on- and off-ramps are closed.

No nighttime closures are planned.

Message boards are in place alerting drivers of the planned work. The operations will take place weather permitting.

Copyright 2026 KCBD. All rights reserved.

  • Tags:
  • kcbd
  • Local
  • Lubbock
  • Lubbock Headlines
  • Lubbock News
  • News
  • Paving operations
  • shallowater
  • The Texas Department of Transportation
  • US 84/FM 179 intersection
Texas News Beep | NewsBeep.com
www.newsbeep.com