AUSTIN, Texas — Austin’s Waller Creek is getting a much-needed transformation.
“Previously, this was the most eroded and damaged creek in downtown,” said John Rigdon, Chief Planning and Design Officer with the Waller Creek Conservancy.
What was a neglected, eroded and flood-prone downtown creek is now a lush, thriving ecosystem.
“We often talk about projects like this as environmental restoration. But this is really environmental reconstruction down here,” said Rigdon.
A 13-acre stretch from 4th Street to Lady Bird Lake was rebuilt and is ready to be unveiled to the public.
Waterloo Greenway Phase II: The Confluence is a walkable link that features a boardwalk, three lattice bridges, and bike and pedestrian trails.
The focus of this phase of the project is not only to provide beautiful, shared spaces but to make sure that beneath the surface the infrastructure is working to improve water quality and the creek environment.
On a tour of the 13-acre park and trail system, CBS Austin asked Rigdon how the $91 million project will improve Austin’s quality of life.
“The temperatures down here along the creek trail are 5 to 7 degrees cooler than up on the street level sidewalks,” said Rigdon.
Approximately 1,600 trees, 200,000 plants and the healthy flow of Waller Creek along the trail are making downtown Austin more inviting to people, turtles, fish and birds.

Waterloo Greenway Phase II: The Confluence is a walkable link that features a boardwalk, three lattice bridges, and bike and pedestrian trails. A 13-acre stretch from 4th Street to Lady Bird Lake was rebuilt and is ready to be unveiled to the public. (Photo: Bettie Cross)
“We have seen four different species of heron and two species of egrets down here,” said Rigdon during our walking tour.
To restore this section of Waller Creek, it took the addition of unique features such as a biofiltration pond.
“It treats the runoff from 26 acres of downtown streets. It is removing debris, removing the petrochemicals from the water that runs off through a series of chambers made only with sand, soil, and natural plant materials,” said Rigdon. “That feature is the centerpiece of our $12 million partnership with the U.S. Army Corps of Engineers where we have received federal funding for this phase through their environmental infrastructure program.”
The Waterloo Greenway Conservancy sees Phase 2 of the project as more than a downtown park. It is described as green infrastructure for an ecosystem that will grow and thrive for hundreds of years.
The ribbon-cutting and grand opening for The Confluence will be on Saturday, June 6. It will be the first time the public gets to walk the half mile trail and see the green space.
WATERLOO GREENWAY GRAND OPENING OF PHASE II: THE CONFLUENCE
WHEN: Saturday, June 6 | 10 a.m. to 2 p.m.WHERE: Ribbon-cutting ceremony at 10 a.m. at 74 Trinity St.PRICE: Free to attendPARKING: Affordable event parking will be available for $5 at the Austin Convention Center 5th St. Garage at 601 E. 5th St.
Ridesharing and use of public transit are also encouraged.