{"id":114857,"date":"2026-01-08T00:52:09","date_gmt":"2026-01-08T00:52:09","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-tx\/114857\/"},"modified":"2026-01-08T00:52:09","modified_gmt":"2026-01-08T00:52:09","slug":"are-we-there-yet-corpus-christi-marina-makeover-is-finally-almost-done","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-tx\/114857\/","title":{"rendered":"Are we there yet? Corpus Christi marina makeover is finally almost done"},"content":{"rendered":"<p>Inside the marina\u2019s massive makeover with&#13;<br \/>\nnew docks, deeper water, and a boardwalk built for the long haul.<\/p>\n<p>CORPUS CHRISTI, Texas \u2014 The $27 million transformation of Corpus Christi\u2019s marina is finally sailing into the home stretch.<\/p>\n<p><a href=\"https:\/\/www.kiiitv.com\/article\/news\/local\/marina-businesses-carry-on-through-construction\/503-cf1d7e74-440f-483e-966c-21823ceabb3b\" rel=\"nofollow noopener\" target=\"_blank\">After months of construction<\/a>, detours, and the occasional \u201care we there yet?\u201d moment, city leaders say the bulk of the work could wrap up as soon as next month.<\/p>\n<p>Crews have been working steadily as the long-awaited waterfront overhaul starts to look less like a construction zone and more like a postcard.<\/p>\n<p>Across the marina, old docks are being ripped out and replaced, dredging crews are deepening the water below, and along People\u2019s Street T-Head, a brand-new boardwalk is taking shape plank by plank. The goal: a cleaner, more modern waterfront built to last.<\/p>\n<p>City officials say the work has been paid for through the city\u2019s Type A funding.<\/p>\n<p>\u201cAll of the current ongoing projects at the marina were funded through the Type A fund,\u201d said Jonathan Atwood, interim assistant director with the City of Corpus Christi Parks Department. \u201cThe dock project that is going on behind me, the replacement of five docks, basically a third of the total docks in the marina, was approximately about $20 million.\u201d<\/p>\n<p>The People\u2019s Street Boardwalk itself carries a price tag of about $7 million and is expected to be completed by the end of next month.<\/p>\n<p>For nearby businesses, that timeline can\u2019t come soon enough.<\/p>\n<p>Harrison\u2019s Landing, which sits directly along the popular walkway, says construction delays have taken a toll, especially heading into what\u2019s typically the slowest time of year.<\/p>\n<p>\u201cThe project and the delays have had an impact on our business,\u201d said co-owner Hank Harrison. \u201cGiven that we\u2019re going into some of the slowest months of the year, you probably noticed a number of businesses shut down seasonally, so we thought this year we would do the same. When we come back, we want to be cleaned up and stronger than ever.\u201d<\/p>\n<p>And the construction isn\u2019t stopping when this phase ends.<\/p>\n<p>City planners are already moving forward with the next major upgrade at the Cooper\u2019s Alley L-Head. That project is expected to cost about $8 million and will replace an aging boater&#8217;s facility with a newer structure designed to better handle flooding.<\/p>\n<p>\u201cThe new facility will actually be lifted up,\u201d Atwood said. \u201cIt will be 13 to 14 feet off the ground per floodplain regulations. It\u2019s going to have a meeting room for boaters and public restrooms.\u201d<\/p>\n<p>Once the barricades come down and the dust settles, city leaders hope the marina will feel less like a job site and more like a destination.<\/p>\n<p>A place with ocean breezes, waterfront views, and a laid-back coastal vibe&#8230;the kind of spot Jimmy Buffett made famous in Margaritaville.<\/p>\n","protected":false},"excerpt":{"rendered":"Inside the marina\u2019s massive makeover with&#13; new docks, deeper water, and a boardwalk built for the long haul.&hellip;\n","protected":false},"author":2,"featured_media":114858,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[155,157,156],"class_list":{"0":"post-114857","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-corpus-christi","8":"tag-corpus-christi","9":"tag-corpus-christi-headlines","10":"tag-corpus-christi-news"},"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/114857","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/comments?post=114857"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/posts\/114857\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media\/114858"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/media?parent=114857"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/categories?post=114857"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-tx\/wp-json\/wp\/v2\/tags?post=114857"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}